Missouri · Aerospace
Structural steel for St. Louis aerospace and advanced plants
St. Louis has built aircraft for a century, and aerospace suppliers, life sciences and advanced manufacturing plants surround the airport and St. Charles County. These buildings need column-free halls, crane bays, very large door openings and stiff floors, and in the St. Louis area the steel is also checked for New Madrid seismic demand.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by port and rail to your Missouri site.
- Clusters
- St. Louis County, St. Charles
- Buildings
- Assembly halls, labs, plants
- Key need
- Long spans, big doors
- Also checked
- New Madrid seismic
Why it matters
Big spans on soft river soils
An assembly hall needs wide column-free floors and a door that opens most of one wall. The truss or girder over that door carries the roof and the wind, and on St. Louis soils the frame must also resist seismic loads.
We design long-span trusses and door girders, crane runways for overhead cranes and the seismic bracing for the site category, and fabricate the large members as built-up sections in our plant.
What we design and fabricate
Steel for aerospace and advanced plants
Long-span roofs
Trusses and girders for column-free halls.
Door girders
Framing for hangar and assembly doors.
Crane bays
Runways for overhead cranes.
Seismic bracing
Bracing detailed for the St. Louis site category.
Who does what
Aerospace steel, split clearly
World Steel supplies
- Long-span frame and truss design or detailing
- Door girders and crane runways
- Seismic detailing where the category calls for it
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Hangar door supply and crane installation
- Fire protection design
- Engineer of Record approval and PE seal
- Local permit and inspections
- Erection and site work
Missouri
What we do not claim
World Steel names no aircraft maker, aerospace supplier or life sciences company as a customer and claims no completed Missouri plant.
Missouri ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Missouri contractors
Missouri contractors: let’s win the next project together
If your next bid involves St. Louis aerospace, World Steel wants to be your long-term, win-win steel partner in Missouri. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Missouri project is cut, welded, inspected and packed.
Q&A
What Missouri buyers ask
How long a span can you supply?
Long-span trusses and built-up girders are part of our range; the span is set with your Engineer of Record for the loads and door.
Can you meet project security rules?
We follow the document handling your project specifies. Tell us the requirements at the start.
Do you design for New Madrid in St. Louis?
Yes. We detail the bracing and connections for the seismic design category of the site.
Official sources: Missouri Department of Economic Development
Missouri solutions
Every Missouri guide
Related pages
Code facts on this page summarize Missouri practice, local IBC adoption, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Missouri?
Send the drawings or the site address, size and use. We set the Missouri design basis with your Engineer of Record, design or detail the steel to your local code and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.