Oregon · Silicon Forest
Structural steel for Oregon’s Silicon Forest chip and tech plants
Washington County west of Portland is the Silicon Forest, home to one of the largest semiconductor research and manufacturing campuses in the world and to many suppliers around it. Fabs, support buildings and tech plants keep growing in Hillsboro, all in a high seismic category on soft valley soils.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at the Port of Portland or Seattle–Tacoma for your Oregon site.
- Cluster
- Hillsboro, Washington County
- Plants
- Fabs and support buildings
- Floors
- Stiff, low vibration
- Seismic
- High categories
Open call · Oregon contractors
Oregon contractors: let’s win the next project together
If your next bid involves Silicon Forest tech plants, World Steel wants to be your long-term, win-win steel partner in Oregon. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Oregon project is cut, welded, inspected and packed.
Q&A
What Oregon buyers ask
Can you design support steel for tool vibration?
Yes. We size support steel to the stiffness and vibration criteria your Engineer of Record sets and report the checks.
Do you supply utility racks?
Yes. Pipe racks, duct supports and cable tray supports are fabricated with the building steel.
Can you supply a plant in phases?
Yes. Each phase is released and packed on its own, with piece marks that match the earlier phases.
Official sources: Business Oregon: semiconductors
Oregon solutions
Every Oregon guide
Related pages
Code facts on this page summarize Oregon practice, the Oregon Structural Specialty Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Oregon?
Send the drawings or the site address, size and use. We set the Oregon design basis with your Engineer of Record, design or detail the steel to the Oregon Structural Specialty Code and for Cascadia seismic hazard, snow and coastal wind, and quote it made in our plant in Vietnam, packed in erection order and landed at the Port of Portland or Seattle–Tacoma for the truck to your site.