Hawaii · Delivery
Structural steel shipped to Hawaii job sites
Every building material in Hawaii arrives by sea. Our steel ships from our plant in Vietnam by ocean freight to Honolulu Harbor, and from there by interisland barge to Kahului, Nawiliwili, Hilo or Kawaihae. Members are packed in erection order and protected for the voyage.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped by ocean freight to Honolulu for your Hawaii site.
- Gateway
- Honolulu Harbor
- Neighbor islands
- Interisland barges
- Alternative
- Via the West Coast
- Packing
- Erection order
Why it matters
Across the Pacific, then by barge
Honolulu is the main gateway, with interisland barge service to the neighbor island harbors. Some packages may route through the West Coast. The choice depends on the island, the package and the delivery terms.
We pack bundles by erection area, protect them for the voyage, label every piece and show loading in PEB Studio, so your team knows what arrives on each container or barge.
The route
How steel reaches a Hawaii site
Neighbor island harbors
Kahului, Nawiliwili, Hilo and Kawaihae by barge.
Hawaii
Hawaii ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Hawaii contractors
Hawaii contractors: let’s win the next project together
If your next bid involves direct ocean freight, World Steel wants to be your long-term, win-win steel partner in Hawaii. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Hawaii project is cut, welded, inspected and packed.
Q&A
What Hawaii buyers ask
Do you ship directly to Honolulu?
Yes. Steel ships by ocean freight to Honolulu Harbor.
Can you deliver to neighbor islands?
Yes, by interisland barge, depending on the Incoterms agreed.
How is steel protected at sea?
Bundles are packed and protected for the voyage, with packing lists for each.
Official sources: Hawaii Department of Transportation, Harbors
Hawaii solutions
Every Hawaii guide
Related pages
Code facts on this page summarize Hawaii practice, the Hawaii State Building Code as your county adopts it, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Hawaii?
Send the drawings or the site address, size and use. We set the Hawaii design basis with your Engineer of Record, design or detail the steel to your county’s code, hurricane wind and island seismic, coat it for salt air, and quote it made in our plant in Vietnam, packed in erection order and shipped by ocean freight to Honolulu.