Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Oregon · Data centers

Structural steel for Oregon data center campuses

Oregon was one of the first states to host the hyperscale data center, drawn by hydropower on the Columbia, cool dry air and trans-Pacific fiber landing on the coast. Large campuses grow in Hillsboro, The Dalles and Prineville, each one many identical halls built phase by phase.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at the Port of Portland or Seattle–Tacoma for your Oregon site.

Built-up members with welded stiffeners and drilled clip plates on shop supports
Stiffeners and drilled clip plates welded on, World Steel plant in Vietnam.
Clusters
Hillsboro, The Dalles, Prineville
Draw
Hydropower, cool air
Halls
Repeat, phase by phase
Loads
Seismic, snow, wind

Why it matters

Repeat halls, three climates

A data hall repeats the same bay many times, so a small saving per bay adds up. In Hillsboro the seismic design leads, in The Dalles the Gorge wind, and in Prineville snow at high elevation. Cooling plant and screens sit on the roof, cable trays and containment hang from the structure, and generator yards need platforms and canopies.

We design or detail the frames, bracing, roof platforms, screens and support steel for the site, keep the piece marks of each phase consistent, and release the steel hall by hall.

What we design and fabricate

Steel for data centers

Hall frames

Repeat bays with seismic bracing and matching piece marks.

Roof plant

Platforms and screens for cooling plant.

Support steel

Cable tray and containment supports.

Yard steel

Generator platforms and canopies.

Who does what

Data center steel, split clearly

World Steel supplies

  • Hall frame, bracing, platform and screen design or detailing
  • Support steel for cable trays and containment
  • Phase-by-phase releases with matching piece marks
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Power, cooling and IT design with the owner
  • Engineer of Record approval and PE seal
  • Permit and inspections
  • Mechanical and electrical installation
  • Erection and site work

Oregon

What we do not claim

World Steel names no data center operator or campus in Oregon as a customer.

Oregon ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Oregon contractors

Oregon contractors: let’s win the next project together

If your next bid involves data centers, World Steel wants to be your long-term, win-win steel partner in Oregon. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Oregon project is cut, welded, inspected and packed.

Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.
Gray members stacked and strapped together on a packing rack
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.

Q&A

What Oregon buyers ask

Can you supply a data center campus in phases?

Yes. Each phase is released and packed on its own, with piece marks that match the earlier phases.

Which loads govern an Oregon data hall?

It depends on the site: seismic in Hillsboro, wind in the Gorge and snow in Prineville. We check all of them on one model.

Do you supply generator yard steel?

Yes. Platforms, canopies and screens for the yard are fabricated with the building steel.

Official sources: Business Oregon

Oregon solutions

Every Oregon guide

Related pages

Code facts on this page summarize Oregon practice, the Oregon Structural Specialty Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Oregon?

Send the drawings or the site address, size and use. We set the Oregon design basis with your Engineer of Record, design or detail the steel to the Oregon Structural Specialty Code and for Cascadia seismic hazard, snow and coastal wind, and quote it made in our plant in Vietnam, packed in erection order and landed at the Port of Portland or Seattle–Tacoma for the truck to your site.