Structural steel for the Texas petrochemical and energy coast
The Houston Ship Channel, Freeport, Beaumont–Port Arthur and Corpus Christi hold one of the largest refining and chemical clusters in the world, and LNG export terminals keep growing along the coast. These projects buy steel in thousands of tons, to owner specifications, in tight erection sequences. That is the work our plant is sized for.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Texas port.
- Typical scope
- Pipe racks, equipment structures, shelters, process buildings
- Specifications
- Owner and engineering-contractor specs, AISC 360, ASCE 7-22
- Coatings
- Hot-dip galvanizing or multi-coat systems for the exposure
- Reference
- Long Son petrochemical complex: 2,000 t, 56,000+ m²
Why it matters
Petrochemical steel is bought by the thousand tons
A new cracker, a polymer line or an LNG train needs kilometers of pipe rack, dozens of equipment structures and a set of process and utility buildings. The engineering contractor releases them in packages, each with its own drawings, coating system and delivery date, and the fabricator has to keep pace with the module and erection plan on site.
World Steel fabricated the steel for the Long Son petrochemical complex in southern Vietnam: about 2,000 metric tons for a site of more than 56,000 m² (600,000 sq ft). Our plant turns out 2,500 metric tons of structural steel a month, so a Texas package of that size runs alongside our other work rather than in place of it.
What we fabricate
The structures a Gulf Coast plant is made of
Pipe racks
Main and secondary racks with braced bents, longitudinal struts and cable tray supports, drawn to the piping layout.
Equipment structures
Multi-level platforms for vessels, exchangers and pumps, with grating, stairs, ladders and handrails.
Compressor and pump shelters
Open-sided or clad shelters with crane runway beams for maintenance lifts.
Process and utility buildings
Control, electrical, warehouse and maintenance buildings around the units.
Fireproofing-ready steel
Members prepared for the fireproofing your specification calls for, coordinated with the applicator.
Corrosion protection
Hot-dip galvanizing or multi-coat systems chosen for the humid, salt-laden air of the coast.
How a package runs
From specification to the laydown yard
Each step is agreed with the engineering contractor before fabrication starts.
| Step | What happens | What you receive |
|---|---|---|
| Specification review | We read the owner and contractor specifications for steel, welding, coating and inspection | A list of clarifications and exceptions, before price |
| Detailing | Tekla model and shop drawings from your design drawings and model | Shop drawings for approval, at no extra charge |
| Fabrication | Cutting, drilling, welding and coating in our plant in Vietnam | Progress in PEB Studio, member by member |
| Quality records | Mill certificates by heat, weld and coating inspection records | A data book per package |
| Shipping | Packing by area and erection sequence, shipped to a Texas port | Packing lists and piece marks that match the erection plan |
What we do not claim
We fabricate to the specification of each project and claim no owner approval, plant certification or performance rating of our own. Process design, fireproofing application, erection and site inspection are the scope of the owner, the engineering contractor and the US contractor.
Texas ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Texas project is cut, welded, inspected and packed.
Q&A
What Texas buyers ask
Can you fabricate to our company specifications?
Yes. We review your steel, welding, coating and inspection specifications before pricing and list any clarification in writing. Fabrication then follows the specification, with records in the data book.
Do you supply galvanized steel for pipe racks?
Yes. Hot-dip galvanizing or a multi-coat paint system is chosen for the exposure and the specification; members are detailed for galvanizing with vent and drain holes where needed.
Do you apply fireproofing?
We prepare the steel for the fireproofing your specification calls for and coordinate with the applicator. Shop-applied intumescent coating is discussed per project; cementitious fireproofing is usually applied in the US.
Have you done petrochemical work before?
Yes. Our reference is the Long Son petrochemical complex in Vietnam, about 2,000 metric tons of structural steel for a site of more than 56,000 m². We do not claim a completed Texas plant.
Texas solutions
Every Texas guide
Related pages
Code facts on this page summarize Texas rules, the International Building Code, ASCE 7-22 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.
Building in Texas?
Send the drawings or the site address, size and use. We set the Texas design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.