US site conditions · Connections

From roof screw to anchor rod: designing the load path link by link

Walk a storm-damaged metal building and the beams are usually intact. What failed was smaller: a purlin clip, a row of screws, a slack rod, a base plate that rose off its grout. Our engineers treat each of those parts as a designed element, show it on the drawings, and bolt every field joint so your crew assembles instead of welds.

Painted beams with bolted end plates resting on stands below an overhead crane
Detail: bolted end plates, shop welded

In the field

Bolts only; the metal building frame needs no structural field welds

Designed to

AISC 360-22 and the RCSC Specification, plus AISC 341 when seismic rules apply

Detailing

Tekla Structures model of each joint, down to the last washer

Traceability

Each piece mark linked in PEB Studio to its weld, coating and material records

Trace a load

The ten links between roof and footing

Uplift tries to lift the roof, drifted snow presses it down and an earthquake pushes it sideways. All three travel through the same ten links, and the weakest one decides what the whole building can carry.

roof load in reactions to footing
  1. Panel to purlin

    Designed by: World Steel

    Screw type and pattern come from tested roof assemblies, with denser spacing at corners and edges.

  2. Purlin laps

    Designed by: World Steel

    The lap length and bolt count must deliver the continuity the purlin calculation relies on.

  3. Purlin to rafter

    Designed by: World Steel

    Clips and bolts sized for both uplift and heavy snow, with anti-roll devices where the design calls for them.

  4. Flange braces

    Designed by: World Steel

    Small angles that stop the inside rafter flange from buckling when uplift or drift flips the bending.

  5. Rafter splice

    Designed by: World Steel

    Where a long rafter ships in pieces, bolted end plates rejoin it for the bending and shear at that spot.

  6. Knee joint

    Designed by: World Steel

    The rafter-to-column end plate, where a rigid frame carries its peak moment.

  7. Bracing

    Designed by: World Steel

    Roof and wall braces that collect wind and seismic shear and deliver it to the base.

  8. Column base

    Designed by: World Steel

    A pinned or fixed base plate, matching the support condition the model assumed.

  9. Anchor rods

    Designed by: World Steel and the foundation engineer

    Rod size, ASTM F1554 grade, layout and every reaction reach the foundation engineer well before the footing design is due.

  10. Footing

    Designed by: Foundation engineer

    Embedment and concrete are designed by your foundation engineer from the reactions we supply.

Joint types

What drives each connection in a World Steel frame

Laid out the way a connection schedule appears on our erection drawings.

ConnectionUsual detailGoverning demand on US projects
Knee (rafter to column)Extended or flush end plate, welded in the shop, bolted in the fieldSnow and drift moment, uplift reversal, bolt tension
Rafter splice or ridgeBolted end platesMoment and shear, with pretension where specified
BracingRods, angles or HSS on gusset platesWind and seismic shear; stricter brace rules as the Seismic Design Category climbs
Purlins and girts to frameBolted cold-formed clipsEdge and corner uplift on coasts and plains; drift beside roof steps
Column baseBase plate on anchor rods, shear lug if neededUplift, outward frame thrust and base shear
Crane and mezzanine supportsBrackets with seated or end-plate jointsCyclic load, impact and vibration
World Steel · Tekla StructuresDesigned to AISC 360-22 / RCSCFor the Engineer of Record's review and approval

Why bolted field joints suit US crews

Welds made in our plant, bolts made on your site

In our plant

  • Plates welded to members under qualified procedures and inspected before they ship
  • Holes cut or drilled to the Tekla model, with laser cutting and hole-making in plate up to 100 mm (about 4 in) thick
  • Coating applied and logged, including the faying surfaces your joint type allows
  • Bolts, nuts and washers counted from the Tekla bolt list by joint and by shipment

On your site

  • Your ironworkers bolt every frame joint: no field weld inspection on the frame
  • Snug-tight, pretensioned or slip-critical, as labeled joint by joint on the drawings
  • A special inspector can compare each bolted joint with the drawing
  • After a storm, a heavy snow or an earthquake, bolted joints can be checked or replaced

Weather-tolerant erection

A crew can keep bolting through a Minnesota January or a Louisiana August, conditions that make field welding and touch-up painting hard to do well.

