Montana · Seismic
Structural steel for western Montana seismic design
Western Montana lies in the Intermountain Seismic Belt. The 1959 Hebgen Lake earthquake near Yellowstone and the 1935 Helena earthquakes are the reference events, and Missoula, Bozeman, Helena and Kalispell sites can fall in Seismic Design Category D. We design and fabricate the lateral steel to AISC 341 where it applies.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail or truck for your Montana site.
- Belt
- Intermountain Seismic
- Reference events
- Hebgen Lake, Helena
- Design
- AISC 341 where it applies
- Welds
- AWS D1.8-qualified
Why it matters
Faults under the valleys
The western valleys where Montana is growing fastest are also where the faults are. Heavy roof snow adds seismic mass, so frames and anchorage are sized for both.
We design or detail braced and moment frames to AISC 341 where they apply, mark protected zones on request and weld demand-critical joints with AWS D1.8-qualified WPS and welders.
What we design and fabricate
Steel for seismic categories
Braced frames
Special concentric and buckling-restrained frame steel.
Moment frames
Prequalified connections under AISC 358 where specified.
Demand-critical welds
Welds made by AWS D1.8-qualified welders with procedures on file.
Anchorage
Base plates and anchor rods for the seismic reactions.
Who does what
Seismic steel, split clearly
World Steel supplies
- Lateral system steel designed or detailed to AISC 341 where it applies
- AWS D1.8-qualified procedures and welders for demand-critical welds
- Protected zones marked on the members on request
- Mill certificates traced by heat, with Charpy results on request
- Tekla shop and erection drawings, included
The US contractor arranges
- Site class and Seismic Design Category by the Engineer of Record
- Engineer of Record approval and PE seal
- Special inspections and the quality assurance plan
- Foundations and anchorage installation
- Erection and site work
Montana
What we do not claim
AISC 341 is a design standard, not a fabricator certificate, and World Steel holds no Montana engineering license. We design and fabricate to AISC 341 where it applies, and your Engineer of Record approves and seals the design.
Montana ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Montana contractors
Montana contractors: let’s win the next project together
If your next bid involves western seismic belts, World Steel wants to be your long-term, win-win steel partner in Montana. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Montana project is cut, welded, inspected and packed.
Q&A
What Montana buyers ask
Which Montana sites need seismic detailing?
Mostly the west. Your engineer sets the category from the site soils.
Is AISC 341 a certificate?
No. AISC 341 is a design standard. We design and fabricate to it where it applies.
Can you supply Charpy-tested plate?
Yes. Vietnam plate mills can supply EN 10204 3.1 certificates with Charpy results on request.
Official sources: Montana Bureau of Mines and Geology
Montana solutions
Every Montana guide
Related pages
Code facts on this page summarize Montana practice, the Montana building code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Montana?
Send the drawings or the site address, size and use. We set the Montana design basis with your Engineer of Record, design or detail the steel to the Montana building code, western seismic belts and mountain snow, and quote it made in our plant in Vietnam, packed complete in erection order and delivered by rail or truck to your site.