Oklahoma · Oil and gas
Structural steel for Oklahoma oil, gas and energy
Oil and gas built modern Oklahoma, from the Anadarko and Arkoma basins to the storage hub at Cushing, and wind farms now cover much of the west. Energy facilities need compressor and equipment buildings, process structures, pipe racks and platforms, built to owner specifications and coated for the service.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Port Houston and trucked north to your Oklahoma site.
- Basins
- Anadarko and Arkoma
- Hub
- Cushing storage
- Structures
- Racks, shelters, platforms
- Coatings
- Galvanizing or systems
Why it matters
Built to owner specifications
Energy owners write their own specifications for steel, welding, coatings and inspection, on top of the code. Facilities are often built in modules and phases, with the same racks and shelters repeated across many sites.
Our plant built 2,000 t of structural steel for the Long Son petrochemical complex in Vietnam. We fabricate racks, platforms and shelters to the owner’s specification and inspection plan, with hot-dip galvanizing or coating systems for the service.
What we design and fabricate
Steel for energy facilities
Pipe racks
Racks and crossings built in repeatable modules.
Compressor buildings
Equipment buildings with crane rails and access.
Platforms
Access platforms, stairs and walkways.
Coatings
Hot-dip galvanizing or coating systems for the service.
Who does what
Energy steel, split clearly
World Steel supplies
- Rack, platform and shelter design or detailing
- Fabrication to the owner’s specification
- Inspection and test plan agreed per project
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Owner specifications and approvals
- Engineer of Record approval and PE seal
- Permits and inspections
- Process equipment and piping
- Erection and site work
Oklahoma
What we do not claim
World Steel names no oil, gas or energy company as a customer and claims no completed Oklahoma energy facility. The Long Son reference is a project in Vietnam.
Oklahoma ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Oklahoma contractors
Oklahoma contractors: let’s win the next project together
If your next bid involves oil, gas and energy, World Steel wants to be your long-term, win-win steel partner in Oklahoma. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Oklahoma project is cut, welded, inspected and packed.
Q&A
What Oklahoma buyers ask
Can you work to an owner’s specification?
Yes. We fabricate to the owner’s steel, welding, coating and inspection specifications, agreed in the inspection and test plan.
Do you galvanize?
Hot-dip galvanizing is arranged for the members that need it, with the specified coating thickness.
Can you repeat modules across sites?
Yes. We keep the model and details so repeat racks and shelters are released faster.
Official sources: Oklahoma Corporation Commission
Oklahoma solutions
Every Oklahoma guide
Related pages
Code facts on this page summarize Oklahoma practice, the IBC as adopted by the Oklahoma Uniform Building Code Commission, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Oklahoma?
Send the drawings or the site address, size and use. We set the Oklahoma design basis with your Engineer of Record, design or detail the steel to the statewide code and to tornado, hail, ice and seismic loads, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.