- Ratings, listed designs and product selection
- Architect, fire protection engineer and Engineer of Record
- Thickness schedule from the listing
- Coating manufacturer, with the design team; we link it to piece marks
- Blasting, priming and shop coating to the schedule
- World Steel, in our plant in Vietnam, to the manufacturer’s instructions
- Shop thickness records and Manufacturing Data Record
- World Steel
- Erection, connection coating and touch-up
- The US contractor, our customer, and its applicator
- Firestopping at penetrations and joints
- The US contractor’s firestop installer
- Special inspection and final acceptance
- Inspectors approved by the building official, and the fire marshal