Frame types
Ten standard frame systems
Each shape is a starting point. Open a frame to see how it works, where it fits and what the design settles.
Clear-span gable frame
Two tapered columns and two rafters meeting at the ridge, with nothing in between: the whole floor stays open.
Warehouses, hangars, arenas, showrooms
Open this frame
Mono-slope frame
One roof plane falling from a tall wall to a low wall, with no interior columns: all rain goes to one side.
Lean-tos, canopies, narrow workshops
Open this frame
Gable frame on concrete columns
Steel gable rafters set on exterior concrete columns or walls: concrete below, a light steel roof above.
Halls with concrete walls, tilt-up or masonry buildings
Open this frame
Arched roof truss
Curved steel trusses spanning between exterior built-up steel columns, for long, light, signature roofs.
Large halls, food plants, sports venues
Open this frame
Multi-span frame, one interior column
A gable frame with one row of slim interior columns under the ridge, splitting the span into two shorter ones.
Wide warehouses, workshops, storage
Open this frame
Multi-span frame, two interior columns
A wide gable frame on two interior column lines: three bays under one roof, each with a shorter rafter.
Factories, logistics buildings, wide storage
Open this frame
Multi-span frame, many interior columns
A very wide, low-pitch frame carried on several interior column lines: the most economical way to roof a huge footprint.
Distribution centers, large plants
Open this frame
Multi-gable frame
Two or more gable roofs side by side, sharing columns at the valleys: shorter rafters and lower ridges over a wide plan.
Wide plants, phased buildings, low ridge heights
Open this frame
Arched roof, one interior column
Curved steel rafters over two spans that share one interior column line: an arched roof on a wide floor.
Showrooms, halls, warehouses with a curved roof
Open this frame
Multi-story steel buildings
Beams, columns and floors stacked into a two-way frame for offices, process towers and mixed-use buildings.
Offices, process towers, mixed use
Multi-story framing pageDiagrams redrawn and photos taken from the Technical specifications pages of the World Steel Group company profile.
Choose a frame
Start from what the building must do
Find the sentence that sounds like your project. Not sure? Send us the layout and we compare frame types in design optimization.
- Nothing may stand on the floorForklifts, aircraft, courts or seating need every square meter free.Clear-span gable frame
- Rain must run one way, or the building leans on anotherA lean-to, a canopy or a building that drains away from a neighbor.Mono-slope frame
- The walls are concreteConcrete columns or walls are built locally and the roof is steel.Gable frame on concrete columns
- The roof should be long, light and curvedA large hall with a signature arch and room under the roof.Arched roof truss
- A column line down the middle is acceptableTwo aisles that share one row of columns, for less steel.Multi-span frame, one interior column
- The building is wide, with three working zonesStorage on the sides, a main aisle in the middle.Multi-span frame, two interior columns
- The footprint is huge and racking sets the gridDistribution centers and factories laid out on a column grid.Multi-span frame, many interior columns
- Several smaller roofs suit the siteShorter rafters, lower ridges, and a building you can extend roof by roof.Multi-gable frame
- You want an arched roof and a wide floorA curved roofline over two spans that share one column line.Arched roof, one interior column
- You need floors, not just a roofOffices, process towers and mixed-use buildings.Multi-story steel buildings
Standard specifications
The starting values, and what changes for a US job
Standard wall peak height
3 m – 8 m
about 10 ft – 26 ft
The common range for a single-story frame. Taller walls are designed when your racking, cranes or doors need them.
Standard spacing between rigid frames
7.5 m – 9 m
about 25 ft – 30 ft
The bay length that usually gives the lightest balance of frames and purlins. Wider bays are compared in design.
Standard roof live load
0.3 kN/m²
about 6 psf
The profile’s starting value for its home markets. On a US job ASCE 7 sets the minimum, commonly 0.96 kN/m² (20 psf) for an ordinary roof, and snow, wind and seismic loads come from your site.
The figures above are a proposal from World Steel Group. Depending on your requirements, we design each building separately for its architectural form, width, height, bay spacing, design loads and other parameters.
