Structural steel for New Madrid seismic design in Arkansas

The New Madrid seismic zone runs under the Mississippi River just east of Arkansas. Sites around Blytheville, Osceola and Jonesboro, often on deep soft soils, can fall in Seismic Design Category D. We design and fabricate the lateral steel to AISC 341 where it applies, with AWS D1.8-qualified WPS and welders.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through New Orleans or Houston for your Arkansas site.

Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Hazard
New Madrid zone
Soils
Deep, soft river soils
Design
AISC 341 where it applies
Welds
AWS D1.8-qualified

Why it matters

Soft soils raise the category

A warehouse in Jonesboro and the same warehouse in Fort Smith can end up in different Seismic Design Categories, because the deep river soils of the Delta amplify shaking. The category decides which lateral systems are allowed and how they are detailed.

We work from the site class and category your Engineer of Record sets, design or detail braced and moment frames to AISC 341 where they apply, mark protected zones on request and weld demand-critical joints with AWS D1.8-qualified WPS and welders.

What we design and fabricate

Steel for seismic categories

Braced frames

Special concentric and buckling-restrained frame steel.

Moment frames

Prequalified connections under AISC 358 where specified.

Demand-critical welds

Welds made by AWS D1.8-qualified welders with procedures on file.

Anchorage

Base plates and anchor rods for the seismic reactions.

Who does what

Seismic steel, split clearly

World Steel supplies

  • Lateral system steel designed or detailed to AISC 341 where it applies
  • AWS D1.8-qualified procedures and welders for demand-critical welds
  • Protected zones marked on the members on request
  • Mill certificates traced by heat, with Charpy results on request
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Site class and Seismic Design Category by the Engineer of Record
  • Engineer of Record approval and PE seal
  • Special inspections and the quality assurance plan
  • Foundations and anchorage installation
  • Erection and site work

Arkansas

What we do not claim

AISC 341 is a design standard, not a fabricator certificate, and World Steel holds no Arkansas engineering license. We design and fabricate to AISC 341 where it applies, and your Engineer of Record approves and seals the design.

Arkansas ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Arkansas contractors

Arkansas contractors: let’s win the next project together

If your next bid involves New Madrid seismic, World Steel wants to be your long-term, win-win steel partner in Arkansas. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Arkansas project is cut, welded, inspected and packed.

Blue-coated frames waiting under the shop crane to be packed
Blue frames waiting their turn in the packing area, Vietnam plant.
Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Steel bundles stacked high on a packing frame awaiting loading
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.
Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.

Q&A

What Arkansas buyers ask

Which Arkansas sites need seismic detailing?

Mostly the northeast near New Madrid. Your engineer sets the category from the site soils.

Is AISC 341 a certificate?

No. AISC 341 is a design standard. We design and fabricate to it where it applies.

Can you mark protected zones?

Yes. We mark protected zones on members on request.

Official sources: Arkansas Geological Survey

Arkansas solutions

Every Arkansas guide

Related pages

Code facts on this page summarize Arkansas practice, the Arkansas Fire Prevention Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Arkansas?

Send the drawings or the site address, size and use. We set the Arkansas design basis with your Engineer of Record, design or detail the steel to the Arkansas Fire Prevention Code, New Madrid seismic rules and storm loads, and quote it made in our plant in Vietnam, packed in erection order and delivered through New Orleans or Houston to your site.