Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Incoterms® 2020 · CIF · Cost, Insurance and Freight

CIF: freight and cargo cover to your US port

Cost, Insurance and Freight adds cargo insurance to CFR. We book the sailing to your US port and take out a policy that pays out to you. Risk still passes when the steel is on board in Vietnam.

Commonly quoted A term we quote routinely for US projects.

Risk passes
When the steel is on board in Vietnam. From then on, the policy we bought protects you.
Named place
The US port of destination, such as Long Beach, Houston or Savannah
Importer of record
You or your nominee
Transport
Sea and inland waterway only
CIF from World Steel’s plant in Vietnam to a US site. World Steel pays carriage to the US port. Risk passes to you when the steel is on board in Vietnam. From then on, the policy we bought protects you. US customs and duties: you. PACIFIC OCEAN Our plant Tay Ninh, Vietnam Cat Lai / Cai Mep Vietnam US port West, Gulf or East Your site United States Customs & duties: you Risk passes to you
World Steel pays You pay Risk passes

Responsibility diagram

Who does what under CIF, stage by stage

From packing at our plant in Vietnam to unloading at your US site. Navy is World Steel, red is you, and the dashed red line is where the risk of loss or damage passes to you.

Stage
World SteelWS
You
In Vietnam
Export packing at our plant
World SteelWS
—
Loading onto the truck at the plant
World SteelWS
—
Vietnam export clearance
World SteelWS
—
Trucking to Cat Lai or Cai Mep
World SteelWS
—
Terminal handling and loading on board
World SteelWS
—
Risk passes to you here: when the steel is on board in Vietnam. From then on, the policy we bought protects you.
At sea
Ocean freight across the Pacific
World SteelWS
—
Cargo insurance
World SteelWS
—
In the United States
Unloading at the US port terminal
Set by the carriage contract
US customs entry (importer of record)
—
You
US duties, including Section 232
—
You
Truck or rail to your site
—
You
Unloading at your site
—
You

Example of a named place: CIF Port of Savannah, Georgia (Incoterms® 2020). The quote states the exact place, because it moves the hand-over points.

Cost, risk and insurance

Paying for a leg is not the same as carrying its risk

Under every Incoterms® rule, cost and risk can pass at different points. Under CIF they work like this.

Where risk passes

When the steel is on board in Vietnam. From then on, the policy we bought protects you.

Who pays for what

Everything to the named US port, plus the cargo policy, is ours. Unloading there follows the carriage contract. US entry, duties and delivery are yours.

Cargo insurance

Required of the seller: at least minimum cover (Institute Cargo Clauses C or similar) for 110% of the contract value. Ask for broader cover in the quote if you want it.

US customs and duties

You are the importer of record

You, or the party you appoint, act as US importer of record and pay any duties, including Section 232.

Imported steel can be subject to US duties, including Section 232, and the rules change by proclamation. We publish no duty rates or landed costs. Our Section 232 page summarizes the current rules from official sources, and your licensed customs broker confirms the classification at entry.

  • Commercial invoice by line

    Members and accessories grouped so each HTSUS line can be classified, with weights in kg and lb.

  • EN 10204 3.1 mill certificates

    Mill, grade and heat number for the melt-and-pour declaration.

  • Certificate of origin

    Steel made in our plant in Vietnam, with the mill and country of each heat on its certificate.

  • Documents in PEB Studio

    Released to your broker’s login before the vessel arrives.

When it fits

CIF works well for

  • Buyers without their own cargo policyThe voyage is insured from loading without you arranging anything.
  • One figure to the portSteel, freight and cover in one quote; you arrange only the US side.

Watch out for

Points to settle before you sign

  • Minimum cover is minimumClauses C cover major casualties, not every kind of damage. Ask us to quote all-risks cover if you need it.
  • The policy is yours to claim onWe hand you the insurance certificate; a claim runs between you and the insurer.

Our part under CIF

You receive the insurance certificate with the bill of lading and the English document set. Seal numbers, packing reports and loading photos for every container sit in PEB Studio, ready if a claim is ever needed.

Why trade with World Steel

We know CIF, the US market and international trade

Buying steel from another country should not mean guessing who pays what. Our team prepares export files from Vietnam, works with US forwarders, customs brokers and truckers, and writes every quote so the Incoterm, the named place, the importer of record and the party carrying any duties are clear before you sign.

We work in English.

Your project manager, engineers and logistics team write, call and draw in English: quotes, contracts, shop drawings, packing lists, customs documents and PEB Studio. No interpreters and no language barrier, at hours that suit your US time zone.

  • We know the US market

    Gateway ports, customs entries, Section 232, inland trucking and rail, and the US codes your building is designed to.

  • International trade is our routine

    Export clearance in Vietnam, bills of lading, certificates of origin, mill certificates and bank documents, prepared in-house.

  • Every term, in writing

    Each quote names the Incoterm, the named place, the importer of record and who carries duties. Nothing is left to assumption.

  • One language from quote to closeout

    English across email, video calls, drawings and documents, so your broker, erector and lender read the same file.

  • Live in PEB Studio

    Production, packing, seal numbers and documents released in real time, whichever term you buy on.

  • One accredited plant

    Made in our own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472.

US gateway ports

We pick the port that keeps the inland leg short and has a suitable sailing from southern Vietnam. Each port page shows its terminals, rail links and the states it serves.

State guides

Building in a specific state?

Each state guide covers the code edition, wind, snow and seismic conditions, the ports that serve it and how steel reaches the site.

Questions from US buyers

CIF questions we hear

Is CIF insurance enough for a steel building?

It meets the rule’s minimum. For coated steel, panels and accessories many buyers prefer all-risks cover, which we can quote, or they extend their own policy.

Which Incoterm will my World Steel quote use?

The one you ask for, where it suits the job. FOB, CFR, CIF and DAP are the terms we quote most for US projects; DDP is quoted case by case. Every quote names the Incoterm, the named place and the importer of record in writing.

Does CIF decide when I own the steel or when I pay?

No. Incoterms® rules allocate delivery, costs, risk and customs formalities. Title, payment terms and remedies are set by the sales contract, which we write in English.

Incoterms® 2020

Compare with the other ten rules

Every rule has its own page with the same responsibility diagram, so you can compare what changes from one term to the next.

Closest to CIF: CPT (Carriage Paid To), CIP (Carriage and Insurance Paid To), CFR (Cost and Freight). Or see all eleven side by side.

Incoterms® is a trademark of the International Chamber of Commerce. This page is a plain-English summary for US buyers, not the ICC rules and not legal advice; the official Incoterms® 2020 publication governs. Each World Steel quote states the rule and its version.

Ready for a CIF quote?

Send the site address and what the building is for. We engineer it to US codes, make it in our plant in Vietnam and quote it on CIF or the term that suits you, with the named place and the importer of record in writing.