Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Warehouse frame from above, purlins and girts fixed to the rafters and columns

Warehousing · distribution · fulfillment · cross-dock

Warehouses and distribution centers: thousands of square meters, one repeatable frame

In a large distribution center the same bay is repeated hundreds of times, so every kilogram saved in one frame is saved across the whole building. Design, fabrication and shipping are all about repetition done well, as on the M&D project in Thailand, about 2,000 metric tons.

Largest job
M&D project in Thailand, about 2,000 t
What decides the bid
Steel weight per m² and freight
Shipping
Members sized for containers and packed by sequence
M&D project, Thailand, structural steel by World Steel World Steel reference 2,000 t of structural steel M&D project, Thailand Warehouse and industrial · Thailand · 2024
Warehouses and distribution centers at a glanceTypical ranges · not design values
Typical spans
Multi-span frames with bays of 12 to 15 m (40 to 50 ft) and 30 to 60 m (100 to 200 ft) clear spans
Heights
Clear heights of 10 to 14 m (32 to 45 ft) for high-bay racking
Structural systems
Tapered rigid frames, multi-span frames, joist and girder roofs
Loads that size the steel
Roof snow, rain and drifts, wind uplift, sprinkler and solar loads
Codes and standards
ASCE 7-22, AISC 360, AISI S100, MBMA manual, FM Global where the owner requires
Coating and exposure
Dry interior; primer or galvanized secondary steel

What makes this project type different

What sizes the steel in warehouses and distribution centers

A modern distribution center is a very large, very simple building. The racking plan sets the column grid and the clear height, the docks set the wall framing, and the roof carries sprinklers, lighting, solar panels and, in the north, a lot of snow. Because the same frame repeats, small decisions on bay spacing and frame type move the total tonnage more than anything else.

Repetition also shapes fabrication and shipping. Identical frames run through the shop in batches, are bundled by gridline and arrive in the order the erector works across the slab. That is where a plant that fabricates 2,500 metric tons a month keeps a large warehouse on schedule.

Column grid and clear height

Racking and trailer courts set the grid; every meter of clear height adds steel to every column.

Roof loads

Snow, drifts at high-low roofs, ponding and roof-top solar can govern the purlins and frames.

Wind uplift

Large roofs see high uplift at edges and corners, which sets purlin bracing and connections.

Docks and openings

Dozens of dock doors in a wall need wall framing and bracing laid out with the dock plan.

Weight per square meter

On a large footprint, kilograms per m² is the number owners compare.

Freight

Member lengths and nesting decide how many containers the job needs.

Structures and systems

The structures in a typical package, and what we fabricate

Your Engineer of Record chooses the systems. These are the ones we see most often in this type of project, all fabricated in our plant in Vietnam.

Typical structures and systems for Warehouses and distribution centers
StructureTypical systemWhat we fabricate
Main framesTapered rigid frames, single or multi-spanBuilt-up columns and rafters, base plates, connections
RoofCold-formed purlins, or joists and girdersPurlins, bracing, roof steel for solar and services
WallsGirts, wind columns and dock framingGirts, jambs, headers, canopies
Pick modulesMezzanines and platforms inside the buildingMezzanine frames, deck support, stairs and rails
Office and amenityTwo-story office or amenity blockMulti-story frame in the same model

Our advice before you bid

Decisions that save steel, time and rework

  • Compare two or three bay spacings

    Our engineers run the frame at different spacings and report the tonnage of each, so the grid is chosen on numbers.

  • Check drifts at every roof step

    High-low roofs, parapets and rooftop equipment create drifts that are easy to miss in a bid.

  • Decide on rooftop solar now

    Adding solar later can mean reinforcing a whole roof. Allow for it, or rule it out, at design.

  • Ask for a container plan

    We show how the package ships, member lengths and all, before you sign.

  • Ship by gridline

    Bundles marked by gridline and sequence let the erector start on one end and keep moving.

World Steel projects of this type

Built by World Steel, from our own plant

Steel designed, fabricated and supplied by World Steel. Photos are from our project archive and open full size.

Warehouse and industrial · Thailand · 2024

M&D project, Thailand

2,000 tabout 2,200 short tons

Steel structure designed, fabricated and supplied by World Steel.

Real photos

From our plant in Vietnam

World Steel’s own shop floors and jobs, where the steel for US projects is made: 2,500 metric tons of structural steel a month. Not stock images.

Inside our factory
Open floor of a clear-span warehouse with no interior columns Photo
Exported steel in place in Philippines: a World Steel job abroad, shown for the building type rather than a US site.
Long-span warehouse inside an industrial campus, seen by drone Photo
World Steel building abroad, from the air (location not stated).

How World Steel supports this

Designed to US codes, made in our plant in Vietnam

Design optimization

Bay spacing and frame types compared on tonnage before you commit.

Container-sized members

Splices planned so the package ships in standard containers.

2,500 t a month

Repeated frames fabricated in batches at full plant capacity.

The structural steel ecosystem

Products and solutions behind this guide

The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.

The industry behind this guide

World Steel projects of this type

Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related solutions

Questions from US contractors

Warehouses and distribution centers: questions we hear

What size of distribution center can you supply?

Large ones. Our capacity is 2,500 metric tons of structural steel a month, and the M&D project in Thailand used about 2,000 metric tons.

Pre-engineered frames or conventional steel?

Either, or a mix. Tapered rigid frames are usually lightest for single-story warehouses; joists and girders or trusses can suit some grids and owners. We compare them for your layout.

Can you supply the mezzanines and pick modules too?

Yes. Mezzanine frames, deck support, stairs and rails come in the same model and the same shipping plan.

Do you supply roof and wall panels?

Yes, when you want a complete package. Steel structure only is also available.

Are shop drawings included?

Yes. Shop drawings come with every project at no extra charge, from one Tekla Structures model of the whole job. Your Engineer of Record reviews and approves the structural drawings.

Does World Steel erect the steel?

No. World Steel designs, fabricates and supplies the steel structure. Erection, the PE seal, the permit and site work are the scope of the US contractor, our customer.

A plain-English guide for US contractors, not engineering advice for a specific site. Ranges are typical, the adopted codes govern, and your Engineer of Record sets the design criteria for each project.

Bidding warehouses and distribution centers?

Send the drawings, the specification and the schedule. Our estimators take off the tonnage, confirm the production slot we can hold for it and return a written scope for steel designed to US codes, made in our plant in Vietnam and shipped to your US port by erection sequence.