Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Coatings for Puget Sound salt air and Northwest rain

Ports, terminals and plants on Puget Sound, Grays Harbor and the Columbia sit in salt air for decades, and western Washington stays wet for much of the year. Steel that stays dry inside a warm building needs little; steel on a pier, in an open shed or in a cold, humid room needs a coating chosen for that exposure.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Washington port.

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Washington project is cut, welded, inspected and packed.

Q&A

What Washington buyers ask

Is the steel galvanized before shipping?

Yes, where the specification calls for it. Members are galvanized in Vietnam after fabrication and before shipping, detailed with vent and drain holes.

Can you apply a duplex system?

Yes. Galvanizing with a paint system on top is common for marine exposure and is applied before shipping.

Can you follow our coating specification?

Yes. We follow your specification and record surface preparation, film thickness and inspection per batch.

Washington solutions

Every Washington guide

Related pages

Code facts on this page summarize Washington rules, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.

Building in Washington?

Send the drawings or the site address, size and use. We set the Washington design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.