Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Oklahoma · Storms

Structural steel for Oklahoma tornado, hail and ice

Oklahoma sits in the heart of Tornado Alley, and the storms do not stop in spring. Large hail follows in summer and ice storms in winter, when ice builds on roofs, canopies and equipment. A large building here is designed for all three, with the load path, the openings and the roof getting the most attention.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Port Houston and trucked north to your Oklahoma site.

Galvanized steel frames with punched bolt plates at the corners on shop trestles
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Spring
Tornadoes
Summer
Large hail
Winter
Ice storms
Shelters
ICC 500 by your engineer

Why it matters

Three storm seasons, one building

When a large door fails in a storm, wind enters the building and the pressure inside pushes the roof up while the outside pulls it. Designing door framing, bracing and anchorage for the full pressure keeps the frame working as designed. Where the code and the risk category require tornado loads, they are applied to the main frame and the components.

Ice adds weight to roofs, canopies and exposed equipment steel, and hail decides the roof panel. We design for the ice load for the site, frame the roof for the panel chosen for hail, and supply steel for storm shelters that your engineer designs to ICC 500.

What we design and fabricate

Steel for Oklahoma storms

Opening framing

Jambs and headers for doors under storm pressure.

Anchorage

Base plates and anchor rods for uplift and shear.

Ice loads

Canopies and equipment steel designed for ice.

Shelter steel

Steel for ICC 500 shelters to your engineer’s design.

Who does what

Storm design, split clearly

World Steel supplies

  • Frame, bracing and opening framing for the stated wind
  • Ice and tornado loads where the design basis requires them
  • Steel for storm shelters to the engineer’s design
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Risk category and loads confirmed by the Engineer of Record
  • Shelter design to ICC 500 and its approvals
  • Roof panel and hail rating chosen with the owner
  • Local permit and inspections
  • Erection and site work

Oklahoma

What we do not claim

World Steel does not design or certify storm shelters and claims no hail rating for any roof. Shelters are designed to ICC 500 by your engineer, and roof panels carry their own ratings.

Oklahoma ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Oklahoma contractors

Oklahoma contractors: let’s win the next project together

If your next bid involves tornado, hail and ice, World Steel wants to be your long-term, win-win steel partner in Oklahoma. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Oklahoma project is cut, welded, inspected and packed.

Finished columns with base plates resting on shop rails
Finished columns laid out for dimensional checks, World Steel, Vietnam.
Tubular column with a square base plate and bolt holes, crew working behind it
Column with its base plate and anchor-bolt holes, fabricated in the Vietnam plant.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.
Painted members strapped into bundles and stacked for the voyage
Bundles made up for an export shipment at the Vietnam plant.

Q&A

What Oklahoma buyers ask

Do you design for tornado loads?

Yes, where the code and the risk category require them, to the design basis your Engineer of Record confirms.

Can you supply steel for storm shelters?

Yes. Your engineer designs the shelter to ICC 500, and we fabricate the steel to that design.

How do you handle ice?

We apply the ice load for the site to roofs, canopies and exposed equipment steel.

Official sources: ASCE Hazard Tool · NOAA Storm Prediction Center

Oklahoma solutions

Every Oklahoma guide

Related pages

Code facts on this page summarize Oklahoma practice, the IBC as adopted by the Oklahoma Uniform Building Code Commission, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Oklahoma?

Send the drawings or the site address, size and use. We set the Oklahoma design basis with your Engineer of Record, design or detail the steel to the statewide code and to tornado, hail, ice and seismic loads, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.