- Made in
- World Steel’s own plant, Tay Ninh Province, Vietnam
- Materials
- ASTM grades, mainly from Vietnamese mills
- Order from
- Your drawings, a parts list or a Tekla model
- Every piece
- Tagged, packed and tracked in PEB Studio
What you can order
Components we make on their own
Each group links to the full product pages.
Built-up columns and rafters, tapered frames, trusses and hot-rolled members, cut, welded and coated to your piece marks.
Cold-formed Z and C purlins, girts and eave struts, punched to your hole pattern, plus rod and cable bracing.
Roof panels, standing seam and through-fastened, with ridge caps and flashings to match.
Wall panels, corner trims, flashings and louvers in the profile and color you choose.
Anchor bolts, base plates, structural bolts and connection plates.
Mezzanine framing, decking, stairs, handrails and guardrails.
Who it is for
Common reasons to buy components
Dealers and builders
You sell and erect your own buildings and need a steady source of frames, secondary members and panels.
Contractors with a design
Your engineer has designed the building and you need it fabricated to the drawings, without a full package.
Expansions and repairs
You are adding bays or replacing damaged panels and need parts that match what is already standing.
Secondary steel only
You have the main frames and need purlins, girts, bracing and trim.
Cladding only
You are recladding an old building and need roof and wall panels with matching trim.
Private label
You want components under your own brand. See OEM and private label.
How an order runs
From your list to tagged steel at your port
-
Send what you have
Drawings, a Tekla or IFC model, or a parts list with sizes, lengths, hole patterns and finishes.
-
Shop drawings
Our detailers prepare shop drawings or cutting lists for you to approve before anything is cut, included at no extra charge.
-
Fabrication and QC
Parts are made and inspected in our IAS AC472 accredited plant, with mill certificates filed under each heat.
-
Packing and shipping
Parts are bundled and tagged by piece mark, packed in containers and shipped to the US port you choose.
Asked by US buyers
Questions about components-only supply
Is there a minimum order?
Orders are planned around full containers. Tell us what you need and we will say how it can be packed.
Can you match an existing building?
We can match panel profiles and hole patterns from drawings or field measurements. Weathered panels may not match a new color exactly.
Where are the materials from?
All steel, coil and panels come from plants in Vietnam, and the parts are made in World Steel’s own plant.
Do I get mill certificates?
Yes. Mill certificates are filed under each heat and can be released with your shipment in PEB Studio.
Do you offer components under my brand?
Yes. Tags, labels and packing can carry your brand under our OEM and private label program.
More solutions
Often used together
Engineering
Steel building design
Calculations and drawings to US codes, ready for your Engineer of Record’s review and approval.
Learn more →Engineering
Expansions & add-ons
More bays, a wider span, a mezzanine or a crane for a steel building you already own.
Learn more →Delivery
PEB Studio real-time tracking
Follow your own members through fabrication, inspection, packing and shipping online.
Learn more →Solutions
All World Steel solutions
Supply models, engineering, delivery and the industries we serve.
See all →Bidding a large US project?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.