Wisconsin · Farm buildings
Structural steel for Wisconsin farm and dairy buildings
Wisconsin dairies keep getting larger, and large herds need large buildings: freestall barns, milking parlors, calf barns, feed storage and machine sheds. These are wide-span buildings that stand in wet, ammonia-laden air inside and heavy snow and wind outside.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and sent by rail through Chicago to your Wisconsin site.
- Farms
- Large dairies
- Buildings
- Barns, parlors, sheds
- Inside
- Wet, corrosive air
- Outside
- Snow and wind
Why it matters
Wide spans that last in a barn
Barn air is humid and corrosive, so bare and poorly coated steel rusts fast near the floor and the ridge. Wide clear spans keep the floor open for stalls, alleys and machines, and the roof has to carry Wisconsin snow and drift where barns sit side by side.
Our plant has built steel for Haid feed plants in Vietnam, a repeat customer. We design or detail wide-span frames for the site snow and wind, specify hot-dip galvanizing for barn exposure, and pack the steel so the crew can erect it fast between seasons.
What we design and fabricate
Steel for farm buildings
Wide-span barns
Clear-span frames for freestall and calf barns.
Galvanizing
Hot-dip galvanizing for wet barn air.
Big doors
Framing for machine and feed doors.
Snow-ready roofs
Frames and purlins for snow and drift.
Who does what
Farm steel, split clearly
World Steel supplies
- Barn, parlor and shed frame design or detailing
- Galvanizing for barn exposure
- Members packed in erection order
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Herd, ventilation and layout design with the farm
- Engineer of Record approval and PE seal where required
- Permits and inspections
- Stalls, equipment and manure systems
- Erection and site work
Wisconsin
What we do not claim
World Steel names no Wisconsin farm as a customer and claims no completed Wisconsin barn. Haid feed plants are projects in Vietnam.
Wisconsin ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Wisconsin contractors
Wisconsin contractors: let’s win the next project together
If your next bid involves farm and dairy buildings, World Steel wants to be your long-term, win-win steel partner in Wisconsin. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Wisconsin project is cut, welded, inspected and packed.
Q&A
What Wisconsin buyers ask
Do you galvanize barn steel?
Yes. Hot-dip galvanizing is our usual choice for steel in wet, corrosive barn air.
How wide can a barn span?
As wide as the layout needs, with frames designed for the site snow and wind.
Have you built agricultural plants?
Yes. Our plant supplied steel for Haid feed plants in Vietnam, published on our projects page.
Official sources: Wisconsin Department of Agriculture, Trade and Consumer Protection
Wisconsin solutions
Every Wisconsin guide
Related pages
Code facts on this page summarize Wisconsin practice, the Wisconsin Commercial Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Wisconsin?
Send the drawings or the site address, size and use. We set the Wisconsin design basis with your Engineer of Record, design or detail the steel to the Wisconsin Commercial Building Code and to snow, drift and frost, and quote it made in our plant in Vietnam, packed in erection order for rail through Chicago to your site.