In the US market
Reshoring, new supply-chain investment and plant expansions are driving demand for production space across the Midwest, the South and the Mountain West. Owners often plan phase two before phase one is finished.
Follow the crane load
An overhead crane is the hardest-working part of a plant. We design every link that carries its load, fabricate them together in our IAS AC472-accredited plant and ship them as a set.
Crane class, capacity and wheel loads come from your crane supplier and go into the analysis on day one.
Built-up runway girders are sized for fatigue and deflection, with rail clips and stops detailed.
Learn more →Crane brackets or stepped columns carry the runway into the main frame without overloading the rafters.
Learn more →Longitudinal crane forces are taken by bracing in solid bays, kept clear of doors and equipment.
Learn more →Anchorage is designed for the combined crane, wind and seismic forces your Engineer of Record confirms.
Learn more →Reshoring, new supply-chain investment and plant expansions are driving demand for production space across the Midwest, the South and the Mountain West. Owners often plan phase two before phase one is finished.
Frames that carry overhead cranes, mezzanines and roof-mounted equipment, door openings sized for forklifts and trucks, and an envelope that meets the IECC for the climate zone while handling process heat.
Crane runway loads, future end-wall expansion and equipment supports are built into the analysis model from day one, so a later extension bolts onto a frame designed to receive it.
What you can build
Made in our Vietnam plant
Products · Steel buildings
Each type starts from a building package we already make in Vietnam, then gets engineered for your site, your codes and your layout.
Photo
Photo
Rigid frame with a top-running crane runway
Starts from: Manufacturing Plants with Crane Bays
Photo
Photo
Heavy built-up frame carrying equipment decks
Starts from: Workshop Buildings with Office
Photo
Building packages
Planned steel building packages for the building types US owners ask for most.
See packages →
Photo
Building Package Builder
Pick a use and rough dimensions to draft a scope you can send with your quote request.
Build a package →Engineering
Our engineers design to the code edition your jurisdiction has adopted, and deliver calculations and drawings ready for your Engineer of Record to review and approve.
Crane classes, collateral loads for process piping and future bays go into the first analysis model, not a later revision.
Drive-through and equipment doors are framed with the bracing relocated to solid bays.
Insulation, condensation control and ventilation are set from the process heat and the IECC climate zone.
Your Engineer of Record sets the design values, and your local building department decides which code edition and amendments apply.
Solutions · End to end
One partner carries your industrial & manufacturing building from the first calculation to the last container. Westminster, California is our US office; every member is made in Vietnam.
Designed to IBC 2024 and ASCE 7-22, with drawings ready for your engineer’s review and approval.
Steel building design →Cut, welded and coated in World Steel’s own IAS AC472-accredited plant, from steel rolled mainly in Vietnam and ordered to US grades.
Inside the plant →Watch each of your members move through fabrication and QC release, in real time.
PEB Studio →Packed by erection sequence and shipped to West, Gulf or East Coast ports, then trucked to site.
Vietnam to USA →Piece marks, erection drawings and packing lists let your erector start straight away.
How we work →PEB Studio
Log in to PEB Studio and follow every column, rafter and purlin of your project through cutting, welding, coating and QC release at our Vietnam plant. Your team plans erection around real progress, not promises.
Demonstration data
The Industrial & Manufacturing ecosystem
Products you can buy, solutions that deliver them, the states we ship to and the people we work with. Each link opens its own page.
ProductsSteel buildings
ProductsBuilding systems
ProductsComponents
+9 more · View all →How we workSolutions
How we helpServices
State guides
Projects
Comparable building types from our portfolio, with US work, including the US territory of Guam, shown first.
Questions and answers
16 straight answers on design, fabrication in our Vietnam plant, shipping and who does what on your project.
Only if the frame was designed for it. That is why we ask about cranes, future bays and process loads at the start, so the steel you buy today can take them tomorrow.
Equipment weights, vibration and access needs go into the analysis model early. Platforms, equipment supports and roof openings are designed with the frame rather than added in the field.
Yes. End walls and side walls can be designed as expandable frames, and crane runways can be detailed to extend into new bays when production grows.
Yes. Mixed heights, lean-tos, mezzanine offices and production halls are combined in one model, so the connections between them are designed rather than improvised.
Yes, on request. World Steel can supply the overhead crane with the steel, designed to CMAA 70 or 74, so wheel loads and clearances are set in one design. If you buy the crane elsewhere, we design the runway to that supplier’s data. Installation, commissioning and the load test are site scope.
Yes. Built-up columns, girders and crane beams are welded from plate in our plant, sized to the forces rather than to the nearest rolled shape, which often saves steel on heavy frames.
Structural welding follows AWS D1.1, and AWS D1.8 applies to seismic force-resisting systems where your design calls for it. Our shop holds qualified procedures and welders for both.
Runway beams are fabricated and checked to the tolerances the crane manufacturer and your specification set, and dimensional checks are recorded in the quality file.
World Steel fabricates up to 2,500 metric tons (2,756 short tons) of structural steel a month. Sunpro Steel, at around 5,000 metric tons, is one of our largest industrial projects.
Through PEB Studio. Your team sees each member move through cutting, welding, coating and QC release in our Vietnam plant, and can plan erection around real progress.
Mill certificates traced to heat numbers. Vietnamese plate mills can supply EN 10204 3.1 certificates with Charpy impact values on request when your specification needs toughness data.
Yes. World Steel is the first and only fabricator in Vietnam accredited under IAS AC472, held since 2019 and audited twice a year.
No. We design, fabricate and supply. Erection, crane installation and site work are the scope of the US contractor, our customer.
Your Engineer of Record reviews and approves our calculations and drawings; the PE seal and building permit stay with your US team.
Building size and heights, crane capacities and spans, process loads, future phases and the site address. A layout sketch from your process engineer is enough to begin.
Yes, for every project and at no extra cost. Your team reviews them before we cut steel.
Neighboring industries
Covered in our state guides
Send a footprint, a sketch or a full drawing set. An engineer checks it against US code requirements and replies with exactly what World Steel would make in Vietnam and ship to your port.