Plant output
2,500 t / month
About 2,750 short tons of structural steel, IAS AC472 plant in Vietnam
Where jobs get stuck
What architects tell us goes wrong
- Design intent lost to budgetValue engineering by subtraction strips the features that made the design.
- Envelope decided by the supplierProfiles and trims picked from a catalog, not from your drawings.
- Coordination by PDFNo model to check structure against architecture.
What changes with World Steel
How we take those problems off your desk
- Envelope chosen with youPanel profiles, trims and colors coordinated with your elevations.
- Architectural steelCanopies, curved roofs, exposed frames and feature steel.
- BIM and IFC modelsModels for coordination and clash detection.
- Savings that keep the designSteel saved in the frame, not in the features.
Envelope palette
An envelope palette to design with
Finishes and details we coordinate with your drawings. Exact colors are matched to your specification.
An envelope palette to design with
- Trapezoidal ribRoofs and walls, long spans
- Standing seamLow-slope roofs, concealed fixing
- Flat and micro-ribClean walls and fascias
- Insulated panelCold rooms and high-performance walls
Colors, matched to your specification
- Navy
- Red
- Light grey
- Slate
- White
- Charcoal
Architectural steel
- Canopies and porte-cochères
- Curved and barrel roofs
- Exposed steel frames
- Large glazed openings
Request a quotation · Architects
Send us your next steel package
Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.
Become our partner in the US
Practices that design several steel buildings a year get help writing performance specifications and an engineering contact for early questions.
See the Contractor Partnership ProgramYour scope, mapped
Systems, guides and services that come up in your work
The parts of World Steel that architects use most, each with its own page to read before you call.
Ecosystem for Architects
Photo
Photo
Photo
Photo
Engineering guides
- Energy Code Building EnvelopesRoofs and walls that pass the IECC
- Complete Building SolutionsFrame, envelope and openings engineered as one US-code building.
- Snow Load Steel BuildingsGround snow, drift and sliding snow, designed in
How we work
- Design processEight steps from your RFQ to released shop drawings, with an approval gate before any steel is cut.
- PEB Studio trackingYour own login to follow fabrication, inspections, packing and shipping of your structure in real time.
Buildings to look at
- North West Community CenterUnited States · 2023
3D model
- Goldfields Arts CentreAustralia
Photo
- Whaleback Golf ClubAustralia
3D model
- IAS AC472 — Metal Building Systems
- EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
- EN 1090 EXC3 (CE marking) 2797 CPR 827443
- AS/NZS 5131 CC3 BMP 827566
How mill certificates and inspection records reach your inspector
Questions
What architects ask us first
Still have one? Ask it in the quote form and an engineer answers in writing.
Can a metal building match our elevation?
In most cases, yes. The frame is engineered to your geometry, and panel profiles, trims and openings are coordinated with your drawings before fabrication.
Do you provide BIM models?
Yes. We detail in Tekla Structures and share IFC models for coordination and clash detection.
Can you supply curved roofs and canopies?
Yes. Curved roofs, canopies and exposed architectural steel are part of what we fabricate.
Who is the Engineer of Record?
The project’s structural engineer. World Steel prepares calculations and drawings for that engineer’s review and approval.
Can you help write the specification?
Yes. We can review a performance specification for steel and metal envelope packages so it is clear and biddable.
Where is the steel made?
In World Steel’s own plant in Vietnam, then shipped to the US.
State guides
Code editions, local amendments and design loads differ by state. Check the guide for your project location.
All state guides →World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).
Ready to price your next steel package?
Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.
