Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Inspector walking a line of painted built-up members on the shop floor

Final look at coated members before they are released to packing, World Steel plant in Vietnam.

Primary US focus

Reshoring · Plant expansions · Fabrication shops

Industrial & Manufacturing

Plant frames sized for cranes, process lines and the next phase. Plants, shops and maintenance buildings with cranes and mezzanines.

Cranes
Runways designed into the first model
Floors
Process and office mezzanines
Growth
Expandable end walls for phase two
Design basis
IBC 2024 · ASCE 7-22 · AISC 360
Typical sectionIllustrative
Illustrative section of a industrial & manufacturing steel buildingSpan 30 m (98 ft)Crane rail 8 m (26 ft)Crane runway beamsCrane-supporting columnsOffice mezzanineEquipment platforms

Illustrative plant section with a top-running crane, not a design. Crane class and loads come from your crane supplier.

Follow the crane load

From the hook to the foundation, one continuous load path

An overhead crane is the hardest-working part of a plant. We design every link that carries its load, fabricate them together in our IAS AC472-accredited plant and ship them as a set.

  1. The load on the hook

    Crane class, capacity and wheel loads come from your crane supplier and go into the analysis on day one.

  2. Runway beams

    Built-up runway girders are sized for fatigue and deflection, with rail clips and stops detailed.

    Learn more →
  3. Brackets and stepped columns

    Crane brackets or stepped columns carry the runway into the main frame without overloading the rafters.

    Learn more →
  4. Frame and bracing

    Longitudinal crane forces are taken by bracing in solid bays, kept clear of doors and equipment.

    Learn more →
  5. Base plates and anchor rods

    Anchorage is designed for the combined crane, wind and seismic forces your Engineer of Record confirms.

    Learn more →

In the US market

Reshoring, new supply-chain investment and plant expansions are driving demand for production space across the Midwest, the South and the Mountain West. Owners often plan phase two before phase one is finished.

What the building needs

Frames that carry overhead cranes, mezzanines and roof-mounted equipment, door openings sized for forklifts and trucks, and an envelope that meets the IECC for the climate zone while handling process heat.

How World Steel helps

Crane runway loads, future end-wall expansion and equipment supports are built into the analysis model from day one, so a later extension bolts onto a frame designed to receive it.

Made in our Vietnam plant

What we supply

Products · Steel buildings

Building types and the frames behind them

Each type starts from a building package we already make in Vietnam, then gets engineered for your site, your codes and your layout.

All steel buildings →
Tall lattice columns of a crane-served industrial building during erection Photo

Manufacturing plant

Multi-span built-up frame

Starts from: Manufacturing Plants with Crane Bays

Tall lattice columns of a crane-served industrial building during erection Photo

Fabrication shop

Rigid frame with a top-running crane runway

Starts from: Manufacturing Plants with Crane Bays

Open floor of a clear-span warehouse with no interior columns Photo

Maintenance shop

Clear-span frame with drive-through doors

Starts from: Carport & Canopy Structures

Factory frame by World Steel under erection, photographed by drone Photo

Heavy equipment building

Heavy built-up frame carrying equipment decks

Starts from: Workshop Buildings with Office

Warehouse frame from above, purlins and girts fixed to the rafters and columns Photo

Building packages

Planned steel building packages for the building types US owners ask for most.

See packages →
Top-down drone shot of an open steel warehouse frame Photo

Building Package Builder

Pick a use and rough dimensions to draft a scope you can send with your quote request.

Build a package →

Engineering

Engineered for US codes, your site and this use

Our engineers design to the code edition your jurisdiction has adopted, and deliver calculations and drawings ready for your Engineer of Record to review and approve.

Questions your engineer will raise

  • Crane classes, collateral loads for process piping and future bays go into the first analysis model, not a later revision.

  • Drive-through and equipment doors are framed with the bracing relocated to solid bays.

  • Insulation, condensation control and ventilation are set from the process heat and the IECC climate zone.

Your Engineer of Record sets the design values, and your local building department decides which code edition and amendments apply.

