Balanced
Ground snow turned into a roof load through exposure, thermal and slope factors. ASCE 7-22 now publishes ground snow by risk category.
Ground snow
ASCE 7-22 hazard data by risk category, or your jurisdiction's published value
Load cases
Balanced, unbalanced, drift, sliding and rain-on-snow where applicable
Adjustments
Exposure and thermal factors, including unheated and freezer buildings
On the drawings
Design snow loads and drift zones shown in calculations and erection set
From ground to roof
Each one is read for your building and printed in the calculation package before a purlin is sized.
Read for your coordinates and risk category, or from the value your county or state publishes.
A windswept roof on open prairie keeps less snow than a sheltered roof among trees and taller buildings.
Heat escaping through a warm roof melts snow; an unheated barn or a freezer building keeps all of it.
Steep, slippery roofs shed snow; low-slope roofs hold it, and the snow that slides off has to land somewhere.
Five ways snow loads a roof
The blue shape on each roof shows where the snow sits in that case.
Ground snow turned into a roof load through exposure, thermal and slope factors. ASCE 7-22 now publishes ground snow by risk category.
Wind scours one side of a gable and dumps the snow on the other, so the frame carries a lopsided load.
Snow banks against roof steps, parapets, rooftop units and taller neighbors, and these drifts frequently set purlin and frame size.
Snow slipping off a higher sloped roof lands on a lower roof or canopy, which has to be designed to catch it.
A surcharge on low-slope roofs in certain regions, for rain that soaks into the snowpack and adds weight.
Shape matters
Low roof beside a taller one
A leeward drift builds against the step
Heavier purlins at tighter spacing inside the drift zone
Parapets and high walls
A windward drift forms in front of the wall
Drift load on the edge bays and on the parapet framing
Rooftop units and screens
Snow mounds around the obstruction
Local purlin and support checks
Canopies and lean-tos
Snow slides off the main roof and drifts as well
Canopy framing checked for both cases together
Future additions
A taller building added later throws a drift onto the old roof
Allow for the step now or re-check the roof later
Proven at scale
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so a large US package is a normal month, not a stretch.
5,000 t
Sunpro Steel Factory
Steel industry · about 5,500 short tons
2,500 t
CPV Food Processing Factory
Food processing · about 2,750 short tons
2,000 t
Long Son petrochemical complex
Oil and gas · about 2,200 short tons
2,000 t
M&D (MD Factory)
Warehouse and industrial · about 2,200 short tons
1,500 t
Tongwei Tien Giang feed factory, phase 1
Animal feed · about 1,650 short tons
1,000 t
New Era cold storage
Cold storage, phase 1 tonnage · about 1,100 short tons
Frames that carry it
Asked by US project teams
10 answers from our engineers, grouped by topic.
From ASCE 7-22 hazard data for your coordinates and risk category. Many mountain states and counties publish their own ground snow values, and an adopted local value takes precedence. Your Engineer of Record confirms which applies.
The 2022 edition maps ground snow directly for each risk category instead of applying an importance factor afterward. A hospital or fire station therefore starts from a higher ground snow than a warehouse on the same site.
Yes. Heat escaping through the roof melts some of the snow on a heated building. An unheated warehouse, a barn or a freezer building keeps the full snowpack, so the thermal factor raises the roof load.
Wind strips snow off the higher roof and drops it against the step, building a drift that can weigh several times the balanced load. ASCE 7 sizes that drift from the roof dimensions and the ground snow, and our design follows it.
They can. Snow piles around units, screens and parapets, and the purlins and supports in that area are checked for the local drift on top of the unit's own weight.
If a taller building may go up beside this one, it is cheaper to design today's roof for that future drift than to reinforce it later. Tell us at the quote stage and we show the allowance on the drawings.
Not reliably. A curved roof is checked for unbalanced snow, and snow sliding off a steep roof becomes a load on whatever sits below: a lower roof, a canopy or an entrance.
Only with a plan. Clearing one area and not another can overload parts of the frame, and shovels puncture panels. Work from the design snow loads in your records and hire a contractor who knows metal roofs.
On the first page of our calculations and on the erection drawings, with drift zones marked. Keep them with the closeout set so a future owner or engineer can find them.
Yes. Heavy snow means heavier frames and closer purlins, so tonnage rises; our plant fabricates 2,500 metric tons of structural steel a month and ships large jobs in erection-sequence loads.
Keep reading
Each one goes deeper on a part of the design this page touches.
All eight US site-condition guides, the standards we design to and the IAS AC472 program are on the engineering & standards hub.
Proof at scale
Photo
Photo
Covered in our state guides
Share drawings, a sketch or the footprint and site address. We agree the design criteria with your Engineer of Record, then send a written scope and the list of submittals, from a plant that fabricates 2,500 metric tons of structural steel a month.