Tennessee · Ports, rail and river
Getting structural steel to Tennessee: ports, rail and river
Tennessee has no seaport, but it sits at the end of some of the best freight routes in the country. Containers come through Savannah or Charleston and continue by truck or rail, or land on the West Coast and ride the railroads to Memphis. Oversize members can travel by barge on the Mississippi, Tennessee and Cumberland rivers.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and delivered to your Tennessee site through the East Coast or West Coast ports.
- East Coast gateways
- Savannah and Charleston
- West Coast route
- Rail to Memphis
- Inland
- Truck, rail and river barge
- Our part
- Lengths planned for the route
Gateways
The ports and routes for Tennessee steel
Port of Savannah
The usual gateway for Middle and East Tennessee, by truck on I-16 and I-75 or by rail.
Port page →Rail and truck to site
Containers continue by rail to Memphis or Nashville, or by truck to your site.
Planning
Packed for the last leg
Each route has its own limits on length, weight and handling. We plan member lengths and splice points with your engineer so pieces fit containers, rail cars or trucks, and we pack the bundles in the order your erector needs them.
Every bundle carries a tag tied to the packing list and the erection drawings, and you follow each container in PEB Studio from the plant to the port.
What we do not claim
We publish no transit times or freight rates. The route and the Incoterm are agreed per project.
Tennessee ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Tennessee contractors
Tennessee contractors: let’s win the next project together
If your next bid involves ports, rail and river, World Steel wants to be your long-term, win-win steel partner in Tennessee. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Tennessee project is cut, welded, inspected and packed.
Q&A
What Tennessee buyers ask
Which port is best for a Nashville project?
Usually Savannah, by truck or rail. We compare options for your address before we quote.
Can steel reach Memphis by rail from the West Coast?
Yes. Intermodal rail from the West Coast to Memphis is a common route.
Can long members travel by barge?
Where a site is near a river terminal, barge can suit oversize pieces. We check it per project.
Official sources: Tennessee Department of Transportation: freight
Tennessee solutions
Every Tennessee guide
Related pages
Code facts on this page summarize Tennessee practice, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.
Building in Tennessee?
Send the drawings or the site address, size and use. We set the Tennessee design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.