Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Quality inspector taking dimensions on a finished steel member

Dimensional check by QC in Vietnam before a member goes on to blasting and paint.

Resource library · World Steel USA

Everything a US buyer reads before ordering steel from Vietnam

US codes, seismic and hurricane design, state and port guides, Incoterms, shipping and drawings in one free library, each guide clear on what World Steel does in its own plant and what stays with your US team.

Search the library

Find the guide that answers your question

Download centerIAS AC472 certificates, sample submittal documents, brochures and publications: download them or read them online. Open the download center

Start here

Pick your role, read the four pages that answer your first question

A US steel building has many readers. Each path below is the short list our engineers send when that reader asks us where to begin.

The library

Every guide, standard and tool, sorted by topic

Filter by topic or search by code, state, port or trade term. For every other page on the site, see the full sitemap.

US codes & standards · 20

The building codes, load standards and steel, welding and bolting specifications our buildings are designed to, one guide each.

US codes & standards center
State and Local Building Code Adoption The IBC is a model code: it has no force until a state, county or city adopts it, often years after publication and usually with local amendments. Some states adopt one… Standard IBC · International Building Code Every state builds its commercial code on the IBC. For a steel building, three chapters do most of the work: 16 brings in ASCE 7 loads, 22 brings in the AISC and AISI… Standard IEBC · International Existing Building Code The ICC code for work on buildings that already stand: additions, alterations, repairs and changes of occupancy. It decides how much of the existing structure has to be… Standard ASCE 7 · Minimum Design Loads and Associated Criteria for Buildings and Other Structures The US load standard for dead, live, snow, rain, wind, seismic and, since the 2022 edition, tornado loads on certain buildings. Frames and cladding are checked against… Standard AISC 360 · Specification for Structural Steel Buildings The American specification that governs strength and stability checks for structural steel members and their connections. Standard AISC 341 · Seismic Provisions for Structural Steel Buildings Extra member, connection, welding and material rules for steel systems expected to yield in a strong earthquake. Standard AISI S100 · North American Specification for the Design of Cold-Formed Steel Structural Members How light-gauge steel is designed, which in a metal building means the roof purlins, wall girts and eave struts. Standard MBMA · Metal Building Systems Manual The US industry reference for pre-engineered metal buildings: how code loads are applied to a metal building, collateral and crane loads, serviceability guidance, and the… Standard AISC DG · AISC Design Guides 7 and 25 AISC Design Guide 7 covers industrial buildings, crane runways and their columns; Design Guide 25 covers frame design with web-tapered members, the backbone of a… Standard AWS D1.1 · Structural Welding Code — Steel The American welding code for structural steel: how procedures are written and proven, how welders qualify and how welds are inspected. Sheet steel falls under AWS D1.3. Standard AWS D1.3 · Structural Welding Code — Sheet Steel The American welding code for structural sheet steel up to 4.8 mm (3/16 in) thick: arc spot and arc seam welds, fillet and flare-groove welds on cold-formed members and… Standard AWS D1.8 · Structural Welding Code — Seismic Supplement The supplement to AWS D1.1 for welds in seismic force-resisting systems designed to AISC 341: notch-tough filler metal, demand-critical welds, weld access holes,… Standard RCSC · Specification for Structural Joints Using High-Strength Bolts Sets the rules for installing, pretensioning and inspecting high-strength bolted joints. Standard ASTM · ASTM Material Standards The material standards a US steel specification usually names: A992, A572, A36 and A6 for structural steel, A653 and A1011 for strip, F3125 for bolts, F1554 for anchor… Standard Connections · Structural Connections Knee and ridge end plates, brace gussets and base plates: the joints that turn separate members into one frame. Standard Shop Drawings · Shop Drawing Coordination Approval, shop, erection and as-built drawings issued under revision control. Standard BIM / Tekla · BIM and Tekla Structures Your building modeled in Tekla Structures, joint by joint, before fabrication. Standard LRFD Guide Specifications for the Design of Pedestrian Bridges The AASHTO guide specification for bridges that carry people, bicycles and light maintenance vehicles: pedestrian live load, vehicle loads where vehicles can get on,… Standard SSPC · SSPC Surface Preparation and Coating Application Standards The US standards for cleaning steel before it is painted and for checking the paint once it is on: solvent, hand-tool, power-tool and abrasive blast cleaning grades… Standard AMPP · AMPP Coating and Corrosion Standards (formerly NACE and SSPC) The body that now publishes the SSPC and NACE coating standards, including the joint surface preparation standards such as SSPC-SP 10/NACE No. 2, and runs the coating… Standard

