Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Washington, DC · Snow

Structural steel for Washington, DC rooftop snow drift

DC snow loads are moderate, but the back-to-back storms of February 2010 dropped record snow and caused roof collapses in the region. On DC’s wide, flat roofs, snow drifts against penthouses, parapets, screens and rooftop units. We check drift at every step and size the roof steel for it.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Baltimore for your Washington, DC site.

Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Ground snow
Moderate
Reference storms
February 2010
Check
Drift at every step
Roofs
Wide and flat

Why it matters

Flat roofs, tall penthouses

Height Act buildings put mechanical penthouses, screens and green roofs on wide flat roofs, and every one of them catches drift.

We size purlins, beams and dunnage steel for drift at penthouses, parapets and units, and frame rooftop equipment platforms for the snow your Engineer of Record sets.

What we design and fabricate

Steel for heavy snow

Purlins for drift

Z purlins lapped and sized where drift collects.

Rafters and trusses

Built-up rafters and trusses for heavy snow over long spans.

Thermal breaks

Details that keep cold out of heated and frozen spaces.

Base reactions

Clear reactions for footings set below the frost line.

Who does what

Snow and frost, split clearly

World Steel supplies

  • Roof steel designed for snow and drift to ASCE 7
  • Drift checks at steps, parapets and rooftop units
  • Thermal break details at the envelope
  • Base reactions for the foundation design
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Ground snow and exposure with the Engineer of Record
  • Engineer of Record approval and PE seal
  • Frost depth and footing design
  • Cold-weather concrete and site work
  • Erection and site work

Washington, DC

What we do not claim

World Steel does not design foundations. Frost depth and footing design are your foundation engineer’s scope; we provide the base reactions they need.

Washington, DC ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Washington, DC contractors

Washington, DC contractors: let’s win the next project together

If your next bid involves rooftop snow drift, World Steel wants to be your long-term, win-win steel partner in Washington, DC. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Washington, DC project is cut, welded, inspected and packed.

Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Crew loading steel parts onto the shot-blasting conveyor
Parts going into the blaster ahead of primer, World Steel, Vietnam.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.

Q&A

What Washington, DC buyers ask

Do you check drift at penthouses?

Yes. Drift is checked at penthouses, parapets and rooftop units.

Can you supply dunnage steel?

Yes. Rooftop equipment platforms are part of the package.

Do you design green roof loads?

Your Engineer of Record sets them; we size the steel to suit.

Official sources: National Weather Service, Sterling

Building in Washington, DC?

Send the drawings or the site address, size and use. We set the Washington, DC design basis with your Engineer of Record, design or detail the steel to the DC Construction Codes, and quote it made in our plant in Vietnam, packed in erection order and delivered through Baltimore to your site.