Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Animal feed factory steel structure by World Steel, Tongwei phase 1

For plants, shops, farms and ranches

Industrial steel buildings laid out around your process, cranes and next bay

A plant is designed from the inside out: the line, the crane, the forklift aisles, the next expansion. World Steel engineers the frame around them and fabricates it in a plant that has delivered feed mills, food plants and steel works of 1,500 to 5,000 t.

  • Layouts built around the process, the cranes and the machinery
  • End walls ready for the next bay
  • Support steel for equipment, platforms and storage

2,500 t a month · IAS AC472 since 2019 · jobs up to 5,000 t

  • Crane bay
  • Forklift aisles
  • Mezzanine and platforms
  • Next bay

Where jobs get stuck

What industrial & agricultural operators tell us goes wrong

  • Growing without shutting downProduction has to keep running while the new building goes up beside it.
  • Aggressive interiorsChemicals, fertilizer, steam and livestock attack ordinary coatings.
  • Cranes and heavy equipmentRunways, brackets and platforms have to be part of the frame design.

What changes with World Steel

How we take those problems off your desk

  • Crane bays in the same modelRunway beams, brackets and stepped columns designed with the frame.
  • End walls ready to extendRemovable end walls and frames sized for the next bay.
  • Coatings for the interiorGalvanizing or paint systems matched to what the building holds.
  • Support steel for equipmentPlatforms, mezzanines, stairs and pipe supports detailed with the frame.

Plan view

Plan view: the frame follows the process

How our engineers read your layout before they size a single member.

Plan view: the frame follows the process

Crane bayForklift aisleMezzanineNext bay
  • Crane bayRunway beams and stepped columns sized for the crane class and wheel loads you give us.
  • Forklift aislesColumn grid set to the aisle widths and turning space of your fleet.
  • Mezzanine and platformsFloor steel and stairs for offices, control rooms and equipment.
  • Next bayEnd wall frame and anchor rods planned so the building can grow.

Request a quotation · Industrial & Agricultural Operators

Send us your next steel package

Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.

Plan your plant, shop or farm building
Become our partner in the US Operators with phased site plans get the same engineers and frame logic for every expansion, under agreed repeat terms. Contractor Partnership Program

Your scope, mapped

Systems, guides and services that come up in your work

The parts of World Steel that industrial & agricultural operators use most, each with its own page to read before you call.

Ecosystem for Industrial & Agricultural Operators

  • Wind, snow & seismic designHow we size a US steel building for ASCE 7-22 wind, snow and earthquake loads at your exact address.
  • Design processEight steps from your RFQ to released shop drawings, with an approval gate before any steel is cut.
  • Quality controlEight inspection points you can witness on site, through a third-party inspector or live by video.
  • IAS AC472 — Metal Building Systems
  • EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
  • EN 1090 EXC3 (CE marking) 2797 CPR 827443
  • AS/NZS 5131 CC3 BMP 827566

How mill certificates and inspection records reach your inspector

Questions

What industrial & agricultural operators ask us first

Still have one? Ask it in the quote form and an engineer answers in writing.

Plan your plant, shop or farm building
Can you design crane runways into the building?

Yes. Give us the crane capacity, span, class and wheel loads. Runway beams, brackets and columns are designed in the same model as the frame and checked for deflection.

Can the new building go up next to a running plant?

Bolted steel is fabricated off site and shipped in erection order, which keeps site work short. Your US contractor plans erection around your operations.

What coatings suit a feed mill or fertilizer store?

Usually hot-dip galvanizing or a multi-coat paint system with a higher dry film thickness. We propose one for your interior and state it on the drawings.

What large industrial jobs has World Steel done?

Sunpro Steel at 5,000 t, CPV Food at 2,500 t, Tongwei feed factory phase 1 at 1,500 t and New Era cold storage phase 1 at 1,000 t, among others.

Do you supply farm and ranch buildings too?

Yes. Machine sheds, hay barns and livestock buildings are engineered to your site loads like any other building.

Who erects the building?

Your US contractor. World Steel designs, fabricates and supplies the steel, and its engineers answer field questions during erection.

Code editions, local amendments and design loads differ by state. Check the guide for your project location.

All state guides →

World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).

Ready to price your next steel package?

Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.