Gate of the World Steel plant with the office block and two of its fabrication halls

The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

IAS AC472 · since 2019

Accredited since 2019. Audited twice a year.

Ordering steel from overseas raises a fair question: who checks the shop? For World Steel the answer has been the same since 2019. The International Accreditation Service accredits World Steel Construction JSC under AC472 for metal building design (Part C) and fabrication (Part A), and the plant and design office are audited twice a year with IAS experts. World Steel is the first and only fabricator in Vietnam to hold this accreditation.

On the journey since
2019
Plant & office audits
Twice a year
Accredited scope
Part A + Part C
Inspection agency
Smith-Emery (AA-554)

Our AC472 journey

From 2019 to today, renewed every year

Accreditation is not a badge you earn once. World Steel entered the IAS AC472 program in 2019 and has had to earn it again every year since, audit by audit, in front of IAS experts and an independent US inspection agency.

  1. 2019

    The journey begins

    World Steel's design office and plant enter the IAS AC472 program for metal building systems, under program number MB-268.

  2. Every year

    Two audits with IAS experts

    The plant and design office are audited twice a year, and every finding is closed with evidence before the next visit.

  3. Every certificate

    Smith-Emery on site

    Each certificate names Smith-Emery Laboratories (IAS AA-554) as the agency that conducts periodic plant inspections.

  4. Today

    Still the only one in Vietnam

    Part A and Part C remain in scope, with the current certificate valid up to August 1, 2027.

7 years of AC472 audits mean the system your building passes through has been tested many times over, not just set up for a single inspection.

Twice a year, with IAS experts

How an AC472 audit year runs

Two audits a year mean the quality system has to work in January and in July, on a quiet week and on a busy one. Here is the rhythm, and what the auditors look at.

  1. IAS experts on site

    IAS assessors and the Smith-Emery inspector review the program with our engineers and QC team.

  2. Corrective actions

    Findings are closed with evidence, not promises.

  3. Second audit of the year

    The plant is audited again, so the system has to hold up all year, not on one day.

  4. Certificate renewed

    IAS renews the accreditation only when the year's audits are closed.

What each audit walks through

  • Quality manual and procedures

    The written program is checked against AC472, then against what people on the floor actually do.

  • Design office (Part C)

    Calculation packages, drawing checks and design change control for metal building systems.

  • Welding

    Procedures backed by qualification records, welder qualifications kept current, and welds checked on real parts.

  • Material traceability

    Every heat of steel followed from the mill certificate to the member it became.

  • Shop floor and finished parts

    Dimensions, fit-up, coating and marking checked on members in production and ready to ship.

  • Findings closed

    Anything an auditor raises is corrected and documented before the next visit.

Smith-Emery Laboratories logo

IAS inspection agency AA-554

Our partner

Smith-Emery, independent eyes on our plant

Founded in Los Angeles in 1904, Smith-Emery Laboratories, Inc. is an independent US testing, inspection and materials engineering firm. For more than a century its inspectors have checked steel, welds and building materials for US building officials and project owners. Smith-Emery is itself accredited by IAS as an inspection agency (AA-554), and every World Steel AC472 certificate names it as the agency that conducts periodic plant inspections to monitor compliance with AC472.

  • An inspector who answers to IAS, not to World Steel.
  • Findings go into the record IAS reviews before it renews the accreditation.
  • A name your US plan reviewer and special inspector already know.

Certificates over the years

One program number, MB-268, renewed year after year

Each IAS certificate runs to August 1. Together they show an unbroken record from the first certificate to the one in force today. Open any of them full size.

  • IAS AC472 certificate of accreditation for World Steel Construction JSC, MB-268, valid up to August 1, 2027

    Valid to August 1, 2027

    Current

    The certificate in force today: Part A and Part C, with Smith-Emery still conducting the plant inspections.

  • IAS AC472 certificate of accreditation for World Steel Construction JSC, MB-268, valid up to August 1, 2026

    Valid to August 1, 2026

    The certificate now lists both sites by address: the plant (Part A) and the design office (Part C).

  • IAS AC472 certificate of accreditation for World Steel Construction JSC, MB-268, valid up to August 1, 2025

    Valid to August 1, 2025

    The in-plant program now recognized under the 2021 and 2024 IBC as well.

  • IAS AC472 certificate of accreditation for World Steel Construction JSC, MB-268, valid up to August 1, 2024

    Valid to August 1, 2024

    Fifth certificate in a row, still naming Smith-Emery for periodic plant inspections.

  • IAS AC472 certificate of accreditation for World Steel Construction JSC, MB-268, valid up to August 1, 2023

    Valid to August 1, 2023

    Another year of audits closed, another renewal from IAS.

  • IAS AC472 certificate of accreditation for World Steel Construction JSC, MB-268, valid up to August 1, 2022

    Valid to August 1, 2022

    Renewed again, with the program tied to IBC §1704.2.5.1 in the 2015 and 2018 editions.

  • IAS AC472 certificate of accreditation for World Steel Construction JSC, MB-268, valid up to August 1, 2021

    Valid to August 1, 2021

    Renewed after a full year of audits, with the same Part A and Part C scope.

  • IAS AC472 certificate of accreditation for World Steel Construction JSC, MB-268, valid up to August 1, 2020

    Valid to August 1, 2020

    The first certificate in the series: Part A fabrication and Part C design under one program number, MB-268.

