Aerial view of the M&D Warehouse, Thailand

Aerial photo, World Steel project archive.

Thailand

M&D Warehouse 2,000 t of structural steel for a warehouse in Thailand

A 2024 project for M&D in Thailand: about 2,000 metric tons (2,200 short tons) of structural steel designed, fabricated and supplied by World Steel. Large footprints like this are the packages US contractors bid for distribution and industrial work.

Location
Thailand
Building type
Warehouse
Year
2024
Structural steel
2,000 t
Next step Plan a similar building → Next step See all projects →

Project overview

About M&D Warehouse

M&D Warehouse is a 2024 project in Thailand for which World Steel designed, fabricated and supplied about 2,000 metric tons (2,200 short tons) of structural steel, one of the largest packages in our portfolio. For a US reader, the useful lesson is the sequence behind it: structural analysis, a 3D detailing model, shop drawings and cutting lists, factory production, and finally a packed shipment that matches the erection drawings bay by bay.

That same sequence is how a US warehouse moves from inquiry to delivery. Your Engineer of Record or architect sets the design basis, World Steel prepares calculations and drawings for review, and once they are approved the steel is fabricated and shipped. Your general contractor and erector then build it on site. Send your requirements to start the first step.

With about 2,000 tonnes of steel, M&D Warehouse is one of World Steel's flagship projects. A package this size is fabricated and shipped in phases, and each phase has to arrive complete so the erector can keep working. That is the scale World Steel targets for large US general contractors.

In context

M&D Warehouse by the numbers

Steel weight

About 2,000 metric tons of structural steel (2,205 short tons), about 80% of one month of the plant's 2,500 t monthly fabrication capacity.

It is the 3rd largest of the 20 projects on this site with a published steel tonnage.

In the portfolio

M&D Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied M&D Warehouse in 2024, together with 16 other projects shown here from that year.

Closest in steel weight:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.