Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Hawaii · Multi-story

Structural steel for Hawaii hotels and multi-story buildings

Honolulu, Waikiki and the resort coasts of Maui build hotels, housing, medical and public buildings several stories high on tight sites. Steel frames with composite floors carry hurricane wind and seismic loads and go up quickly. We fabricate and deliver that steel floor by floor.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped by ocean freight to Honolulu for your Hawaii site.

Columns and floor beams of a multi-story steel frame partway through erection
Going up beside the plant in Vietnam: World Steel framed its own office building.
Hubs
Honolulu, Waikiki, Maui
Floors
Composite on deck
Lateral
Wind and seismic frames
Release
Floor by floor

Why it matters

Tight sites, tall frames

A hotel in Waikiki or a medical building in Honolulu sits on a small site with neighbors on every side, so steel has to arrive in the order it is erected. Salt air also reaches the frame during construction.

We fabricate columns, beams, bracing and deck, coat the steel for the exposure and ship it floor by floor in erection order.

What we design and fabricate

Steel for multi-story buildings

Frames and floors

Columns, beams and composite floors on metal deck.

Lateral systems

Braced or moment frames for wind and seismic loads.

Stairs and cores

Steel stairs and core framing.

Fire protection

Steel ready for the fire-resistance design.

Who does what

Multi-story steel, split clearly

World Steel supplies

  • Columns, beams, bracing and deck
  • Floor-by-floor releases packed in erection order
  • Coating ready for fire protection
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Architecture and the Engineer of Record’s design
  • Engineer of Record approval and PE seal
  • Fire protection and inspections
  • Concrete topping and MEP
  • Erection and site work

Hawaii

What we do not claim

World Steel names no Hawaii developer as a customer and claims no completed Hawaii building. Fire protection and inspections are your team’s scope.

Hawaii ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Hawaii contractors

Hawaii contractors: let’s win the next project together

If your next bid involves hotels and multi-story, World Steel wants to be your long-term, win-win steel partner in Hawaii. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Hawaii project is cut, welded, inspected and packed.

Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Fabricated members lined up along a railed walkway
Fabricated members lined up in a World Steel shop, Vietnam.
Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Crew loading steel parts onto the shot-blasting conveyor
Parts going into the blaster ahead of primer, World Steel, Vietnam.

Q&A

What Hawaii buyers ask

Can you deliver floor by floor?

Yes. We pack and ship the steel floor by floor.

Do you supply metal deck?

Yes. Metal decking is part of the package.

Do you supply fireproofing?

No. Fire protection is your team’s scope; the steel is coated ready for it.

Official sources: Hawaii Tourism Authority

Hawaii solutions

Every Hawaii guide

Related pages

Code facts on this page summarize Hawaii practice, the Hawaii State Building Code as your county adopts it, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Hawaii?

Send the drawings or the site address, size and use. We set the Hawaii design basis with your Engineer of Record, design or detail the steel to your county’s code, hurricane wind and island seismic, coat it for salt air, and quote it made in our plant in Vietnam, packed in erection order and shipped by ocean freight to Honolulu.