IBC 2024ASCE 7-22AISC 360AISI S100AWS D1.1AWS D1.3

Site conditions to review

IAS AC472 accreditedWorld Steel is the first and only steel building plant in Vietnam accredited to IAS AC472 for design and fabrication inspection.

Solutions · End to end

From our plant in Vietnam to your site in the US

One partner carries your industrial & manufacturing building from the first calculation to the last container. Westminster, California is our US office; every member is made in Vietnam.

  1. Engineered to US codes

    Designed to IBC 2024 and ASCE 7-22, with drawings ready for your engineer’s review and approval.

    Steel building design →
  2. Made in our Vietnam plant

    Cut, welded and coated in World Steel’s own IAS AC472-accredited plant, from steel rolled mainly in Vietnam and ordered to US grades.

    Inside the plant →
  3. Tracked live in PEB Studio

    Watch each of your members move through fabrication and QC release, in real time.

    PEB Studio →
  4. Shipped to a US port

    Packed by erection sequence and shipped to West, Gulf or East Coast ports, then trucked to site.

    Vietnam to USA →
  5. Erected by your team

    Piece marks, erection drawings and packing lists let your erector start straight away.

    How we work →

PEB Studio

Watch your building being made, in real time

Log in to PEB Studio and follow every column, rafter and purlin of your project through cutting, welding, coating and QC release at our Vietnam plant. Your team plans erection around real progress, not promises.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data
Live production status

The Industrial & Manufacturing ecosystem

Everything that connects to your building

Products you can buy, solutions that deliver them, the states we ship to and the people we work with. Each link opens its own page.

State guides

Where US industrial & manufacturing projects are growing

Texas Manufacturing and fabrication shops New plants and shop expansions need crane runways, mezzanines and tall eaves engineered into the frame from day one. California Manufacturing and shops Fabrication, repair and light manufacturing buildings need cranes and mezzanines designed for seismic loads. Georgia New manufacturing plants Automotive, battery and component suppliers are building across the state, often with crane bays. North Carolina Piedmont manufacturing Plants in the Triad, Charlotte region and Research Triangle need crane bays, mezzanines and expansion room. Ohio Manufacturing and suppliers Automotive, metals and component suppliers need crane bays and expansion room. Alabama Automotive and aerospace suppliers Supplier plants around Huntsville, Tuscaloosa, Montgomery and Lincoln need tall eaves, crane bays and room to add lines. Arkansas Steel country in the Delta Mills and service centers around Osceola and Blytheville draw supplier and maintenance buildings with crane loads. Connecticut Precision and aerospace manufacturing Machine shops and component makers along the Connecticut River valley expand with tall, column-free bays. Delaware Chemical and light industry Process and maintenance buildings around Wilmington need corrosion-aware coatings and crane support. Idaho Shops and light industry Contractors and manufacturers use steel shops with crane rails and offices. Illinois Equipment and machinery makers Illinois manufacturers expand with crane bays and tall shops. Indiana RV, auto and steel plants Elkhart County RV makers, auto suppliers and northwest Indiana steel operations need tall bays and cranes. Iowa Farm equipment and machinery Equipment makers and suppliers in the Quad Cities, Waterloo and Ankeny need assembly bays with cranes. Kentucky Auto and battery plants Assembly and supplier plants around Georgetown, Louisville and Bowling Green need crane bays and tall eaves. Maine Mills and wood products Forest products plants and mills add storage and process buildings with crane support. Michigan Auto, EV and battery suppliers Supplier plants around Detroit, Lansing and Grand Rapids need tall eaves, cranes and expansion room. Minnesota Medical devices and machinery Manufacturers add production and storage buildings near their existing plants. Mississippi Auto and supplier plants Assembly plants near Canton and Blue Springs anchor supplier buildings across central and north Mississippi. Missouri Auto and aerospace suppliers Supplier plants near Wentzville, Claycomo and the St. Louis area need tall bays and cranes. Montana Contractor and resource shops Construction, mining and energy companies need heated shops with crane rails. New Hampshire Precision manufacturing Plants in the Merrimack Valley and the Seacoast add production and storage buildings. New Jersey Light industry and port services Manufacturers and port service companies need shops, storage and crane bays. New York Semiconductor supply chain Suppliers around the new chip fabs near Syracuse and Albany need warehouses and light industrial buildings. Oregon Wood products and mills Mills and wood products plants need covered storage and crane buildings. Pennsylvania Manufacturing and steel country Western Pennsylvania plants add crane bays and storage buildings. Rhode Island Light industry Manufacturers add production and storage buildings near Providence. South Carolina Auto, aerospace and tires Upstate and Lowcountry plants and their suppliers need crane bays and tall eaves. Tennessee Auto, EV and battery plants Assembly and supplier plants in Middle and West Tennessee need tall bays and cranes. Vermont Specialty manufacturing Manufacturers near Burlington and in the valleys add production and storage space. West Virginia Chemicals and manufacturing Kanawha Valley and Ohio River plants add process support and storage buildings. Wisconsin Machinery and paper Manufacturers in Milwaukee, the Fox Valley and beyond add crane bays and storage.