Insights for US contractors · 6

Articles by World Steel engineers on buying, checking, protecting and shipping structural steel for US projects.

All insights
Vibrating equipment supports in mill buildings: fans, screens, crushers and resonance A fan that runs smoothly on the test bench can shake a platform to pieces if the steel under it is tuned to the same frequency. AIST TR-13 lists the equipment that… Article UPS and battery rooms: the heaviest floor in the data center Batteries are dense, and a UPS system for a large data hall holds a great many of them. Battery rooms carry some of the highest floor loads in the building, need… Article TIA-942 ratings and the building: what Rated 1 to 4 asks of the structure ANSI/TIA-942 is best known as a cabling standard, but its rating system covers the whole facility, including the architectural and structural side. Here is how the… Article Sustainable data center planning: where the structural steel frame fits A sustainable data center is decided long before the first column is set. Strategy, location and life-cycle thinking come first, and each of them leaves a mark on the… Article Raised floor or slab? Choosing the data hall floor and what it means for the steel For years every data center sat on a raised floor. Now many hyperscale halls put cabinets straight on the slab and run everything overhead. The Data Center Handbook… Article Performance-based seismic design for data centers: designing for downtime, not just collapse Code seismic design aims to prevent collapse. A data center owner cares about something else: will the facility keep running, and how long will repairs take?… Article

Accreditation & quality records · 5

What your building official and special inspector can check before the steel leaves Vietnam.

Engineering for US site conditions · 8

Wind, snow, earthquake, corrosion and energy: how each US site condition shapes the steel.

Engineering overview

Design, drawings & supply options · 8

How we design, draw and supply your building, and what your Engineer of Record receives to review and approve.

All solutions

Structural steel by project type · 9

Heavy industry, oil and gas, food plants, warehouses, cold storage, energy, multi-story and long spans: what drives the steel in each.

Structural steel by project type overview

Structural steel fire protection · 7

IBC ratings, UL-listed designs and products, intumescent vs SFRM, shop-applied coating, UL 1709 and inspection.

Structural steel fire protection overview

Mining steel structures · 10

Process plants, crusher and screen buildings, conveyor galleries, transfer towers, stockpile covers, pipe racks and remote-site delivery.

Mining steel structures overview

Pedestrian bridges · 8

Truss footbridges, multi-bridge programs, skywalks, shop trial assembly, shipping long spans, coatings, stair towers and drawings.

Pedestrian bridges overview

Caribbean hurricanes and salt air · 8

Hurricane wind and roof uplift, ISO 12944 C5 and CX coatings, galvanizing and duplex, coastal detailing, earthquakes, rebuild programs and storm checks.

