Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Drainage & weather protection

Where every drop goes, planned on the drawings

Gutters, downspouts, flashings and canopies sized to the roof shape and to local rain and snow. They come off the same lines that fabricate 2,500 t of structural steel a month, for roofs as big as the 56,000 m² Long Son petrochemical complex.

Water path by roof shape

Roof shape
ROOF → GUTTER → DOWNSPOUT

Two planes shed to eave gutters on both sides.

ROOF → GUTTER → DOWNSPOUT

One plane drains to a single high-capacity gutter at the low eave.

ROOF → GUTTER → DOWNSPOUT

Valley gutters between gables need overflow paths so a blocked outlet does not flood the roof.

Sized for your county’s rain

Four things that decide a drainage system

Rainfall intensity

Gutter and downspout sizes are calculated by the project engineer from the local rainfall intensity in the plumbing code.

Overflow paths

Valley and internal gutters get overflows or scuppers so a blocked outlet cannot pond water on the roof.

Snow and ice

In cold regions roof pitch, snow retention and ice dams are planned with the gutters.

Canopies

Canopies and entrance covers attract high uplift and drifting snow, so they are designed with the main structure.

Big roofs, long gutter runs

Drained from the eave down

Roofs on some of our largest jobs, where long runs and multi-gable valleys make drainage part of the structural design. Tap a photo to open it full size.

Aerial view of the Long Son petrochemical complex steel buildings Photo
Aerial view of the multi-gable roof of the CPV Food factory Photo
Large roof of a steel process building at Long Son Photo

Projects outside the US, shown for their roofs; they are not US sites.

US codes

How we engineer drainage

Roof geometry
Gable, single-slope and multi-gable roofs shed water differently. Valley gutters between gables need overflow paths.
Rainfall management
Gutter and downspout sizes are calculated by the project engineer from local rainfall intensity in the plumbing code.
Canopies
Canopies and entrance covers attract high uplift and drifting snow, so they are designed with the main structure.
Aerial view of a large warehouse roof and its drainage lines by World Steel

Large-project capacity

Roofs and gutters for the largest jobs

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

ProjectSectorWhereStructural steel
Sunpro Steel FactorySteel industryCan Tho City, Vietnam · 20245,000 t
CPV Food Processing FactoryFood processingDong Nai Province, Vietnam · 20202,500 t
Long Son petrochemicalOil and gasBa Ria–Vung Tau, Vietnam · 20222,000 t
M&D warehouse, ThailandWarehouse and industrialThailand · 20242,000 t
Tongwei feed factory, phase 1Animal feedDong Thap Province, Vietnam · 20181,500 t
New Era cold storage, phase 1Cold storage, phase 1 tonnageTay Ninh Province, Vietnam1,000 t

In the catalog

Drainage and weather items in the catalog

Drawn illustration of drainage & weather protection, standing in for a photo of this product Illustration

Gutters

Formed steel eave and valley gutters sized to collect the roof runoff your local rainfall produces. Made by World Steel in Vietnam Verified
Drawn illustration of drainage & weather protection, standing in for a photo of this product Illustration

Downspouts

Vertical pipes that carry gutter water down the wall to the ground or the storm system. Made by World Steel in Vietnam Verified
Drawn illustration of drainage & weather protection, standing in for a photo of this product Illustration

Flashings

Formed steel trims that seal joints between roof, wall and accessory surfaces. Made by World Steel in Vietnam Verified
Drawn illustration of drainage & weather protection, standing in for a photo of this product Illustration

Ridge Closures

Foam or metal closures that fill the gaps between panel ribs at ridges and eaves. Made by World Steel in Vietnam Verified
Drawn illustration of drainage & weather protection, standing in for a photo of this product Illustration

Eave Trims

Formed trims that finish and seal the edge of the roof along the eave. Made by World Steel in Vietnam Verified
Drawn illustration of drainage & weather protection, standing in for a photo of this product Illustration

Rainwater Accessories

Outlets, strainers, end caps and fittings that complete the gutter and downspout system. Made by World Steel in Vietnam Verified
Drawn illustration of drainage & weather protection, standing in for a photo of this product Illustration

Canopies

Steel canopies and fascias that project from the building to shelter doors, walks or work areas. Made by World Steel in Vietnam Verified
Drawn illustration of drainage & weather protection, standing in for a photo of this product Illustration

Entrance Covers

Covered entries that keep rain and snow off people at the front door. Made by World Steel in Vietnam Verified
Drawn illustration of drainage & weather protection, standing in for a photo of this product Illustration

Loading Dock Canopies

Canopies over truck docks that shelter loading and unloading. Made by World Steel in Vietnam Verified
Drawn illustration of drainage & weather protection, standing in for a photo of this product Illustration

Waterproofing Interface Components

Membranes and tapes that seal where the steel building meets concrete, masonry or another structure. Made by World Steel in Vietnam Verified

Where it meets the other systems

Roofing System

Gutters and flashings fix along the eaves, the ridge and any valleys.

Design limit: Gutter size follows the design rainfall rate, and every valley or parapet gutter needs a way for overflow to escape. · What gets checked: Run water through the gutters and downspouts to confirm flow.

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Gutters, downspouts, flashings, closures and trims made in our plant
  • Canopies, entrance covers and loading-dock canopies designed with the main frame
  • Shop drawings for every gutter run, outlet and flashing, at no extra cost

The US contractor, our customer

  • Gutter and downspout sizing confirmed by the project engineer to the local plumbing code
  • Underground storm drainage and site grading, by others
  • Installation at site and owner cleaning of gutters and outlets

Questions from US contractors

Drainage questions and answers

6 answers, grouped by topic.

Sizing 2 answers

Who sizes the gutters and downspouts?

The project engineer calculates them from the local rainfall intensity in the plumbing code. We fabricate them to that design and draw every run and outlet.

Why do valley gutters need overflows?

A valley between two gables collects water from both roofs. If an outlet blocks, an overflow or scupper stops water ponding and loading the roof.

Snow and canopies 2 answers

How is snow handled at the eaves?

Roof pitch, snow retention and ice dams are planned with the gutters in cold regions, so sliding snow does not tear gutters off or block outlets.

Are canopies designed separately from the building?

No. Canopies and entrance covers catch high uplift and drifting snow, so we design them with the main structure.

Scope and scale 2 answers

Is underground storm drainage included?

No. Underground storm drainage and site grading are by others. Our scope ends at the downspout outlet.

Can you supply drainage for a very large roof?

Yes. Gutters and flashings come from the same plant that fabricates 2,500 t of structural steel a month, and they ship with the roof they belong to.

Keep reading

Related pages

Price it or partner with us

Send the roof plan.

We draw every gutter run, valley, outlet and flashing, and fabricate them to the sizes your project engineer sets.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Have this system engineered for your site

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details