After you sign

A single point of contact from contract to delivery

Your steel is engineered and fabricated in Vietnam and erected by your crew in the United States. A named project manager connects the two, so you deal with one supplier who answers for design, fabrication and shipping, on a rhythm that fits your US workday.

Across the time difference (standard time)

New York8:00 AM
Vietnam plant8:00 PM

Your morning call reaches our team at the end of its day, with the day’s shop records already in PEB Studio.

Chicago4:00 PM
Vietnam plant5:00 AM next day

Comments you send before you leave are in the queue when our shift starts.

Los Angeles5:00 PM
Vietnam plant8:00 AM next day

Your end-of-day questions are answered while you sleep.

Timeline

What happens once the contract is signed

Phases overlap on purpose: drawings for later sequences are still in approval while the first sequence is in the shop. Your project manager keeps every thread visible.

Kickoff call

Scope, exclusions, contacts, Incoterm, importer of record and the baseline schedule are confirmed on video. Your PEB Studio access is created.

Design and submittals

Each drawing issued and each approval due is tracked, so a slow review is flagged before it delays the shop.

Material purchasing

Plate and coil are ordered against the approved design and logged by heat number on arrival.

Fabrication

Production is tracked member by member and sequence by sequence, with photos and status in PEB Studio.

Inspection

Hold and witness points are announced ahead, so you or your inspector can attend in person or by video.

Packing and booking

Bundles are packed in erection sequence. Booking details, export documents and loading photos are shared before departure.

US arrival and site support

Your broker and trucker take the cargo to site; your crew checks it against the packing list, and our engineers answer questions against the model.

Closeout

As-built drawings and quality records are handed over, and every open item is closed in writing.

Bars show how phases overlap, not durations. Your schedule is set at kickoff for your job.

Communication

How you stay in the loop

Six channels, each with a clear rhythm. You never have to chase a status, because the record is already in PEB Studio and the next call is already booked.

Office block of World Steel standing between two fabrication halls Photo
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
From kickoff to closeout

A named project manager

One accountable person for schedule, documents and questions.

On the rhythm agreed at kickoff

Progress reports

Status against schedule, shop photos, open issues and the next milestones.

Any time, any US time zone

PEB Studio access

Production, inspection records and packing lists as they are created.

Start or end of your US day

Video meetings

Zoom or Microsoft Teams calls for reviews and witness inspections.

Every drawing issue

Revision control

Your team, erector and inspector work from the same set.

Until each item closes

Issue log

RFIs, changes and nonconformances, each with an owner and a due date.

Scope

Who handles what on a US job

Each contract defines the split. This is the typical arrangement: World Steel designs, fabricates and supplies the steel structure; you, the US contractor and our customer, own the site.

ItemWorld SteelYou, your EOR or your erector
Steel structure designCalculations, drawings, submittal packageReview and approve through your Engineer of Record, who seals
FoundationsAnchor rod plan and base reactionsDesign and pour
Building permitDocuments for the submittal and answers to plan review commentsApply to the local building department
Fabrication, QC, packingYes, in our own plant in VietnamWitness inspections if you choose
Ocean freight, customs, duties, truckingPer the Incoterm and importer of record named on the quoteCustoms broker, any US duties and inland trucking unless included
ErectionErection drawings and remote support from the engineers who detailed the steelYour crew or the erector you hire builds the structure

When something goes wrong

Issues get an owner and a closing date

No steel job is free of problems. The test is how fast they surface and get fixed. A defect found in our shop becomes a nonconformance report: the piece is held, repaired and re-inspected before it can be packed. A short or damaged item at your site is photographed, logged by piece mark and resolved by your project manager.

PEB Studio records the bundle and container of every member, so a missing purlin is traced from data rather than memory.

Issue logExample entries
RFI-014Confirm door opening on gridline CYour EORBefore approval rev CAnswered
NCR-006End plate hole offset on one rafterWorld Steel QCBefore packingRepaired, re-inspected
CHG-003Add solar collateral load to roofProject managerPrice and schedule in writingApproved
SITE-002One purlin bundle strap damagedProject managerNext shipmentReplacement booked

Asked by US contractors

Questions on project management

Do you have a US office or erection crew?

World Steel has a US office in Westminster, California, but no erection crew. Projects are managed from our engineering office and plant in Vietnam by a named project manager, with video meetings and PEB Studio access. Your crew or the erector you hire builds the structure.

How often do I get updates?

Your project manager sends progress reports on the rhythm agreed at kickoff, and PEB Studio shows live status in between.

Who pays US import duties?

Imported steel can be subject to US duties. Each quote states the Incoterm and who acts as importer of record, and that party handles customs entry and any duties.

What if a piece arrives damaged or short?

Photograph it during unloading and send it to your project manager. Each item is traced by piece mark, bundle and container, and the replacement is tracked to closure.

When are calls held across the time difference?

Meetings are booked at the start or end of your US business day, and the issue log keeps moving overnight while you sleep.

Can the schedule change after kickoff?

Yes. A change to sequence or delivery dates is logged, its effect on fabrication and shipping is sent to you in writing, and the shop re-sequences once you agree.

Keep reading

Next in how we work

World Steel designs, fabricates and supplies the steel structure. You, the US contractor and our customer, erect it, and with your Engineer of Record approve the drawings and handle the PE seal and the permit.

Meet the project manager before you sign

Send your package and target site date. A project manager walks you through the baseline schedule, the reporting rhythm and the scope split for your job.