Colorado · Aerospace
Structural steel for Colorado aerospace plants
Colorado has one of the largest aerospace economies in the US, with satellite, launch vehicle, aircraft and research work from Boulder and Louisville to Littleton, Denver and Colorado Springs. Assembly and test halls are tall and column-free, with overhead cranes and very large doors, and they sit under Front Range snow and wind.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed on the West Coast and railed to Denver for your Colorado site.
Summit registerAerospace plants
- Clusters
- Boulder to Colorado Springs
- Halls
- Tall and column-free
- Inside
- Cranes and test areas
- Doors
- Very large openings
Why it matters
Height, span and a door the size of a wall
An aerospace hall clears a lot of height under the crane hook, spans wide without interior columns, and often has a door that takes up most of one end wall. The door frame carries snow above it and wind across it, and the roof carries the crane runways and the services below.
We design or detail deep trusses or built-up frames, crane runways and the door framing to your Engineer of Record’s criteria, and release the steel bay by bay. Clean and test areas get the platforms and support steel they need.
What we design and fabricate
Steel for aerospace halls
Long spans
Trusses and built-up frames for column-free halls.
Crane runways
Runway beams and brackets for overhead cranes.
Door framing
Large door frames for snow and wind.
Platforms
Access and equipment platforms for test areas.
Who does what
Aerospace steel, split clearly
World Steel supplies
- Frame, truss and runway design or detailing
- Door framing and platforms
- Packages released bay by bay
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Owner security and access rules
- Engineer of Record approval and PE seal
- Local permit and inspections
- Cranes, doors and process equipment
- Erection and site work
Colorado
What we do not claim
World Steel names no aerospace company as a customer and claims no completed Colorado aerospace building.
Colorado ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Colorado contractors
Colorado contractors: let’s win the next project together
If your next bid involves aerospace plants, World Steel wants to be your long-term, win-win steel partner in Colorado. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Colorado project is cut, welded, inspected and packed.
Q&A
What Colorado buyers ask
How wide can you span without columns?
As wide as the hall needs, with deep trusses or built-up frames designed to your Engineer of Record’s criteria.
Do you supply crane runways?
Yes. Runway beams, brackets and crane columns are part of the package.
Can you meet owner security rules?
We work to the document and access rules your contractor and owner set for the project.
Official sources: Colorado Office of Economic Development: aerospace
Colorado solutions
Every Colorado guide
Related pages
Code facts on this page summarize Colorado practice, local IBC adoption, county snow tables, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the county or city building department confirm the code and edition in force for your project.
Building in Colorado?
Send the drawings or the site address, size and use. We set the Colorado design basis with your Engineer of Record, design or detail the steel to your local code, snow table and wind, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.