Download the current certificateFree, no form. Earlier certificates can be viewed online in the download center.

Scope of the accreditation

Two parts are accredited. Part A covers the Hai Son Industrial Park plant, where structural weldments and welded cold-formed products are made. Part C covers metal building system design at the engineering office on Le Thuc Hoach Street, Ho Chi Minh City. IAS records the in-plant inspection program as meeting IBC §1704.2.5.1 in the 2015, 2018, 2021 and 2024 editions, and Smith-Emery Laboratories (IAS AA-554) visits the plant for periodic inspections.

Part A, fabrication

The plant at Hai Son Industrial Park, Vietnam, where your structural weldments and welded cold-formed parts are made.

Part C, design

The Ho Chi Minh City engineering office on Le Thuc Hoach Street, where your metal building system is designed.

Your design, inside an audited office

Your building is engineered by World Steel staff working under the Part C program, to the criteria your contract documents set. Unless your Engineer of Record names another basis, that means IBC 2024 with ASCE 7-22 loads, and AISC 360 and AISI S100 for the members. The calculation package and drawings go to your Engineer of Record for review and approval.

What Part A puts in place on the shop floor

  • No production weld without a qualified procedure (WPS backed by a PQR) and a welder whose qualification is current.
  • An Inspection and Test Plan whose hold and witness points you, or your inspector, are welcome to attend.
  • Every heat of steel tied to its EN 10204 3.1 mill certificate.
  • Results of NDT, dimensional and coating checks collected in the Manufacturing Data Record.

Chapter 17 and the approved-fabricator question

The IBC asks for special inspection of fabricated load-bearing steel. Section 1704.2.5 then lets the building official set aside the in-shop part of that inspection when an approved fabricator does the work. IAS accreditation is widely used by US jurisdictions as grounds for that approval, yet it remains the official’s decision, and local amendments may change how it works. According to the current certificate, World Steel's in-plant inspection program satisfies IBC §1704.2.5.1 in the 2015, 2018, 2021 and 2024 editions. Bring it up at the start of plan review, and expect the field special inspections on your schedule to go ahead as listed.

Verify it in three steps

Why it matters to a US owner, contractor or engineer

  • Your building official has recognized evidence to weigh when deciding on a §1704.2.5 waiver of shop special inspection.
  • Design office and plant answer to the same audited quality system, with inspection records you can request.
  • The record goes back to 2019, so you are not the first project to test the system.
  • The submittal arrives in a form your Engineer of Record and plan reviewer can work from without translation.

Limits of the accreditation

  • Inspections on the jobsite during erection still apply; IAS says so in its own FAQ.
  • Erection and assembly are outside it and fall under a different IAS program, AC478. World Steel supplies the steel structure; partner erectors in the US put it up.
  • It is neither a permit nor a product or building approval, and it cannot guarantee a permit.
  • World Steel becomes the project’s Engineer of Record only if your contract makes it so.

IAS AC472

Frequently asked questions

How long has World Steel been in the IAS AC472 program?

Since 2019. World Steel Construction JSC has held the accreditation for metal building systems under program number MB-268 since then, renewing it every year. The certificates on this page run from August 1, 2020 to the current one, valid up to August 1, 2027.

How often is the plant audited?

Twice a year, with IAS experts. Each audit covers the design office and the plant, and the accreditation is renewed only after the year's findings are closed.

Who is Smith-Emery and why is it on the certificate?

Smith-Emery Laboratories, Inc. is an independent testing and inspection laboratory founded in Los Angeles in 1904, itself accredited by IAS as inspection agency AA-554. Every World Steel AC472 certificate names Smith-Emery as the agency conducting periodic plant inspections to monitor compliance with AC472.

What exactly is IAS AC472?

It is the set of accreditation criteria the International Accreditation Service uses to evaluate the inspection programs of metal building manufacturers that both design and fabricate. An accredited company has shown IAS that its engineering, purchasing, design, fabrication and quality control satisfy the standards IBC Chapter 17 points to. World Steel holds it for Part A, the plant in Vietnam, and Part C, the design office in Ho Chi Minh City.

Can it spare us the shop special inspection under IBC Chapter 17?

Possibly. Chapter 17 expects special inspection of fabricated load-bearing steel, but the building official may waive the shop portion for a fabricator approved to do the work without it, and plan reviewers commonly look to IAS accreditation as the basis for that approval. The decision belongs to your building official, so put the question on the table early in plan review.

Will inspections still happen on our site?

Yes. IAS is explicit that AC472 has nothing to do with inspection at the construction site while the building goes up. Erection has its own IAS program, AC478, and your jurisdiction's special inspection and field inspection rules apply as usual.

Does the accreditation guarantee our permit?

No. Your local building department issues the permit after reviewing the whole submittal. The accreditation speaks only to how fabrication is inspected; it is not a permit, a product approval or an assurance that the plans will be accepted.

How do we verify the accreditation ourselves?

Search the IAS online directory for World Steel under Metal Building Systems (AC472), or open the certificate PDF that IAS hosts on iasonline.org. Confirm the company name, the Part A and Part C scope and the expiry date.

Preparing a permit submittal?

Request the IAS certificate, a scope letter and the quality records your plan reviewer or special inspector will want to see.