Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Kansas · Delivery

Structural steel delivered to Kansas job sites

Kansas has no seaport, so our steel lands at Houston or Los Angeles–Long Beach and travels by rail to the intermodal hubs around Kansas City, then by truck on I-35, I-70 and I-135. Members are packed in erection order, so each truck carries one area.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail through Kansas City for your Kansas site.

Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Gulf gateway
Port of Houston
West gateway
Los Angeles–Long Beach
Rail hub
Kansas City
Packing
Erection order

Why it matters

Port, rail, then truck

Houston is the shortest ocean route for much of our steel, with rail and truck north on I-35. West Coast ports connect by rail to Kansas City. The choice depends on the site, the size of the package and the delivery terms.

We pack bundles by erection area, label every piece and show loading in PEB Studio, so your team in Wichita or Garden City knows what is on each truck.

The route

How steel reaches a Kansas site

Port of Houston

Gulf Coast gateway, with truck and rail north on I-35.

Port page →

Port of Los Angeles

West Coast gateway with rail service to Kansas City.

Port page →

Port of Long Beach

Second West Coast gateway on the same rail lines.

Port page →

Kansas City intermodal

Rail yards at Edgerton and Kansas City for the truck to your site.

Kansas

Kansas ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Kansas contractors

Kansas contractors: let’s win the next project together

If your next bid involves steel by rail to Kansas, World Steel wants to be your long-term, win-win steel partner in Kansas. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Kansas project is cut, welded, inspected and packed.

Welder beside a deep built-up girder running through the automatic line
A deep plate girder going through automatic welding at World Steel, Vietnam.
Two welders operating a submerged-arc welding station on a member
Submerged-arc welding of web-to-flange seams in the Vietnam plant.
Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.

Q&A

What Kansas buyers ask

Which port is best for Kansas?

Usually Houston or Los Angeles–Long Beach. We compare routes for your site and terms.

Can you deliver to the site?

Yes, depending on the Incoterms agreed. Your logistics team or ours books the inland legs.

How are members packed?

In erection order, labeled by area, with packing lists for each bundle.

Official sources: Kansas Department of Transportation

Kansas solutions

Every Kansas guide

Related pages

Code facts on this page summarize Kansas practice, the code your city or county adopts, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Kansas?

Send the drawings or the site address, size and use. We set the Kansas design basis with your Engineer of Record, design or detail the steel to your local code and open-plains wind, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail through Kansas City for the truck to your site.