Compare
All ten frames side by side
| Frame | Interior columns | Roof | Typical use |
|---|---|---|---|
| Clear-span gable frame | None | Two slopes | Warehouses, hangars, arenas |
| Mono-slope frame | None | One slope | Lean-tos, canopies, narrow workshops |
| Gable frame on concrete columns | None (concrete outer columns) | Two slopes | Halls with concrete walls, steel roof |
| Arched roof truss | None | Arched truss | Large halls, food plants, sports |
| Multi-span frame, one interior column | One line | Two slopes | Wide warehouses, workshops |
| Multi-span frame, two interior columns | Two lines | Two slopes | Factories, logistics buildings |
| Multi-span frame, many interior columns | Several lines | Two slopes, low pitch | Distribution centers, large plants |
| Multi-gable frame | At each valley | Several gables | Wide plants, phased buildings |
| Arched roof, one interior column | One line | Curved | Showrooms, halls, warehouses |
| Multi-story steel buildings | On the grid | Flat or pitched | Offices, towers, mixed use |
How we deliver
Whatever the frame, the same way of working
World Steel designs, fabricates and ships. The US contractor, our customer, erects, and your Engineer of Record reviews, approves and seals.
Designed for your site
Our engineers size the frame to your building code and ASCE 7 loads: wind, snow, seismic, cranes and collateral loads. The design follows AISC 360 and MBMA practice for metal buildings.
Steel only where it works
Columns and rafters are welded from plate and tapered to the bending, so tonnage follows the load. Bay spacing and frame type are compared in design optimization.
Made in our own plant
Automated submerged arc web-to-flange welding, CNC cutting and drilling, shot blasting and coating in our IAS AC472-accredited plant in Vietnam.
Drawings your engineer can approve
Calculations and approval drawings go to your Engineer of Record. Shop drawings are included on every project at no extra cost.
Tracked in PEB Studio
Follow fabrication, inspection, packing and shipping of every frame in real time.
Shipped to your US port
Members bundled by erection sequence and labeled by piece mark, ready for the US contractor, our customer, to erect.
Company profile
The frames come from our company profile
Download the World Steel Group company profile (English, 56 pages, PDF): our plant and its machines, certificates, standard frame systems, sheeting and accessories, material grades, the fabrication and inspection flow and typical projects.
Related
Members, systems and buildings around the frame
Built-up steel sections
The tapered, box and curved members the frames are welded from.
Complete building systems
Secondary framing, roof, walls, doors and accessories around the frame.
Multi-story steel framing
Beams, columns and floors for buildings with more than one level.
Building packages
Eighteen building types, from warehouses to hangars, with a frame chosen for each.
Questions
Steel frame system questions
What is the difference between a clear-span and a multi-span steel frame?
A clear-span frame carries the roof from one outside wall to the other with no interior columns. A multi-span frame adds one or more interior column lines, which shortens each rafter and usually saves steel on wide buildings. The right choice depends on how you use the floor.
Which frame type uses the least steel?
For the same footprint, frames with interior columns are usually lighter than a clear span, because each rafter spans less. Whether that saving is worth the columns on your floor is a design decision we compare for your building.
Are these frame types fixed sizes?
No. The ten types are starting shapes. World Steel designs each building separately for its width, height, bay spacing, roof pitch and design loads.
Why does the profile list a roof live load of 0.3 kN/m²?
That is the profile’s standard value for its home markets. For a US building the minimum roof live load, snow, wind and seismic loads come from ASCE 7 and your local building code, and we design to those.
Can you combine frame types in one building?
Yes. A clear-span main hall with a mono-slope lean-to, or a multi-span warehouse with a multi-story office at one end, is common. We design the junctions with the rest of the frame.
Do you erect the frames?
No. World Steel designs, fabricates and ships the steel. The US contractor, our customer, erects it, and your Engineer of Record reviews, approves and seals the design.
How do I get a price for a frame?
Send a site address, the building size and use, and any drawings you have. We return a proposal with the frame type, a scope of supply and a price for the fabricated steel delivered to your US port.
Built for large jobs
Steel frame systems for your next large package
Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.
Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.
Shop drawings, included