Hurricane and marine overview
Hurricane wind design How Caribbean steel structures are designed for hurricane wind: CUBiC, OECS and IBC-based codes, ASCE 7 velocity pressure, exposure, topography and the full load path. Guide Roof uplift and cladding Roof uplift on Caribbean structural steel buildings in hurricanes: corner and edge suction zones, purlin and sheet fastening, girts, doors, internal pressure and anchor… Guide Salt air: C5 and CX Caribbean salt air measured the ISO 12944 way: corrosivity categories C3 to CX by distance from the sea, steel loss per year, durability classes and C5 or CX paint… Guide Galvanizing and duplex Hot-dip galvanized and duplex (galvanized plus paint) steel for Caribbean coasts: ISO 1461 and ASTM A123 zinc thickness, zinc loss in C5 and CX, venting and sweep… Guide Coastal detailing Steel details that keep salt water out: no water traps or crevices, rounded edges, sealed welds, isolated mixed metals and raised column bases, designed to ISO 12944-3. Guide Earthquakes and hurricanes Steel structures for Caribbean islands with both hurricane and earthquake hazards: which load governs, braced and moment frames, AISC 341 and AWS D1.8 detailing. Guide Rebuild programs Steel for Caribbean rebuild programs after hurricanes: shelters, schools, clinics, warehouses and utilities from one design family, fabricated at 2,500 t a month and… Guide Maintenance and storm checks Keeping Caribbean steel sound: yearly coating inspection, a walk-down after every named storm, ISO 4628 rust grades, fresh-water rinsing and touch-up with the same… Guide

Seismic steel structures · 9

AISC 341 systems, demand-critical welds, protected zones and seismic QA, from design category to inspection.

Seismic steel structures overview

Florida steel solutions · 8

Hurricane wind, wind-borne debris, salt air and flood zones under the Florida Building Code.

All Florida solutions

California steel solutions · 7

Seismic design, plan check, Title 24 energy and wildfire rules for California steel buildings.

All California solutions

Texas structural steel solutions · 8

Petrochemical structures, Gulf Coast windstorm, hail, clay soils, heat, city codes and the Texas ports.

All Texas solutions

Washington structural steel solutions · 8

Cascadia seismic, codes and energy, snow, marine air, data centers, aerospace, cold storage and the Washington ports.

All Washington solutions

Arizona structural steel solutions · 8

Desert heat, monsoon wind and dust, caliche and fissures, local codes, semiconductor plants, data centers, EV plants and the overland haul.

All Arizona solutions

Georgia structural steel solutions · 8

The Port of Savannah, EV and battery plants, Atlanta data centers, the state minimum codes, coastal wind, humidity, food plants and studios.

All Georgia solutions

North Carolina structural steel solutions · 8

The NC State Building Code, the hurricane coast, life sciences plants, EV and battery plants, data centers, aerospace, food and the ports.

All North Carolina solutions

Tennessee structural steel solutions · 8

New Madrid seismic, the state code, EV and battery plants, auto manufacturing, Memphis logistics, data centers, storms and the rail and river routes.

All Tennessee solutions

Ohio structural steel solutions · 8

The Ohio Building Code, lake-effect snow, chip and advanced manufacturing, data centers, EV and battery plants, heavy industry, freeze-thaw and the inland routes.

All Ohio solutions

South Carolina structural steel solutions · 8

Charleston seismic, the hurricane coast, the state codes, Upstate auto plants, EV and battery plants, the Port of Charleston, aerospace and distribution.

All South Carolina solutions

Louisiana structural steel solutions · 8

Hurricane wind, the state uniform code, petrochemical plants, LNG export terminals, soft soils, humidity and corrosion, river ports and new data centers.

All Louisiana solutions

Virginia structural steel solutions · 8

Data Center Alley, the Uniform Statewide Building Code, Hampton Roads wind, the Port of Virginia, plants, seismic checks, mountain snow and distribution.

All Virginia solutions

Illinois structural steel solutions · 8

Local codes and the Chicago Building Code, the rail hub, snow and wind, data centers, Will County logistics, food and cold storage, manufacturing and seismic in the south.

All Illinois solutions

Pennsylvania structural steel solutions · 8

The Uniform Construction Code, karst and sinkholes, Lehigh Valley warehouses, snow and frost, data centers, life sciences, western manufacturing and energy, and the ports.

All Pennsylvania solutions

Michigan structural steel solutions · 8

The Michigan Building Code, lake-effect snow, auto supplier plants, battery and EV plants, data centers, warehouses, food and cold storage, and rail delivery through Chicago.

