Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Caribbean and CARICOM

Structural steel for large Caribbean and CARICOM projects

From the Bahamas to Guyana, island and coastal projects ask a lot of steel: hurricane wind, earthquakes, salt air and a long sea route to the site. World Steel designs and fabricates structural steel for them in its own plant in Vietnam, 2,500 t a month, and ships it packed in erection order to your port. One order covers design, drawings, fabrication, coating, inspection, packing and shipping, FOB Vietnam or CIF to your port, tracked live in PEB Studio. Each country has its own solutions page, guides and a page for every parish, region or municipality.

Large-project capacityIAS AC472

2,500 t

of structural steel a month from our own plant in Vietnam, shipped to Caribbean ports

Light gray warehouse roof beside process plants, seen from above
Drone view of a World Steel warehouse on an overseas industrial site.

Buy it all in one place

One desk controls your whole steel package, fast

A Caribbean project usually juggles a designer, a detailer, a fabricator, a painter, an inspector and a forwarder on three continents. With World Steel it is one order: we design, draw, fabricate, coat, inspect, pack and ship from our own plant in Vietnam, and you watch every step live.

One contract

Design, drawings, steel, coating, inspection, packing and shipping under one order, not five suppliers.

One project manager

An English-speaking project manager who answers for every step, from the first drawing to the port.

One design basis

Code, wind, seismic and exposure values agreed with your engineer of record and printed on sheet one.

One live link

PEB Studio shows every piece from cutting to the ship, so you plan crane days on facts.

One number

Hotline and WhatsApp to the same team, at an hour that suits your island.

Two clear terms

FOB Vietnam, or CIF to your port with sea freight and insurance arranged by us.

FOB Vietnam portCIF your Caribbean port

Your package, step by stepTracked in PEB Studio

  1. Design and design reportWorld Steel

    Steel designed or checked to the basis your engineer of record sets: hurricane wind, earthquakes, salt air.

    Design report explained →
  2. Shop and erection drawingsWorld Steel

    Tekla shop drawings and erection drawings for every project, at no extra cost.

    Steel building design →
  3. Materials and certificatesWorld Steel

    Plate and sections from named mills, with mill test certificates traced to each piece.

    Mill test certificates →
  4. FabricationWorld Steel

    Laser cutting up to 100 mm thick, welding to qualified procedures, 2,500 t a month in our own plant.

    Inside the plant →
  5. Coating and galvanizingWorld Steel

    Blasting, paint systems from brands sold in the Caribbean, hot-dip galvanizing or duplex where the exposure needs it.

    Hot-dip galvanizing →
  6. Quality controlWorld Steel

    An inspection and test plan agreed per project, materials tested at ILAC-accredited labs, records in the handover file.

    Quality hub →
  7. Packing in erection orderWorld Steel

    Bundles follow the erection sequence, every piece marked, packing lists by container.

    Jobsite delivery →
  8. Shipping FOB or CIFWorld Steel

    FOB Vietnam, or CIF to your Caribbean port. Sailings are confirmed at booking.

    Caribbean ports and routes →
  9. Your contractor erectsYour contractor

    The local contractor, our customer, clears the cargo, takes it to site and erects it from our drawings, with the engineer of record approving and sealing as local rules require.

    Partnership →

Production, quality records and each piece’s digital passport, open to your team from day one.

See PEB Studio

The World Steel ecosystem

Every product and solution a Caribbean project needs, from one plant

Frames and members, complete buildings, engineering for island loads, coatings, quality and documents. Pick what your project needs; it all comes from the same plant, the same team and the same order.

One plant in Vietnam Seaside industrial site with a steel warehouse at its center, wide drone shot
2,500 t

of structural steel a month, IAS AC472 accredited, shipped to every Caribbean port

Inside the plant →

Structural steel and members

Frames, built-up members and multi-storey steel for buildings of any size.

Complete building packages

Whole buildings, frame to roof and wall cladding, packed as one shipment.

Solutions for island loads

Engineering groups written for hurricanes, earthquakes, salt air and remote sites.

Coating, quality and documents

What protects the steel and proves it: coatings, inspection, accreditation and sample files.

Country solutions

A full solutions set for each country

Every country page has its own look, six in-depth guides and a steel page for each parish, region or municipality. More countries are being added.

The Caribbean basin

Twenty-six places, one sea, one plant behind them

The fifteen CARICOM member states, the five associate members and the neighboring islands that share the same storms and shipping lanes. Countries with a solutions page are marked in their own colour; tap one to open it.

Solutions page liveIn the planOther countries

CARICOM member states

The fifteen full members of the Caribbean Community.

CARICOM associate members

Overseas territories in the Community as associate members.

Neighboring Caribbean markets

Islands outside CARICOM that share the same sea, storms and shipping lanes.

Already on Caribbean sites

What we have made for Guyana

Designed and fabricated in our plant in Vietnam, shipped to Georgetown and erected by the local contractor, our customer.