Coatings that agree

Fasteners get protection compatible with the steel around them, so they do not become the first rust spot near the ocean or in road-salt country.

Thrust at the base

A rigid frame spreads at its feet. The reactions show that horizontal thrust so the slab, hairpins or tie rods can be designed to resist it.

In your submittal

Connection documents you receive

  • Joint-by-joint calculations using SAP2000 forces
  • Erection drawings that give every joint its bolt grade, diameter and joint type
  • Hardware lists broken down by joint and by shipment
  • Anchor rod drawing with projection heights and each base plate
  • Reactions at every column for every combination
  • Assembly shop drawings from the same Tekla model, included at no extra charge

Read how shop drawings and the RCSC joint types are handled.

Welded members with drilled end plates laid out side by side
Tubular column with a square base plate and bolt holes, crew working behind it
Row of columns ending in drilled square base plates
Built-up members with welded stiffeners and drilled clip plates on shop supports
Primed column with its bolted end plate set on painting stands
Pair of red truss assemblies with bolted connection plates inside the shop

Asked by US project teams

Connection questions

10 answers from our engineers, grouped by topic.

Bolts and field work 4 answers

Will my erector need to weld anything?

No structural welding is needed on the metal building frame because every frame joint is bolted. Other trades may still weld embed plates, miscellaneous metals or architectural items.

Which bolt grade do you specify?

Whatever your project specification requires, which on US-code jobs is typically ASTM F3125 Grade A325 or A490. The erection drawings give the grade, diameter and joint type joint by joint.

Does every bolt have to be pretensioned?

No. RCSC lets a joint be snug-tight, pretensioned or slip-critical. We assign one to each connection during design and label it on the drawings, so the crew and the inspector work to the same instruction.

How do you make sure the holes line up on site?

Every hole comes from the same Tekla model as the drawings and is cut or drilled by machine; our laser machines cut and make holes in plate up to 100 mm (about 4 in) thick. Members are checked against the shop drawing before blasting.

Bases and foundations 3 answers

Who designs the anchor rod embedment?

We design the base plates and send the anchor rod plan with all reactions. Embedment depth, edge distance and the concrete design fall to your foundation engineer under ACI 318.

When do we get the reactions for the foundation design?

Early, ahead of the steel drawings, because the footings are poured first. The reaction package lists every column for every load combination, with seismic overstrength cases called out separately where they apply.

Can the base plates take outward thrust from the frames?

The base plates and anchor rods are designed for the thrust the frames produce, but resisting it in the ground is the foundation designer's choice: a tie through the slab, hairpins or the footing itself.

Documents and inspection 3 answers

What should we look at after a big storm or quake?

Start with corner and edge roof fasteners, trims, door jambs, brace tension and the base plates. The full season-by-season list is on our lifecycle maintenance page.

Can a special inspector check your shop welds?

Yes. Shop welds are made under qualified procedures and inspected in our plant, with results in the Manufacturing Data Record. Your inspector can witness hold points live by video or in person, and our plant is accredited under IAS AC472.

Are connection designs included in the price of the steel?

Yes. Connection design, erection drawings and shop drawings come with every World Steel project at no extra charge, for the Engineer of Record's review and approval.

Keep reading

Related engineering guides

Each one goes deeper on a part of the design this page touches.

All eight US site-condition guides, the standards we design to and the IAS AC472 program are on the engineering & standards hub.

Get an engineer’s eyes on your US building

Share drawings, a sketch or the footprint and site address. We agree the design criteria with your Engineer of Record, then send a written scope and the list of submittals, from a plant that fabricates 2,500 metric tons of structural steel a month.