All Michigan solutions

Indiana structural steel solutions · 8

The Indiana Building Code and the state design release, snow, wind and seismic, RV plants, battery and auto plants, steel mills, data centers, warehouses and life sciences.

All Indiana solutions

Missouri structural steel solutions · 8

Local codes, New Madrid seismic, tornado and ice storms, the Kansas City rail hub, auto plants, St. Louis aerospace, data centers and food and farm buildings.

All Missouri solutions

Kentucky structural steel solutions · 8

The Kentucky Building Code and state plan review, seismic, tornado and ice, bourbon rickhouses, auto and battery plants, air cargo logistics, heavy industry and equine buildings.

All Kentucky solutions

Alabama structural steel solutions · 8

Local codes, Gulf hurricane wind, tornado storms, auto plants, aerospace in Huntsville and Mobile, steel and heavy industry, the Port of Mobile and data centers.

All Alabama solutions

New York structural steel solutions · 8

The Uniform Code and NYC codes, lake-effect snow, Long Island coastal wind, multi-story steel, chip-industry plants, food and dairy, the Port of New York and New Jersey and data centers.

All New York solutions

Colorado structural steel solutions · 8

Local codes, snow by elevation, Front Range wind and hail, aerospace, energy manufacturing, food and beverage, Denver rail logistics and data centers.

All Colorado solutions

Oklahoma structural steel solutions · 8

The statewide code, tornado, hail and ice, seismic design, aircraft maintenance, oil and gas, manufacturing plants, I-35 and I-40 logistics and agriculture and food.

All Oklahoma solutions

New Jersey structural steel solutions · 8

The Uniform Construction Code, Shore wind and flood, snow and drift on big roofs, Turnpike warehouses, Port Newark logistics, pharma, cold storage and data centers.

All New Jersey solutions

Wisconsin structural steel solutions · 8

The commercial building code and plan review, snow and frost, dairy and cheese plants, paper mills and foundries, machinery plants, data centers, I-94 logistics and farm buildings.

All Wisconsin solutions

Minnesota structural steel solutions · 8

The State Building Code, snow and frost, food and agribusiness plants, cold storage, medical device plants, the Iron Range, data centers and rail logistics.

All Minnesota solutions

Massachusetts structural steel solutions · 8

780 CMR and the energy code, snow and coastal wind, life sciences labs, advanced manufacturing, I-495 warehouses, port logistics, data centers and seafood cold storage.

All Massachusetts solutions

Maryland structural steel solutions · 8

The Maryland Building Performance Standards, Bay wind, flood and mountain snow, the Port of Baltimore, data centers, I-270 life sciences, I-95 warehouses, poultry and port industry.

All Maryland solutions

Oregon structural steel solutions · 8

The Structural Specialty Code, Cascadia seismic design, snow and coastal wind, Silicon Forest chip plants, data centers, food processing, wood products mills and the Port of Portland.

All Oregon solutions

Nevada structural steel solutions · 8

County building codes, northern Nevada seismic design, desert heat and wind, Reno industrial parks, data centers, Las Vegas warehouses, mining plants and the routes from the California ports.

All Nevada solutions

Utah structural steel solutions · 8

The State Construction Code, Wasatch Fault seismic design, mountain snow loads, data centers, aerospace and advanced plants, Salt Lake distribution, mining and refining, and the routes from the ports.

All Utah solutions

Iowa structural steel solutions · 8

Iowa building codes, derecho and tornado wind, snow and deep frost, data centers, pork, egg and ethanol plants, machinery plants, Des Moines distribution and the rail routes from the ports.

All Iowa solutions

Kansas structural steel solutions · 8

Local codes adopted city by city, open-plains wind and hail, Wichita aviation, Kansas City logistics, beef plants in the southwest, battery and advanced plants, grain and feed, and steel by rail through Kansas City.

All Kansas solutions

Arkansas structural steel solutions · 8

The Arkansas Fire Prevention Code, the New Madrid seismic corner, tornadoes and ice storms, Northwest Arkansas logistics, poultry plants, steel mills on the Mississippi, Delta farms and steel by river and rail.

