Airport and transport
Wesley and Woodford Hill, Melville Hall, Canefield
Terminal, hangar and cargo frames, airport services and transport buildings.
Going up beside the plant in Vietnam: World Steel framed its own office building.
Dominica guides
Approvals, hurricanes after Maria, volcanic ground and earthquakes, rain and salt air, Woodbridge Bay and the mountain roads, and the airport and resilience work that drives the market, one guide each.
National symbols of Dominica
Green for the rainforest, a cross of yellow, black and white for the soil, the Kalinago and African heritage and the rivers, a red disc for justice, the Sisserou parrot and ten stars for the parishes. Four national symbols, and what each one means for the steel we make for Dominican buildings.
Found only in the high forests of Morne Diablotins, the Sisserou sits at the centre of the flag. Built for one place, like every frame we design for its site.
Ten green stars ring the red disc, one for each parish. One standard of care, from Roseau to the Kalinago Territory.
The national flower blooms bright red on the dry west coast every year. Colour that holds its own in sun and salt, like the finish on our coated steel.
The world’s second-largest hot lake steams in the hills above Roseau, the same heat that drives the geothermal plant. We design for an island that is still alive underground.
Ten parishes, ten stars
Dominica has ten parishes, one for each green star on the flag: from St George with Roseau and the port, down the west coast to St John and Portsmouth, and over the mountains to St Andrew, the Kalinago Territory in St David and St Patrick in the south-east. Each page covers the main town, the ground, the hurricane and earthquake conditions, the route from Roseau and the steel we recommend for what gets built there.
Roseau and the south-westThe Caribbean coastThe Atlantic side
St George with Roseau and the port, St Paul, St Luke and St Mark down to Soufrière and Scotts Head.
St Joseph, St Peter and St John: Layou, Colihaut and Portsmouth on the sheltered west coast.
St Andrew, St David and St Patrick: the airport at Melville Hall, the Kalinago Territory and the wild east coast.
Project types
The four project types behind most steel orders on the island, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.
Wesley and Woodford Hill, Melville Hall, Canefield
Terminal, hangar and cargo frames, airport services and transport buildings.
Going up beside the plant in Vietnam: World Steel framed its own office building.
Every parish, from Roseau to the Kalinago Territory
Housing frames, schools, clinics and government buildings designed with a continuous load path.
Process tower frame by World Steel in Vinh Long Province, Vietnam.
Roseau valley, Soufrière, Portsmouth, Calibishie
Lodges, villas, restaurant roofs and hotel blocks for nature tourism.
Space-truss roof under erection on a World Steel job in southern Vietnam.
Laudat, Fond Cole, Canefield
Geothermal and power plant buildings, water works, warehouses near the port.
Completed, clad building by World Steel in Quang Ngai Province, Vietnam.
Why World Steel
2,500 metric tons of structural steel a month from our own plant, released area by area.
Large-project program →Frames, purlins, cladding and anchors designed for the load path Maria tested.
Hurricane guide →Ductile frames and light members for earthquakes, volcanic soils and steep sites.
Volcanic ground guide →Calculations that state the code basis for your engineer and the Physical Planning and Development Authority.
Building code guide →Paint systems and galvanizing chosen for one of the wettest islands in the Caribbean.
Coatings guide →Packed in erection order and shipped to Woodbridge Bay Port, sized for mountain roads.
Port delivery guide →Buy it all in one place · Dominica
The new airport, resilient public buildings, geothermal power and hillside resorts. One World Steel order covers design, drawings, fabrication, coating, inspection, packing and shipping, FOB Vietnam or CIF Roseau, with every piece tracked live in PEB Studio.
All solutions and products for Dominica→Picked for Dominica
Hurricane, salt air and earthquake guides
Also from the same plant
One desk, every step
No prices are published. World Steel designs and fabricates the steel; the local contractor, our customer, erects it, and the engineer of record approves the drawings and seals them where local rules require.
Seeking Dominican contractor partners
The new international airport, the geothermal plant in the Roseau valley, resilient housing, schools and clinics, eco-resorts and warehouses around Roseau are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Roseau and back your bid with drawings and live tracking.
Hurricanes, salt air, earthquakes
A broad hazard picture for Dominica and the Caribbean guides that go deep on each one: wind and uplift design, ISO 12944 coatings, galvanizing, coastal details and post-storm care. Your engineer of record sets the site values.
Real World Steel photos
Real photos from World Steel: the plant, plate store, beam line, girders, fit-up, blasting, paint shop and packed bundles. None is shown as a site in Dominica.
Questions from Dominican buyers
New buildings need approval from the Physical Planning and Development Authority. Structural design follows the Dominica building code, from the regional OECS model code, with US standards such as the IBC and ASCE 7 commonly used for the detail. After Maria, resilience standards are taken seriously. We state the code basis your engineer of record sets on the first calculation sheet.
Hard. David in 1979 and Maria in 2017 both devastated the island, and Tropical Storm Erika in 2015 caused deadly floods and landslides. We design the whole load path for the wind speed your engineer sets.
Yes. It sits on the Lesser Antilles arc and has more potentially active volcanic centres than any other island in the region. Steel frames are designed for the seismic values your engineer sets.
Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.
Woodbridge Bay Port, just north of Roseau, takes most cargo. Portsmouth in the north is an option for some loads.
No. World Steel supplies the steel structure only. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.
Talk to an engineer
Our engineers and project managers work in English and reply with the code, wind, ground and delivery questions for your site.
Honest status. World Steel designs and fabricates to the code basis your engineer of record sets for Dominica and the US standards it references. We hold no approval, licence or registration in Dominica and do not apply for permits; planning permission, building approval and inspections are the contractor’s scope with the engineer or architect of record. We supply the steel structure only; erection and site work are the contractor’s.
Contact World Steel · Dominica
WhatsApp, email or a video call with our engineers, booked at an hour that suits Roseau. Our contact page for Dominica has the ports, the local time and the form.