Questions and answers

Industrial & Manufacturing: what US contractors ask us

16 straight answers on design, fabrication in our Vietnam plant, shipping and who does what on your project.

Plant layout and loads 4 answers

Can you add a crane to a building later?

Only if the frame was designed for it. That is why we ask about cranes, future bays and process loads at the start, so the steel you buy today can take them tomorrow.

How do you handle heavy process equipment?

Equipment weights, vibration and access needs go into the analysis model early. Platforms, equipment supports and roof openings are designed with the frame rather than added in the field.

Can the plant be designed for future expansion?

Yes. End walls and side walls can be designed as expandable frames, and crane runways can be detailed to extend into new bays when production grows.

Can you frame a high-bay with a low-bay office?

Yes. Mixed heights, lean-tos, mezzanine offices and production halls are combined in one model, so the connections between them are designed rather than improvised.

Cranes and heavy steel 4 answers

Do you supply the crane itself?

Yes, on request. World Steel can supply the overhead crane with the steel, designed to CMAA 70 or 74, so wheel loads and clearances are set in one design. If you buy the crane elsewhere, we design the runway to that supplier’s data. Installation, commissioning and the load test are site scope.

Can you fabricate heavy built-up sections?

Yes. Built-up columns, girders and crane beams are welded from plate in our plant, sized to the forces rather than to the nearest rolled shape, which often saves steel on heavy frames.

Which welding code applies?

Structural welding follows AWS D1.1, and AWS D1.8 applies to seismic force-resisting systems where your design calls for it. Our shop holds qualified procedures and welders for both.

Can you meet tight tolerances for crane runways?

Runway beams are fabricated and checked to the tolerances the crane manufacturer and your specification set, and dimensional checks are recorded in the quality file.

Capacity, quality and tracking 4 answers

How large a plant can World Steel supply?

World Steel fabricates up to 2,500 metric tons (2,756 short tons) of structural steel a month. Sunpro Steel, at around 5,000 metric tons, is one of our largest industrial projects.

How do I follow fabrication of a large plant?

Through PEB Studio. Your team sees each member move through cutting, welding, coating and QC release in our Vietnam plant, and can plan erection around real progress.

What mill documents come with the steel?

Mill certificates traced to heat numbers. Vietnamese plate mills can supply EN 10204 3.1 certificates with Charpy impact values on request when your specification needs toughness data.

Is your quality program independently checked?

Yes. World Steel is the first and only fabricator in Vietnam accredited under IAS AC472, held since 2019 and audited twice a year.

Scope and ordering 4 answers

Does World Steel install the plant steel?

No. We design, fabricate and supply. Erection, crane installation and site work are the scope of the US contractor, our customer.

Who stamps the plant drawings?

Your Engineer of Record reviews and approves our calculations and drawings; the PE seal and building permit stay with your US team.

What information starts a plant proposal?

Building size and heights, crane capacities and spans, process loads, future phases and the site address. A layout sketch from your process engineer is enough to begin.

Are shop drawings part of the supply?

Yes, for every project and at no extra cost. Your team reviews them before we cut steel.

Ready to scope your plant project?

Send a footprint, a sketch or a full drawing set. An engineer checks it against US code requirements and replies with exactly what World Steel would make in Vietnam and ship to your port.