All Arkansas solutions

Mississippi structural steel solutions · 8

Coastal county code rules, Gulf hurricane wind, auto and advanced plants, shipyards and salt air, data centers, poultry plants, DeSoto County distribution and steel through Mobile and New Orleans.

All Mississippi solutions

Nebraska structural steel solutions · 8

The Nebraska State Building Code, blizzard snow and drift, plains wind, Omaha data centers, meat and food plants, ethanol and ag energy, feedyards and farm buildings, and steel by rail to Omaha.

All Nebraska solutions

New Mexico structural steel solutions · 8

The New Mexico Commercial Building Code, Rio Grande rift seismic, altitude snow, the Permian oil field, sound stages and long spans, dairy and food plants, labs and advanced plants, and steel by rail and truck.

All New Mexico solutions

Idaho structural steel solutions · 8

The Idaho building code, fault zones and seismic design, mountain snow, potato storage and processing, dairy and cold storage, Treasure Valley warehouses, chip and advanced plants, and steel through the Pacific Northwest ports.

All Idaho solutions

West Virginia structural steel solutions · 8

The West Virginia State Building Code, mountain snow and valley floods, steep sites and narrow pads, chemical and energy plants, Ohio Valley manufacturing, Eastern Panhandle distribution, mine structures and steel through Baltimore and Norfolk.

All West Virginia solutions

Connecticut structural steel solutions · 8

The Connecticut State Building Code, shoreline hurricane wind, hill-town snow, aerospace and defense plants, mill additions and tight sites, New Haven life sciences, I-84 and I-91 distribution and steel through New York–New Jersey.

All Connecticut solutions

Hawaii structural steel solutions · 8

County-adopted building codes, hurricane wind on every island, Big Island seismic, salt air and corrosion, harbor warehouses, hotels and multi-story buildings, energy and utility plants, and direct ocean freight to Honolulu.

All Hawaii solutions

Alaska structural steel solutions · 8

Local and state code review, great-earthquake seismic, heavy snow and deep cold, remote sites and short seasons, oil and gas, mines, seafood plants and steel by sea through Tacoma to Anchorage.

All Alaska solutions

Montana structural steel solutions · 8

The Montana building code, western seismic belts, mountain snow and chinook wind, Bakken and refinery energy, copper and metal mines, wheat and cattle buildings, long distances to remote sites and steel by rail from Seattle and Tacoma.

All Montana solutions

Wyoming structural steel solutions · 8

Fire and life safety code coverage, wind and drifting snow, Teton and Yellowstone seismic, oil and gas, coal and trona mines, Cheyenne data centers, ranch buildings and steel by rail along I-80.

All Wyoming solutions

North Dakota structural steel solutions · 8

The North Dakota State Building Code, blizzards and deep cold, the Bakken oil field, heated shops for rigs and combines, grain and farm buildings, data centers, Red River Valley food plants and steel by rail from the Pacific Northwest.

All North Dakota solutions

South Dakota structural steel solutions · 8

Local building codes, prairie wind and exposure, blizzard drift and frost, Sioux Falls distribution, meat, dairy and cheese plants, ethanol and ag processing, farm and ranch buildings and steel by rail from the Pacific Northwest.

All South Dakota solutions

Maine structural steel solutions · 8

The Maine Uniform Building and Energy Code, heavy inland snow, salt air on the coast, shipyards and marine industry, paper and forest products mills, seafood and potato plants, southern Maine warehouses and steel through Portland, Boston or New York.

All Maine solutions

New Hampshire structural steel solutions · 8

The New Hampshire State Building Code, mountain snow, moderate seismic that is still checked, advanced manufacturing, southern New Hampshire distribution, Millyard life sciences, hospitals, campuses and resorts, and steel through New York or Boston.

