Warehouse and industrial · Thailand · 2024
M&D project, Thailand
2,000 tabout 2,200 short tons
Steel structure designed, fabricated and supplied by World Steel.
What makes this project type different
A modern distribution center is a very large, very simple building. The racking plan sets the column grid and the clear height, the docks set the wall framing, and the roof carries sprinklers, lighting, solar panels and, in the north, a lot of snow. Because the same frame repeats, small decisions on bay spacing and frame type move the total tonnage more than anything else.
Repetition also shapes fabrication and shipping. Identical frames run through the shop in batches, are bundled by gridline and arrive in the order the erector works across the slab. That is where a plant that fabricates 2,500 metric tons a month keeps a large warehouse on schedule.
Racking and trailer courts set the grid; every meter of clear height adds steel to every column.
Snow, drifts at high-low roofs, ponding and roof-top solar can govern the purlins and frames.
Large roofs see high uplift at edges and corners, which sets purlin bracing and connections.
Dozens of dock doors in a wall need wall framing and bracing laid out with the dock plan.
On a large footprint, kilograms per m² is the number owners compare.
Member lengths and nesting decide how many containers the job needs.
Structures and systems
Your Engineer of Record chooses the systems. These are the ones we see most often in this type of project, all fabricated in our plant in Vietnam.
| Structure | Typical system | What we fabricate |
|---|---|---|
| Main frames | Tapered rigid frames, single or multi-span | Built-up columns and rafters, base plates, connections |
| Roof | Cold-formed purlins, or joists and girders | Purlins, bracing, roof steel for solar and services |
| Walls | Girts, wind columns and dock framing | Girts, jambs, headers, canopies |
| Pick modules | Mezzanines and platforms inside the building | Mezzanine frames, deck support, stairs and rails |
| Office and amenity | Two-story office or amenity block | Multi-story frame in the same model |
Our advice before you bid
Our engineers run the frame at different spacings and report the tonnage of each, so the grid is chosen on numbers.
High-low roofs, parapets and rooftop equipment create drifts that are easy to miss in a bid.
Adding solar later can mean reinforcing a whole roof. Allow for it, or rule it out, at design.
We show how the package ships, member lengths and all, before you sign.
Bundles marked by gridline and sequence let the erector start on one end and keep moving.
World Steel projects of this type
Steel designed, fabricated and supplied by World Steel. Photos are from our project archive and open full size.
Warehouse and industrial · Thailand · 2024
2,000 tabout 2,200 short tons
Steel structure designed, fabricated and supplied by World Steel.
Real photos
World Steel’s own shop floors and jobs, where the steel for US projects is made: 2,500 metric tons of structural steel a month. Not stock images.
Inside our factory
How World Steel supports this
Design optimization
Bay spacing and frame types compared on tonnage before you commit.
Container-sized members
Splices planned so the package ships in standard containers.
2,500 t a month
Repeated frames fabricated in batches at full plant capacity.
The structural steel ecosystem
The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.
Photo
Photo
Photo
Photo
Photo
Photo
Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.
Standards on this page
Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.
Keep reading
Questions from US contractors
Large ones. Our capacity is 2,500 metric tons of structural steel a month, and the M&D project in Thailand used about 2,000 metric tons.
Either, or a mix. Tapered rigid frames are usually lightest for single-story warehouses; joists and girders or trusses can suit some grids and owners. We compare them for your layout.
Yes. Mezzanine frames, deck support, stairs and rails come in the same model and the same shipping plan.
Yes, when you want a complete package. Steel structure only is also available.
Yes. Shop drawings come with every project at no extra charge, from one Tekla Structures model of the whole job. Your Engineer of Record reviews and approves the structural drawings.
No. World Steel designs, fabricates and supplies the steel structure. Erection, the PE seal, the permit and site work are the scope of the US contractor, our customer.
A plain-English guide for US contractors, not engineering advice for a specific site. Ranges are typical, the adopted codes govern, and your Engineer of Record sets the design criteria for each project.
Send the drawings, the specification and the schedule. Our estimators take off the tonnage, confirm the production slot we can hold for it and return a written scope for steel designed to US codes, made in our plant in Vietnam and shipped to your US port by erection sequence.