Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Aerial view of the CPV Food Processing Factory

Aerial photo, World Steel project archive.

Dong Nai Province, Vietnam

CPV Food Processing Factory 2,500 t of structural steel for a factory in Vietnam

A food processing factory for CPV Food in Dong Nai Province, Vietnam (2020), built with about 2,500 metric tons (2,750 short tons) of World Steel structural steel. Large food plants are designed around the process lines and cold rooms inside them.

Location
Dong Nai Province, Vietnam
Building type
Factory
Year
2020
Structural steel
2,500 t
Next step Plan a similar building → Next step See all projects →

Project overview

About CPV Food Processing Factory

CPV Food Processing Factory in Dong Nai Province, Vietnam, was completed in 2020, with World Steel delivering the steel structure design, fabrication and supply. Food processing buildings generally combine production rooms, cold areas and packaging lines, and they need surfaces and details that are easy to keep clean, which influences how exposed steel is arranged.

US food processors, from snack makers to protein plants, face the same design pressures alongside USDA or FDA expectations led by their process consultants. We coordinate the steel layout with those requirements, design to IBC 2024 and ASCE 7-22 or your Engineer of Record’s basis, and ship the frame in erection-sequence packages. Share your plant program to begin.

About 2,500 tonnes for CPV Food, a large food processing company, matches a full month of World Steel's capacity in one project. Food plants of this scale combine processing, cold storage and dispatch, and the steel package is planned so each area can be handed over in turn.

In context

CPV Food Processing Factory by the numbers

Steel weight

About 2,500 metric tons of structural steel (2,756 short tons), about 1 months of the plant's 2,500 t monthly fabrication capacity.

It is the 2nd largest of the 20 projects on this site with a published steel tonnage.

In the portfolio

CPV Food Processing Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied CPV Food Processing Factory in 2020, together with 26 other projects shown here from that year.

Closest in steel weight:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.