18

pedestrian bridges

6

warehouses

2

maintenance workshops

1

office building

1

mosque

Plus a multi-storey residential design for a waterfront site in Antigua and Barbuda.

Painted welded plate girder with drilled end plate for the Guyana Mosque in the World Steel plant Photo
Guyana Mosque18 m × 21 m (59 ft × 69 ft), two floors, plate girders up to 1.5 m (4.9 ft) deep
Long welded bridge chords for the Guyana footbridges on the World Steel shop floor Photo
18 Guyana footbridgesEnclosed box-truss pairs, spans 26 m to 47.5 m (85 ft to 156 ft)
3D model of the Guyana Warehouse with a two-storey brick office front 3D model
Guyana WarehousePre-engineered steel warehouse with office front
3D model of the Guyana Warehouse 2 steel frame during erection 3D model
Guyana Warehouse 2Second warehouse for Guyana the same year

In-depth Caribbean platforms

Platforms built only for Caribbean projects

Beyond the 26 country pages: engineering for hurricanes and salt air, the sea route to every port, a shipping simulator, a contact page for each country, a partnership for local contractors and the projects we have already made for the region.

Why World Steel

What a large Caribbean project gets from World Steel

Capacity for the big jobs

2,500 t a month from one plant, released area by area so a port, plant or resort does not wait.

Large-project program →

Accredited plant

The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year.

IAS AC472 accreditation →

Drawings included

Design or detailing, Tekla shop drawings and erection drawings at no extra cost.

Shop drawings →

Island loads

Hurricane wind, earthquakes, soft coastal soils and flood levels taken into the design basis.

Hurricane coast steel buildings →

Salt-air coatings

Paint systems and galvanizing chosen for the exposure, with brands you can buy locally for touch-up.

Coastal corrosion protection →

Live tracking

Every package followed in PEB Studio from cutting to your port, so the site plans its crane days.

PEB Studio →

Hurricanes, salt air, earthquakes

The in-depth guides to Caribbean storms and salt air

Eight guides on what every island shares: hurricane wind and uplift, C5 and CX salt air, galvanizing and duplex coatings, coastal details, earthquakes, rebuild programs and storm care.

All Caribbean hurricane and marine guides

Seeking Caribbean contractor partners

Caribbean contractors: you win the job, we fabricate the steel

We do not erect and we do not compete with you. You win the project and run the site; we design, detail, fabricate and ship the steel and back your bid with drawings, capacity and live tracking. Win-win, job after job, island after island.

Q&A

Caribbean questions we hear most

Which Caribbean countries do you supply?

We supply structural steel to projects across the Caribbean and CARICOM. Each country gets its own solutions page as we build them out, now twenty-six countries from Belize, the Bahamas, Puerto Rico and the Dominican Republic to Bermuda, Sint Maarten, Aruba, Curaçao, Guyana and Trinidad and Tobago. If your country does not have a page yet, send the project anyway.

Have you supplied steel to the Caribbean before?

Yes. For Guyana we have fabricated 18 steel pedestrian bridges, 6 warehouses, 2 large maintenance workshops, an office building and the steel structure of a mosque, all in our plant in Vietnam. We have also designed a multi-storey residential building for Antigua and Barbuda.

Do you erect the steel?

No. World Steel supplies the steel structure only. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.

Which codes do you design to?

The code basis your engineer of record sets for the country, often the IBC and ASCE 7 or a national code with local wind and seismic values, with AISC 360 and AISC 341 for the steel. We hold no local approval or licence; the engineer of record approves the design.

How large a package can you take?

Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.

How does the steel reach the island?

By sea from Vietnam to the country’s main port, packed in erection order with packing lists by container. The contractor takes it from the port to site.

On what terms do you supply Caribbean projects?

Two terms: FOB Vietnam, where your forwarder takes the cargo at our loading port, or CIF to your Caribbean port, where we arrange the sea freight and the cargo insurance to that port. Import clearance, duties and the trip from the port to site stay with the buyer or the contractor.

What do I get by buying everything from World Steel?

One contract and one project manager for design, shop and erection drawings, fabrication, coating or galvanizing, quality control, packing in erection order and shipping. Every piece is tracked live in PEB Studio, so you see production and quality records without chasing five suppliers.

Which products and solutions can you supply for the Caribbean?

Steel frame systems, built-up members, multi-storey steel framing, long-span and crane-supporting structures, 18 complete building packages from warehouses and cold stores to hangars and churches, pedestrian bridges, mining structures, and coating systems including hot-dip galvanizing and duplex, all designed for hurricane wind, earthquakes and salt air.

Honest status. World Steel designs and fabricates to the code basis the engineer of record sets in each country. We hold no local approval, licence or registration in any Caribbean country and do not apply for permits. We supply the steel structure only; erection and site work are the contractor’s.

Keep reading

Building in the Caribbean?

Send the drawings or the country, site, size and use. We set the design basis with your engineer of record, design or detail the steel for hurricane wind, earthquakes and salt air, and quote it made in our plant in Vietnam, packed in erection order and shipped to your port.