Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Wyoming · Oil and gas

Structural steel for Wyoming oil and gas facilities

Wyoming produces oil and natural gas in the Powder River, Green River, Wind River and other basins, with Casper as the service center. Operators and service companies need process and compressor buildings, shops, platforms and equipment steel built to the owner’s specifications. We fabricate and galvanize it.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail along I-80 for your Wyoming site.

Long hot-dip galvanized ladder cages lying in a yard
Hot-dip galvanized ladder cages for a 50 m (164 ft) tower job, Vietnam.
Basins
Powder River, Green River
Hub
Casper
Coatings
Galvanized outdoors
Spec
Owner specifications

Why it matters

Process steel in the wind

A compressor building or service shop in the basins stands in high wind and drifting snow, often far from town. Owners specify materials, coatings and inspection in detail.

We fabricate to the owner’s specifications and inspection plan, galvanize exposed steel and pack it by system so each building goes up in order.

What we design and fabricate

Steel for energy sites

Equipment structures

Platforms and supports for process and electrical equipment.

Plant buildings

Process, compressor and maintenance buildings.

Galvanized steel

Hot-dip galvanizing for exposed outdoor steel.

Owner specifications

Fabrication to the owner’s project specifications.

Who does what

Energy steel, split clearly

World Steel supplies

  • Plant buildings, platforms and equipment steel
  • Fabrication to owner specifications
  • Galvanizing or coating systems for the exposure
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Process design and equipment data from the owner
  • Engineer of Record approval and PE seal
  • Foundations and equipment setting
  • Piping, electrical and controls
  • Erection and site work

Wyoming

What we do not claim

World Steel names no Wyoming energy or utility company as a customer and claims no completed Wyoming energy project. Process design and equipment are the owner’s scope.

Wyoming ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Wyoming contractors

Wyoming contractors: let’s win the next project together

If your next bid involves oil and gas, World Steel wants to be your long-term, win-win steel partner in Wyoming. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Wyoming project is cut, welded, inspected and packed.

Blue-coated frames waiting under the shop crane to be packed
Blue frames waiting their turn in the packing area, Vietnam plant.
Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Steel bundles stacked high on a packing frame awaiting loading
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.
Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.

Q&A

What Wyoming buyers ask

Do you work to operator specifications?

Yes. We fabricate to the owner’s project specifications and inspection plan.

Can you build service shops?

Yes. We frame heated shops with crane bays and wide doors.

Do you name operators as customers?

No. World Steel names no company as a customer on this site.

Official sources: Wyoming Oil and Gas Conservation Commission

Wyoming solutions

Every Wyoming guide

Related pages

Code facts on this page summarize Wyoming practice, the code that applies at your site, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Wyoming?

Send the drawings or the site address, size and use. We set the Wyoming design basis with your Engineer of Record, design or detail the steel for Wyoming wind, drifting snow and northwest seismic, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail along I-80 for the truck to your site.