Structural steel and the Michigan Building Code
Michigan adopts the IBC statewide as the Michigan Building Code, administered by the Bureau of Construction Codes. Cities, townships and counties that run their own building departments enforce it locally; where they do not, the state does. The structural rules are the same across the state; the plan review office depends on the address.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by port and rail to your Michigan site.
Spec plateMichigan Building Code
- Code
- Michigan Building Code
- Based on
- The IBC
- Enforced by
- Local jurisdictions or the state
- Our part
- Code basis on sheet one
Why it matters
One code, many building departments
A statewide code makes the steel design basis predictable from a supplier plant in Macomb County to a warehouse near Grand Rapids. What changes is who reviews it and how quickly, and the snow load for the site, which changes a great deal across the state.
We put the code edition, the ASCE 7 loads and the design criteria on the first sheet of the calculations, so your Engineer of Record and the building official see the basis at once.
Design basis
What the steel design states
The items we confirm with your Engineer of Record before modeling.
| Item | What we state |
|---|---|
| Code edition | The Michigan Building Code edition in force at permit |
| Snow | Ground snow, drift and sliding snow for the exact site |
| Wind | ASCE 7 basic wind speed, exposure and risk category |
| Cranes and equipment | Crane classes, wheel loads and roof equipment |
| Steel | AISC 360 design, connection types and coating system |
Who does what
Code compliance, split clearly
World Steel supplies
- Steel design or detailing to the stated code basis
- Calculations and drawings for your engineer’s review
- Envelope details for the energy code
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Engineer of Record approval and PE seal
- Plan review with the local department or the state
- Inspections on site
- Foundations and erection
- The building permit
Michigan
What we do not claim
World Steel holds no Michigan approval and no Michigan engineering license. The design is sealed and submitted by your Engineer of Record.
Michigan ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Michigan contractors
Michigan contractors: let’s win the next project together
If your next bid involves Michigan Building Code, World Steel wants to be your long-term, win-win steel partner in Michigan. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Michigan project is cut, welded, inspected and packed.
Q&A
What Michigan buyers ask
Does the same code apply in Detroit and in rural townships?
Yes. The Michigan Building Code applies statewide. Detroit and many cities enforce it themselves; elsewhere the county or the state does.
Who administers the code?
The Bureau of Construction Codes, part of the Department of Licensing and Regulatory Affairs. Your Engineer of Record confirms the edition in force.
Do you provide calculations for plan review?
Yes. We provide the calculations and drawings your Engineer of Record reviews, seals and submits.
Official sources: Michigan Bureau of Construction Codes
Michigan solutions
Every Michigan guide
Related pages
Code facts on this page summarize Michigan practice, the Michigan Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the code and edition in force for your permit.
Building in Michigan?
Send the drawings or the site address, size and use. We set the Michigan design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the port and rail trip to your site.