Capacity first
2,500 t a month for the biggest steel jobs in the islands
Island projects come in phases and arrive by sea, so the steel has to be ready in large, complete releases. Our own plant fabricates 2,500 t of structural steel a month and splits a big job into area-by-area releases that match your crane and crew plan.
One plant, one quality system
Cutting, welding, blasting, coating and packing under one roof in Tay Ninh, Vietnam, accredited to IAS AC472 since 2019.
Laser cutting up to 100 mm
Plates up to 100 mm (about 4 in) thick are cut and holed on laser machines, so heavy base plates and girders keep their tolerance.
Releases in erection order
Each release ships with its own drawings, piece marks and packing list, so the first bundles on the quay are the first members up.
Six solution sets
Every Caribbean solution, one flag each
Start with the set that fits your project. Each one opens its own group of guides, tools and contacts for the Caribbean.
Hurricane and salt-air steel
Wind and roof uplift design, C5 and CX coatings, galvanizing and duplex, coastal detailing and storm care for every island.
Open the hurricane group →Caribbean logistics
Ports, the route through the Panama Canal, transshipment hubs and the import papers your broker needs.
See ports and routes →Shipping simulator
Pick your port and watch the bundles sail from our plant to your quay, leg by leg.
Run the simulator →Industrial estates
Estates, free zones and industrial parks in seven countries, with the steel each one asks for.
Browse the estates →Contractor partnership
You win and build the job; we design, fabricate and ship the steel, with 2,500 t a month behind your bid.
Partner with us →Caribbean contact
One desk for the region and a contact page for every country, with WhatsApp and a project form.
Talk to the Caribbean desk →Hurricanes, salt air, earthquakes
Designed for the three loads island steel meets
Three loads shape most Caribbean steel: hurricane wind, salt air and, on the plate boundaries, earthquakes. Your engineer of record sets the design values for the site; we design to them, detail every connection and coat each member for its exposure.
Broad public hazard picture by country; your engineer of record sets the design values for each site.
ISO 12944 series
From C1 to CX: the coating ladder for Caribbean coasts
Every member is blasted and coated in our plant before it sails, with an ISO 12944 system chosen for its corrosivity category. Coating systems come from Jotun, PPG, Carboline, Hempel, Nippon and International Paint, sold across the region, so touch-up and warranty stay simple.
Supply terms and shipping
FOB or CIF, packed in erection order
For the Caribbean we quote two Incoterms only. Either way the steel leaves our plant packed in erection order with a packing list for every bundle.
FOB
Free On Board, Vietnamese port
We load the bundles on the vessel your forwarder books. Freight, insurance and everything from the ship’s rail on are yours.
About FOB →CIF
Cost, Insurance and Freight to your port
We book the ocean freight and the marine insurance to the Caribbean port named in the contract. Unloading, import clearance and duties stay with you and your broker.
About CIF →Caribbean logistics
35 Caribbean ports, the Panama Canal route and the transshipment hubs.
Ports and routes →Shipping simulator
Pick your port and follow the bundles from our plant to your quay.
Run the simulator →Import papers
The documents your customs broker asks for, ready with every shipment.
Customs documents →Industrial estates
Steel for the estates and free zones of twelve countries
Warehouses, plants and workshops for the estates where Caribbean industry grows. Each estate guide covers its ground, its loads and the steel it asks for; World Steel has no plot or crew there and ships the steel FOB or CIF.
26 countries and territories
Pick your country for its port, hazards and regions
CARICOM members · 15
CARICOM associate members · 5
Caribbean projects
Our Caribbean work: Guyana and Antigua and Barbuda
For Guyana: an office building, 6 warehouses, 2 large maintenance workshops, pedestrian footbridges and a mosque. For Antigua and Barbuda: a residential building. World Steel designs and fabricates the steel in its plant in Vietnam and ships it to the port. The local contractor, our customer, erects it.
Photo
Guyana · 2026
Guyana Mosque
18 m × 21 m (59 ft × 69 ft), two floors, plate girders up to 1.5 m (4.9 ft) deep
Photo
Guyana · 2026
18 Guyana footbridges
Enclosed box-truss pairs, spans 26 m to 47.5 m (85 ft to 156 ft)
3D model
Guyana · 2022
Guyana Warehouse
Pre-engineered steel warehouse with office front
3D model
Guyana · 2022
Guyana Warehouse 2
Second warehouse for Guyana the same year
3D model
Antigua and Barbuda · 2023
Proposed Residential Building
Multi-storey residential steel frame for a waterfront site
Who does what
We make the steel; your team builds and seals the job
World Steel, in Vietnam
- Design calculations to the codes your engineer names
- Approval, shop and erection drawings at no extra cost
- Fabrication, welding and coating in our own plant
- Packing in erection order, FOB or CIF to your port
- Engineering support by phone and video during erection
You and your project team
- Engineer of record review, approval and seal
- Building permit and local inspections
- Import clearance, duties and delivery to site
- Foundations, anchor bolts and site work
- Steel erection with your own crew
Q&A
Caribbean solutions: common questions
Which Caribbean countries do you supply?
All 26 countries and territories on our Caribbean pages: the 15 CARICOM members plus neighbours such as the Dominican Republic, Puerto Rico, the Cayman Islands, Aruba and Curaçao. Each one has its own solutions page with its port, hazards and regions.
How much steel can you fabricate for one Caribbean project?
Our own plant fabricates 2,500 t of structural steel a month. Large jobs are released area by area so the steel arrives in the order your crew erects it. Our largest single job so far is the Sunpro Steel Factory, about 5,000 t.
Do you erect the steel in the islands?
No. World Steel designs, fabricates, coats and ships the steel structure. The local contractor, our customer, erects it, builds the foundations and runs the site, and our engineers support the crew by phone and video.
Who approves and seals the drawings?
Your engineer of record. We prepare the design calculations and the approval, shop and erection drawings for that engineer to review; the approval, the seal and the building permit stay with the project team in your country.
Which supply terms do you offer for the Caribbean?
FOB at a Vietnamese port or CIF to the Caribbean port named in the contract. Import clearance, duties and delivery from the port to site stay with you and your customs broker.
How is the steel protected against salt air?
Each member is blasted and coated in our plant with an ISO 12944 system for its corrosivity category, usually C5 on the coast and CX in the spray zone. Hot-dip galvanizing or a duplex system can be arranged with a galvanizer named for the project.
Is the steel designed for hurricanes and earthquakes?
Yes, to the loads your engineer of record sets for the site: wind speed, exposure and topography for hurricanes, and the seismic design category where earthquakes govern. We design to ASCE 7 and AISC, including AISC 341 where seismic detailing is required.
Have you supplied projects in the Caribbean before?
Yes. For Guyana we fabricated 18 pedestrian footbridges, warehouses, workshops, an office building and a mosque; for Antigua and Barbuda, a residential building. See the Caribbean projects on this page.