The sheet is released to the plant. Materials are cut and fabrication starts for that release.
Where it sits in the US code stack
Where it governs in your building
Your reviewer's stamp sets the next step
Three stamps, three outcomes, one current revision
Use your normal review stamp. Each outcome triggers a fixed response on our side, logged against the sheet and revision, so no superseded drawing ever reaches the shop floor or your site.
Notes are taken into the model, the sheet is reissued with the notes clouded, and fabrication proceeds on the noted revision.
Nothing is fabricated. We answer every comment on a response sheet, revise the model and resubmit the sheet under the next revision.
How a sheet's revisions read
- AIssued for approval
- BRevised per review comments
- 0Released for fabrication
- 1As-built, record set
11 answers from our engineers
Shop drawings questions and answers
How submittals actually run between your design team in the US, our engineers and plant in Vietnam and your jobsite: what is submitted, how reviews are answered, how revisions are controlled and what you receive at the end.
What gets submitted 4 answers
How should our reviewer mark up the drawings?
Use your normal stamp; approved, approved as noted and revise-and-resubmit all work for us. The plant receives a release only for sheets marked approved.
What is the difference between approval drawings and shop drawings?
Approval drawings show the building as a whole, frames, bracing, anchor rods and reactions, for your Engineer of Record and plan reviewer. Shop drawings show every assembly and part with its welds, holes and coatings, for fabrication and inspection.
Are shop drawings extra?
No. Shop drawings come with every World Steel project at no extra charge, along with approval and erection drawings.
Will our architect get the steel in 3D?
Yes, as an IFC file that ships with the approval set for their coordination model.
Reviews and RFIs 4 answers
How fast do you answer review comments?
Every comment gets a written reply on a response sheet, and the revised sheets follow. Timing depends on the scope of the comments; the response sheet and revised set come back as one package so your reviewer checks once.
What is an RFI, and when do you send one?
A Request for Information: a numbered question on the contract documents when something is missing, unclear or conflicting. We send one rather than guess, and log the answer so it can be traced later.
Can we review drawings in PEB Studio instead of by email?
Yes. Released drawings, comment logs and RFIs are available in PEB Studio, and every revision stays on file. Email submittals work too if your team prefers them.
Who has to approve before fabrication starts?
The US contractor's Engineer of Record, and anyone else your contract names, such as the architect. We never fabricate from unapproved drawings.
Revisions and closeout 3 answers
How do you stop an old drawing reaching the shop floor?
Only released revisions are issued to the plant, and each new release withdraws the previous one. Drawings come from one Tekla model, so a change updates every sheet that depends on it.
How are revisions marked?
Changes are clouded on the sheet, the revision table gets a new line with date and description, and the change log records why. Your reviewer can see exactly what changed since the last look.
What do we receive at closeout?
The as-built drawing set, the IFC model, the Manufacturing Data Record and the full revision and RFI history, locked in PEB Studio so what you received is what stays on file.
More answers on every US code we design to: search all standards questions.
Submittal set
What goes out for review and why
| Submittal | Reviewed by | Purpose |
|---|---|---|
| Design criteria sheet | Engineer of Record | Agree the rules of the game: code edition, loads, assumptions |
| Approval drawings and calculations | Engineer of Record, architect, building department | Verify the structure works and fits |
| Anchor rod plan and reactions | Foundation engineer | Design the footings and place the rods |
| Shop drawings (every project, included at no extra charge) | Engineer of Record or special inspector | Review details before fabrication |
| Erection drawings | General contractor and erector | Put the building together in sequence |
| As-built record | Owner | Upkeep and future changes |
Revision control
Keeping every party on the latest drawing
Comment log
Every review comment gets a written reply on a response sheet and is closed out in the following revision.
Numbered RFIs
Questions on the contract documents go out as numbered RFIs, so each answer can be traced later.
Released only
You see released documents; internal working notes and pricing are kept internal.
Locked at closeout
At closeout PEB Studio locks the record, so what you received is what stays on file.
Who does what with the drawings
One drawing set, three sets of hands
Shop drawings come with every World Steel project at no extra charge. The approval loop around them works like this.
World Steel
- Details every piece in Tekla from the approved design
- Issues approval, shop and erection drawings under revision control
- Fabricates only from drawings that are approved
US contractor and Engineer of Record
- Review the drawings and return them approved, approved as noted or revise and resubmit
- Coordinate openings, embeds and other trades against the drawings
- Erect from the latest erection drawings
Other trades
- Check door, duct and equipment openings against the frames
- Send their changes before approval, not after cutting
- Work from the same revision posted in PEB Studio
What reviewers ask
Four questions about the drawing set
The answers are part of how the set is issued.
Is this the current revision?
Revisions are clouded and numbered, with a change log, and PEB Studio shows the current set.
Do the shop drawings match the design?
Both come from the same model, and the member sizes match the calculations.
Where are the field connections shown?
Erection drawings show every field joint, with bolts and joint types.
What happens to a comment after approval?
A change after approval is a new revision, issued for approval again before it is cut.
In your submittal file
Four drawing records from approval to handover
Each one is issued in PEB Studio, and the set is frozen at closeout.
-
Approval drawings
Anchor bolt plan, frame elevations and bracing, for your approval.
Sample approval drawings
Real photos from World Steel
From approved drawing to packed bundle
Photographed in our own plant in Tay Ninh Province, Vietnam, and on World Steel jobs. Not stock images.
Shop drawings never works alone
The standards and guides it works with
Each link opens the full page, with its own questions and answers.
Who does what
World Steel designs, fabricates and supplies the steel structure from its own plant in Vietnam. The US contractor, our customer, erects it, has the drawings approved and sealed by their Engineer of Record and pulls the permit.
Verified Edition: As your project specifies
Source record: https://worldsteelgroup.com/capabilities/
Last checked: November 8, 2026. Editions change on a cycle, so your Engineer of Record confirms which one your jurisdiction enforces.
All US codes & standardsWant to see a sample submittal set?
Ask for one with your RFQ. We send a sample design criteria sheet, approval drawings and shop drawings, so your reviewer knows what to expect. Shop drawings are included on every project at no extra charge.