All New Hampshire solutions

Vermont structural steel solutions · 8

The Vermont Fire and Building Safety Code and Act 250, Green Mountain snow, semiconductor and precision plants, dairy and specialty food plants, ski resort lodges, hospitals and campuses, cold storage and steel through New York or Boston.

All Vermont solutions

Rhode Island structural steel solutions · 8

The Rhode Island State Building Code, hurricane wind on Narragansett Bay, offshore wind ports at Quonset and ProvPort, defense and marine plants, Providence life sciences and hospitals, I-95 distribution, salt air corrosion and steel through New York or Providence.

All Rhode Island solutions

Delaware structural steel solutions · 8

County and city building codes with the State Fire Prevention Regulations, coastal wind and nor’easters, Delmarva poultry and food plants, chemistry and life sciences in Wilmington and Newark, I-95 distribution, Port of Wilmington cold storage, refinery and energy plants and steel through Baltimore or New York.

All Delaware solutions

Washington, DC structural steel solutions · 8

The DC Construction Codes and Department of Buildings review, deliveries to tight city sites, mid-rise frames under the Height Act, hospitals, universities and labs, stadiums and long-span venues, seismic checks after 2011, rooftop snow drift and steel through Baltimore.

All Washington, DC solutions

Steel buildings by state · 51

One guide for every state and DC: the code it adopts, its design loads and the port that serves it.

All state guides

Shipping from Vietnam · 7

How your steel is packed, shipped and imported, and the rules that apply at the US border.

Logistics hub

Incoterms® 2020 · 11

Every trade term explained for a steel building shipped from Vietnam: who pays, who insures and where risk passes.

All Incoterms explained
EXW · Ex Works EXW (Ex Works) for a steel building from World Steel’s plant in Vietnam: who loads, who clears export, where risk passes and why FCA is often the better choice. Trade term FCA · Free Carrier FCA (Free Carrier) for a steel building made in Vietnam: World Steel loads and clears export, your carrier takes over. Who pays, where risk passes, who imports. Trade term CPT · Carriage Paid To CPT (Carriage Paid To) for steel from World Steel’s plant in Vietnam: we pay carriage to the US place you name, risk passes at the first carrier. Duties and import… Trade term CIP · Carriage and Insurance Paid To CIP for steel made by World Steel in Vietnam: carriage to the US place you name plus all-risks cargo cover, risk at the first carrier. Who imports and pays duties. Trade term DAP · Delivered at Place DAP (Delivered at Place) for a steel building from Vietnam: World Steel carries it to your US site and bears the risk to arrival; you clear customs and unload. Trade term DPU · Delivered at Place Unloaded DPU (Delivered at Place Unloaded) for steel from World Steel in Vietnam: carried to the named US place and unloaded there. You clear customs and pay duties. Trade term DDP · Delivered Duty Paid DDP for a steel building from Vietnam: World Steel’s side imports, pays US duties including Section 232 and delivers to site. You are not importer of record. Case by… Trade term FAS · Free Alongside Ship FAS (Free Alongside Ship) for breakbulk structural steel from Vietnam: World Steel delivers alongside the vessel, you load and ship. Costs, risk and US import explained. Trade term FOB · Free On Board FOB Cat Lai or Cai Mep for a steel building from World Steel’s plant in Vietnam: what we cover, what your forwarder covers, where risk passes and who imports. Trade term CFR · Cost and Freight CFR (Cost and Freight) to a US port for steel made in World Steel’s plant in Vietnam: we pay the ocean freight, risk still passes on board in Vietnam. All explained. Trade term CIF · Cost, Insurance and Freight CIF to a US port for a steel building from World Steel in Vietnam: freight and minimum cargo cover included, risk passes on board in Vietnam. Who imports, who pays… Trade term

US seaports · 16

The West, Gulf and East Coast ports we ship to, with the inland rail and road routes beyond them.

All US ports we ship to

How a project runs · 6

From your RFQ to the last container: design, approvals, quality control and live tracking in PEB Studio.

How we work overview

Online planning tools · 3

Free tools to scope a building before you talk to us.

