Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Wyoming · Seismic

Structural steel for Teton and Yellowstone seismic design

Northwest Wyoming sits on the Teton fault and the Yellowstone region, among the most seismically active parts of the interior West. Jackson and Teton County sites can fall in higher Seismic Design Categories while also carrying very heavy snow. We design and fabricate the lateral steel to AISC 341 where it applies.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail along I-80 for your Wyoming site.

Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Faults
Teton and Yellowstone
Snow
Very heavy in Jackson
Design
AISC 341 where it applies
Welds
AWS D1.8-qualified

Why it matters

Heavy snow, active faults

A resort or public building in Jackson carries some of the heaviest snow in the state, and part of it counts as seismic mass. Frames and anchorage are sized for both.

We design or detail lateral systems to AISC 341 where they apply, mark protected zones on request and weld demand-critical joints with AWS D1.8-qualified WPS and welders.

What we design and fabricate

Steel for seismic categories

Braced frames

Special concentric and buckling-restrained frame steel.

Moment frames

Prequalified connections under AISC 358 where specified.

Demand-critical welds

Welds made by AWS D1.8-qualified welders with procedures on file.

Anchorage

Base plates and anchor rods for the seismic reactions.

Who does what

Seismic steel, split clearly

World Steel supplies

  • Lateral system steel designed or detailed to AISC 341 where it applies
  • AWS D1.8-qualified procedures and welders for demand-critical welds
  • Protected zones marked on the members on request
  • Mill certificates traced by heat, with Charpy results on request
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Site class and Seismic Design Category by the Engineer of Record
  • Engineer of Record approval and PE seal
  • Special inspections and the quality assurance plan
  • Foundations and anchorage installation
  • Erection and site work

Wyoming

What we do not claim

AISC 341 is a design standard, not a fabricator certificate, and World Steel holds no Wyoming engineering license. We design and fabricate to AISC 341 where it applies, and your Engineer of Record approves and seals the design.

Wyoming ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Wyoming contractors

Wyoming contractors: let’s win the next project together

If your next bid involves Teton and Yellowstone seismic, World Steel wants to be your long-term, win-win steel partner in Wyoming. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Wyoming project is cut, welded, inspected and packed.

Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.
Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.
Painted members strapped into bundles and stacked for the voyage
Bundles made up for an export shipment at the Vietnam plant.
Black-coated members bundled on a loading rack
Black-coated bundles staged on the loading rack, World Steel, Vietnam.

Q&A

What Wyoming buyers ask

Which Wyoming sites need seismic detailing?

Mostly the northwest. Your engineer sets the category from the site soils.

Does snow count in the seismic load?

Part of the roof snow counts as seismic mass where the code requires it.

Is AISC 341 a certificate?

No. AISC 341 is a design standard. We design and fabricate to it where it applies.

Official sources: Wyoming State Geological Survey

Wyoming solutions

Every Wyoming guide

Related pages

Code facts on this page summarize Wyoming practice, the code that applies at your site, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Wyoming?

Send the drawings or the site address, size and use. We set the Wyoming design basis with your Engineer of Record, design or detail the steel for Wyoming wind, drifting snow and northwest seismic, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail along I-80 for the truck to your site.