Washington, DC · Venues
Long-span structural steel for DC stadiums and arenas
Washington has a ballpark at the Navy Yard, arenas downtown, a convention center and the former RFK Stadium campus being planned for a new stadium and mixed use. Venues like these need long-span roof trusses, cantilevers and heavy built-up members that still arrive on city streets. We fabricate that steel in shippable pieces.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Baltimore for your Washington, DC site.
- Venues
- Ballpark, arenas, halls
- Roofs
- Long-span trusses
- Members
- Built-up and heavy
- Pieces
- Sized for city trucks
Why it matters
Long spans, short streets
A long-span roof needs deep trusses and heavy members, but every piece must fit a truck on city streets and a crane on a crowded site.
We fabricate trusses, built-up girders and cantilever steel in shippable pieces with field splices detailed in Tekla, trial-fit where specified and packed in lift order.
What we design and fabricate
Steel for long-span venues
Roof trusses
Deep trusses and girders for column-free bowls and halls.
Built-up members
Heavy plate girders and boxes to the design.
Field splices
Splices detailed so pieces fit city trucks.
Lift order
Pieces packed in the order the crane lifts them.
Who does what
Hangar steel, split clearly
World Steel supplies
- Long-span frames and door headers
- Crane runways and mezzanines
- Releases matched to the erection sequence
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Aircraft and door data from the owner
- Engineer of Record approval and PE seal
- Hangar door supply and installation
- Fire protection and foundations
- Erection and site work
Washington, DC
What we do not claim
World Steel names no DC venue or team as a customer and claims no completed DC venue. Venue design is by the owner’s Engineer of Record.
Washington, DC ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Washington, DC contractors
Washington, DC contractors: let’s win the next project together
If your next bid involves venues and long spans, World Steel wants to be your long-term, win-win steel partner in Washington, DC. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Washington, DC project is cut, welded, inspected and packed.
Q&A
What Washington, DC buyers ask
Can you fabricate long-span trusses?
Yes. We fabricate trusses and built-up girders in shippable pieces.
How do large pieces reach the site?
They are spliced to fit trucks and packed in lift order.
Do you name venues as customers?
No. World Steel names no company as a customer on this site.
Official sources: Events DC
Washington, DC solutions
Every Washington, DC guide
Related pages
Code facts on this page summarize Washington, DC practice, the DC Construction Codes, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Washington, DC?
Send the drawings or the site address, size and use. We set the Washington, DC design basis with your Engineer of Record, design or detail the steel to the DC Construction Codes, and quote it made in our plant in Vietnam, packed in erection order and delivered through Baltimore to your site.