Code stack

Six questions every US steel building answers, and where to read each one

From the code your county adopts down to the records that arrive with the steel. Our buildings are designed to these standards; your Engineer of Record and building official decide what applies to your project.

  1. Adopted building code

    Who has authority?

    Your state, county or city adopts a model code and amends it. That code, not a catalog, sets the rules for your permit.

  2. Design loads

    What forces must it resist?

    The adopted IBC sends every load to ASCE 7: dead, live, snow, rain, wind, earthquake and, from the 2022 edition, tornado for some buildings.

  3. Steel design specifications

    How is each member sized?

    Hot-rolled and welded plate members are checked to AISC 360, seismic systems to AISC 341, purlins and girts to AISI S100. Metal building practice and AISC design guides fill in the details.

  4. Fabrication standards

    How is it made and joined?

    Welds follow AWS D1.1 for structural steel and AWS D1.3 for sheet steel, with the AWS D1.8 seismic supplement added for welds in an AISC 341 seismic system. Bolted joints follow RCSC, and every grade is an ASTM grade backed by a mill certificate.

  5. Inspection, approval and seal

    Who checks and signs?

    IBC Chapter 17 decides what gets special inspection. IAS AC472 accreditation lets your building official recognize our plant, and your Engineer of Record approves the drawings.

  6. Import, delivery and records

    How does it reach your site?

    Steel made in Vietnam enters the US under the import rules in force, ships in erection order and arrives with its records. You follow every member live in PEB Studio.

States & ports

A guide for your state, and the US port your steel lands at

Each state guide covers the code it adopts, its wind, snow and seismic loads and the port that serves it. Each port guide covers the sailing from Vietnam and the rail and road routes inland.

All US ports we ship to
Florida solutionsHurricane wind, debris, salt air, flood California solutionsSeismic, plan check, Title 24, wildfire Texas solutionsPetrochemical, windstorm, hail, clay soils Washington solutionsCascadia seismic, snow, energy code, ports Arizona solutionsHeat, monsoon wind, fabs, data centers Georgia solutionsSavannah, EV plants, data centers, coast North Carolina solutionsHurricane coast, life sciences, EV, data Tennessee solutionsEV plants, Memphis freight, New Madrid Ohio solutionsChip and battery plants, data centers, snowbelt South Carolina solutionsAuto, aerospace, Charleston seismic and wind Louisiana solutionsPetrochemical, LNG, hurricanes and soft soils Virginia solutionsData centers, the port and one statewide code Illinois solutionsThe rail hub, local codes and Midwest winters Pennsylvania solutionsWarehouse corridors, karst ground and the UCC Michigan solutionsAuto and battery plants under lake-effect snow Indiana solutionsThe crossroads, the design release and the plants Missouri solutionsThe Show-Me State, the fault line and the rail hub Kentucky solutionsRickhouses, assembly plants and air cargo hubs Alabama solutionsRocket City, the auto belt and Mobile Bay New York solutionsThe harbor, the Thruway and the Great Lakes Colorado solutionsThe Front Range, the plains and the high country Oklahoma solutionsRoute 66, Tornado Alley and the energy belt New Jersey solutionsThe Turnpike, the port and the Shore Wisconsin solutionsAmerica’s Dairyland, paper country and the machine shops Minnesota solutionsTen thousand lakes, deep frost and the food industry Massachusetts solutionsLabs, robots and a statewide code on the Bay Maryland solutionsA port state on the Chesapeake Oregon solutionsCascadia, chips and the Columbia Nevada solutionsReno industry, Las Vegas logistics Utah solutionsThe Wasatch Front, data and aerospace Iowa solutionsData campuses, food plants and machinery Kansas solutionsAir Capital and open plains Arkansas solutionsOzark ridges and the Delta Mississippi solutionsThe Gulf Coast to the Delta Nebraska solutionsRails across the prairie New Mexico solutionsHigh desert and the Rio Grande Idaho solutionsThe Gem State, valley to mountain West Virginia solutionsMountain valleys and river towns Connecticut solutionsShoreline to the northwest hills Hawaii solutionsIsland steel by direct ocean freight Alaska solutionsShort seasons and the heaviest loads Montana solutionsBig Sky, copper and open range Wyoming solutionsWind that never stops North Dakota solutionsHeated shops for the coldest winters South Dakota solutionsOpen prairie and Badlands wind Maine solutionsSnow on the roof, salt on the walls New Hampshire solutionsThe Granite State, valley to notch Vermont solutionsThe Green Mountain State, Champlain to the Connecticut Rhode Island solutionsThe Ocean State, Providence to Point Judith Delaware solutionsThe First State, Wilmington to the Delmarva shore Washington, DC solutionsThe District, Capitol Hill to the Anacostia Seismic steel structuresAISC 341, AWS D1.8, protected zones

