Louisiana · Uniform code
The Louisiana uniform construction code for structural steel
After the 2005 hurricanes, Louisiana adopted a statewide building code. The Louisiana State Uniform Construction Code Council adopts the International Building Code with Louisiana amendments, and every parish and municipality must enforce it, either with its own building department or through a third-party provider. Industrial owners often add their own steel specifications on top.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to your Louisiana site through the Port of New Orleans and the river ports.
- Adopting body
- LSUCC Council
- Code
- IBC with Louisiana amendments
- Reviewer
- Parish, city or third-party provider
- Our part
- Code basis on the first calculation sheet
Why it matters
One state code, many reviewers
Statewide adoption keeps the design basis consistent from Shreveport to New Orleans, but enforcement is local, and plants inside large industrial sites often follow the owner’s specification as well. The adopted IBC edition decides which ASCE 7 edition sets the wind loads.
We state the code edition, the jurisdiction, any owner specification and the loads on the first sheet of the calculations. Your Engineer of Record confirms them, and the steel design, connections and drawings follow from there.
Who does what
The permit path, split clearly
World Steel prepares
- Steel design to the adopted IBC and ASCE 7
- Design calculations and drawings for review
- Tekla shop and erection drawings, included
- Anchor bolt layouts and foundation reactions
- Mill certificates and fabrication records
The US contractor arranges
- Engineer of Record review, approval and PE seal
- Submittal to the parish, city or third-party provider
- Special inspections on site under IBC Chapter 17
- Foundations, erection and site work
- The building permit and certificate of occupancy
What we check first
Four questions before the first calculation
Which jurisdiction?
The parish, city or third-party provider for your site.
Which edition?
The IBC edition adopted and its ASCE 7 edition.
Which owner specification?
Plant standards that add to the code.
Which inspections?
Special inspections expected for the steel.
Louisiana
What we do not claim
World Steel holds no Louisiana approval, registration or engineering license. Drawing approval, the PE seal, plan review and the permit stay with the US contractor and the Engineer of Record.
Louisiana ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Louisiana contractors
Louisiana contractors: let’s win the next project together
If your next bid involves uniform construction code, World Steel wants to be your long-term, win-win steel partner in Louisiana. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Louisiana project is cut, welded, inspected and packed.
Q&A
What Louisiana buyers ask
Does every parish use the same code?
Yes, the uniform code applies statewide; enforcement and any limited local additions differ.
Can you work to a plant owner’s specification?
Yes. We fabricate to the owner’s specification and the Engineer of Record’s drawings.
Do you provide sealed drawings?
No. We provide calculations and drawings for your Engineer of Record, who approves them and applies the PE seal.
Official sources: Louisiana State Uniform Construction Code Council
Louisiana solutions
Every Louisiana guide
Related pages
Code facts on this page summarize Louisiana practice, the Louisiana State Uniform Construction Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and amendments in force for your permit.
Building in Louisiana?
Send the drawings or the site address, size and use. We set the Louisiana design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.