New Hampshire · Snow
Structural steel for New Hampshire mountain snow
New Hampshire ground snow loads rise steeply from the Seacoast and the Merrimack Valley toward the White Mountains and the North Country, where resort towns see deep, long-lasting snow. We take snow for each site elevation and check drift and sliding snow at every roof step and unit.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through New York or Boston for your New Hampshire site.
- South
- Moderate snow
- Mountains
- Steeply higher
- Check
- Drift and sliding
- Frost
- Deep footings
Why it matters
Snow by the meter of elevation
Two sites an hour apart, one in Concord and one in Lincoln, can have very different ground snow. Resort buildings add steep roofs, sliding snow and drift against taller parts.
We size purlins, rafters and frames for the site snow, drift and sliding snow, detail thermal breaks for heated buildings and give your foundation engineer frost-depth reactions.
What we design and fabricate
Steel for heavy snow
Purlins for drift
Z purlins lapped and sized where drift collects.
Rafters and trusses
Built-up rafters and trusses for heavy snow over long spans.
Thermal breaks
Details that keep cold out of heated and frozen spaces.
Base reactions
Clear reactions for footings set below the frost line.
Who does what
Snow and frost, split clearly
World Steel supplies
- Roof steel designed for snow and drift to ASCE 7
- Drift checks at steps, parapets and rooftop units
- Thermal break details at the envelope
- Base reactions for the foundation design
- Tekla shop and erection drawings, included
The US contractor arranges
- Ground snow and exposure with the Engineer of Record
- Engineer of Record approval and PE seal
- Frost depth and footing design
- Cold-weather concrete and site work
- Erection and site work
New Hampshire
What we do not claim
World Steel does not design foundations. Frost depth and footing design are your foundation engineer’s scope; we provide the base reactions they need.
New Hampshire ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New Hampshire contractors
New Hampshire contractors: let’s win the next project together
If your next bid involves mountain snow, World Steel wants to be your long-term, win-win steel partner in New Hampshire. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New Hampshire project is cut, welded, inspected and packed.
Q&A
What New Hampshire buyers ask
Is snow taken by elevation?
Yes. Ground snow is taken for the site elevation from ASCE 7 and state data.
Do you check sliding snow?
Yes. Sliding snow and drift are checked at lower roofs and steps.
Do you design the footings?
No. Your foundation engineer designs them; we provide the reactions.
Official sources: ASCE 7 Hazard Tool
New Hampshire solutions
Every New Hampshire guide
Related pages
Code facts on this page summarize New Hampshire practice, the New Hampshire State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in New Hampshire?
Send the drawings or the site address, size and use. We set the New Hampshire design basis with your Engineer of Record, design or detail the steel to the New Hampshire State Building Code, mountain snow and seismic, and quote it made in our plant in Vietnam, packed in erection order and delivered through New York or Boston to your site.