Four members, one rhythm
Choose a profile to see its job
Z purlin
The workhorse of the roof. Z sections nest over each other at the frames, so a lapped line acts as a continuous beam and uses less steel.
- Lapped over the frames for continuity
- Bolted to clips shop-welded on the rafters
- Gauge and depth set by span and wind zone
C girt
C sections frame the walls and the edges of openings, where a straight back and square ends make neat jambs and headers.
- Wall girts and door jambs
- Square ends for clean trims
- Simple-span or lapped, per design
Eave strut
Sits where the roof meets the wall and carries the last row of roof and wall sheets on one member.
- Ties roof plane to wall plane
- Carries gutter and trim lines
- Sized for the end-zone pressure
Bracing
Rod, cable, angle or portal bracing in the roof and wall planes takes longitudinal wind and seismic forces to the foundation.
- Rod or cable X-bracing
- Portal frames where a bay must stay open
- Flange braces to steady the frame
Spacing follows the wind
Closer where the suction is highest
ASCE 7-22 gives roof corners and edges higher components-and-cladding pressure than the middle. We tighten the purlin line there instead of making the whole roof heavy.
Standard spacing where wind pressure is lowest.
Higher pressure near the eaves and gables, so purlins move closer or go up a gauge.
The highest suction on the roof gets the tightest spacing and the heaviest members.
Illustration. The panel’s tested span and your site’s wind pressure set the real spacing.
Less steel, same strength
Lapped Z purlins work as one long beam
Where Z purlins nest over each frame, the line acts as a continuous beam. Moments drop in each span and the purlins can be lighter than simple-span members.
How we engineer it for US codes
- How it ties into the main frames
- Purlins and girts bolt to clips that are shop-welded to the frames. Flange braces running from those members hold the inner flange of the frame in place, which is critical when wind uplift turns compression into tension and back.
- What sets the spacing
- Spacing is driven by the panel’s tested span for the design pressure. Roof corners, edges and wall ends see higher components-and-cladding pressures and get tighter spacing or heavier gauges.
- Continuity
- Lapping Z purlins over the frames lets them behave as continuous beams, cutting steel weight. Cold-formed members are designed to AISI S100.
- Bracing
- Rod, cable, angle or portal bracing in the roof and wall planes delivers longitudinal wind and seismic forces to the foundation.
Photo
Photo
Photo
Large-project capacity
Every frame’s purlins, at 2,500 t a month
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
In the catalog
Secondary framing in the catalog
Photo
Z Purlins
Roll-formed Z members that span between roof frames and overlap at the supports, so each run works as one continuous beam. Made by World Steel in Vietnam Verified
Photo
C Purlins
Roll-formed C channels used as purlins, girts and the jambs and headers around wall openings. Made by World Steel in Vietnam Verified
Photo
Wall Girts
Horizontal Z or C members fixed across the columns to carry the wall panels and their wind load back to the frames. Made by World Steel in Vietnam VerifiedEave Struts
The cold-formed member that runs along the top of each sidewall, catching the edge of the roof panels and the top of the wall panels. Made by World Steel in Vietnam VerifiedSag Rods
Small steel rods that tie purlins or girts together mid-span, keeping them straight and stopping them from rolling under load. Made by World Steel in Vietnam Verified
Photo
Roof Bracing
Diagonal rods, angles or portal frames in the roof plane that pass lengthwise wind and seismic forces to the braced bays. Made by World Steel in Vietnam Verified
Photo
Wall Bracing
Rods, angles or portal frames in the sidewalls and endwalls that take lengthwise forces from the roof down to the foundation. Made by World Steel in Vietnam VerifiedSecondary Connection Components
Purlin and girt clips, flange braces and small connection parts that tie secondary members to the main frames. Made by World Steel in Vietnam VerifiedFraming Accessories
Miscellaneous framing bits a metal building needs on site: spacers, base angles, angle clips and similar small parts. Made by World Steel in Vietnam VerifiedWhere it meets the other systems
Each purlin and girt bolts to a clip that was welded onto the rafter or column in our shop, and flange braces run from those members to the inside flange of the frame.
Design limit: The frame analysis assumes braces at set points, so clip and brace locations on the drawings must match it exactly. · What gets checked: Confirm every bolt is in and snug and that no flange brace has been left off.
Roof sheets are screwed through, or held by concealed clips, to the purlins below.
Design limit: Purlins can be no farther apart than the panel’s tested span allows at the ASCE 7 roof pressure, which tightens at corners, edges and ridges. · What gets checked: Screw type, spacing and sealing are compared with the approved roof drawings.
Wall sheets screw to the girts and finish at a base trim along the edge of the slab.
Design limit: The panel’s tested capacity sets the maximum girt spacing, and the wall end zones usually decide it. · What gets checked: Check the screw pattern and that side laps are sealed.
Purlins and girts arrive galvanized from the coil or with a shop paint finish.
Design limit: Zinc coating weight is picked for the exposure, and edges cut after coating get touch-up. · What gets checked: Coil mill certificate showing the coating designation.
Scope, in writing
What we supply and what stays with your team
World Steel, our plant in Vietnam
- Purlin, girt and bracing design checked with the frame, panel and wind zone together
- Roll-formed Z and C members, eave struts, clips, sag rods and flange braces as the design needs
- Shop drawings with member marks and bolt lists, included at no extra cost
- Bundles tagged by area and packed with the frames, for your US port
The US contractor, our customer
- Drawing approval, the PE seal and the permit with your Engineer of Record
- Erection, bolting and plumbing the bracing at site
- Temporary bracing during erection under your erection plan
Questions from US contractors
Secondary framing questions and answers
6 answers, grouped by topic.
Design 3 answers
What decides purlin and girt spacing?
The tested span of the roof or wall panel at the design wind pressure. Corners, edges and wall ends see higher pressure, so they get tighter spacing or a heavier gauge than the middle of the roof.
Which standard are the cold-formed members designed to?
Purlins, girts and eave struts are designed to AISI S100 for cold-formed steel, with loads from ASCE 7-22 as named by your Engineer of Record.
Why lap Z purlins over the frames?
Lapped Z purlins act as a continuous beam across several frames, which lowers the moment in each span and cuts steel weight compared with simple spans.
Supply 2 answers
Do flange braces and sag rods come with the package?
Yes, when the engineered design calls for them. They are listed on the shop drawings and packed with the members they belong to.
Is secondary framing shipped with the main frame?
Yes. Members are bundled by area and packed in the erection order you give us, so a bay’s frames and purlins can arrive together.
Large projects 1 answer
Can you supply secondary framing for a very large footprint?
Yes. Secondary members come from the same plant that fabricates 2,500 t of structural steel a month, and they are produced alongside the frames so both arrive in the same sequence.
Keep reading
Related pages
Covered in our state guides
Price it or partner with us
Send the panel and the wind speed.
We set purlin and girt spacing with the frame and the panel together, then draw every member for your erector.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Have this system engineered for your site
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833