From the plant

Where the guides turn into steel

Cutting, welding, inspection, coating and packing in World Steel’s plant in Vietnam. Tap a photo to enlarge it.

Long shop floor of built-up members, overhead cranes and a center walkway Photo
Two welders operating a submerged-arc welding station on a member Photo
Quality inspector taking dimensions on a finished steel member Photo
Coated members drying in rows on stands in the paint hall Photo
Painted members strapped into bundles and stacked for the voyage Photo
Tall columns and rafters inside a clear-span building with roof sheeting on Photo

Questions

About this library, and who does what on your job

Using this library 3 answers

Who are these guides written for?

US general contractors, erectors, metal building dealers, Engineers of Record, owners and the import and logistics teams who buy steel from World Steel. Each guide explains a US code, a site condition or a step of the job, and how our plant in Vietnam handles it.

Are the guides free to read and share?

Yes. Every guide on USPEB.com is free to read, link to and share with your project team. Nothing sits behind a sign-up form.

Can a guide replace my own engineer’s judgment?

No. The guides explain how we design and fabricate to US codes. The adopted code, your Engineer of Record and your building official decide what applies to your project.

Who does what 3 answers

What does World Steel supply?

World Steel designs, fabricates and supplies the steel structure, made in our own plant in Vietnam and shipped to a US port. Shop drawings are included on every project at no extra cost.

Who erects the building and runs the site?

The US contractor, our customer. Erection, foundations, site work and the trades on site are the contractor’s scope, unless the contract says otherwise.

Who approves the drawings and seals them for the permit?

Your Engineer of Record. We send calculations and drawings ready for their review and approval; the US contractor and the Engineer of Record handle the seal and the permit.

Standards & records 3 answers

Which code editions are your buildings designed to?

By default IBC 2024, ASCE 7-22 and AISC 360-22. When your jurisdiction has adopted an earlier or amended edition, we design to the edition it has adopted, and the adopted code always governs.

Is World Steel certified to AISC 341 or AWS D1.8?

Our buildings are designed to AISC 341 and welded to AWS D1.8 where a seismic system calls for it, using qualified welding procedures and welders. The credential we hold is IAS AC472 accreditation, the first and only one for a fabricator in Vietnam.

What records come with the steel?

Heat-numbered mill certificates, inspection and weld records, coating checks and packing lists, kept against each member in PEB Studio, so your special inspector and Engineer of Record can check them before and after shipping.

From reading to a quote 3 answers

What do I send to get a quotation?

A footprint, a site address and the building use are enough to start. Drawings, a geotechnical report or your engineer’s design criteria make the quotation sharper.

Can I follow my order once it is in production?

Yes. Every buyer gets a PEB Studio login to follow their own members through the plant in real time, with inspection records, packing lists and shipping documents.

I can’t find the guide I need. What now?

Search the library above or open the full sitemap. If the topic is not covered yet, ask our team: an engineer will answer, and the best questions become new guides.

Read enough? Send us your building.

A footprint, a site address and the building use are enough to start. An engineer checks it against the US codes your site needs and sends back exactly what World Steel would supply.