Indiana · Battery and auto
Structural steel for Indiana battery and auto plants
Indiana makes vehicles and engines in Lafayette, Fort Wayne, Princeton and Kokomo, and new battery plants are rising in the north and center of the state. These plants combine long column-free halls, process mezzanines, heavy roof equipment and miles of utility steel, on packages measured in thousands of tons.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by port, rail and truck to your Indiana site.
- Buildings
- Battery, vehicle, engine plants
- Spans
- Long, column-free halls
- Key loads
- Roof plant, mezzanines
- Our part
- Very large packages, phased
Why it matters
Thousands of tons on one schedule
Battery and auto plants are some of the largest steel packages in the Midwest. The main halls, mezzanines, utility racks and roof equipment frames all have to arrive in the order the erector needs them.
Our plant fabricates 2,500 t of structural steel a month. We split the package by area and release it in erection sequence, and you follow every member through fabrication and loading in PEB Studio.
What we design and fabricate
Steel for battery and auto plants
Long-span halls
Clear spans for open production lines.
Stiff mezzanines
Platforms for process equipment and vibration limits.
Roof plant steel
Dunnage and frames for air handling and exhaust.
Utility racks
Steel for trays, ducts and process piping.
Who does what
Plant steel, split clearly
World Steel supplies
- Hall, mezzanine and utility steel design or detailing
- A release plan matched to your erection sequence
- Fabrication at 2,500 t a month in our own plant
- Live tracking of every member in PEB Studio
- Tekla shop and erection drawings, included
The US contractor arranges
- Process and equipment data from the owner
- Foundations, slabs and dry rooms
- Engineer of Record approval and PE seal
- Design release, permits and inspections
- Erection and site work
Indiana
What we do not claim
World Steel names no automaker or battery maker as a customer and claims no completed Indiana plant.
Indiana ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Indiana contractors
Indiana contractors: let’s win the next project together
If your next bid involves battery and auto plants, World Steel wants to be your long-term, win-win steel partner in Indiana. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Indiana project is cut, welded, inspected and packed.
Q&A
What Indiana buyers ask
Can you supply a package of several thousand tons?
Yes. Our largest single project is 5,000 t. We release large packages in phases at up to 2,500 t a month.
Do you follow the owner’s structural specification?
Yes. We follow the owner’s specification and your Engineer of Record’s design basis.
Can you supply the utility steel too?
Yes. Racks, tray and duct supports and equipment frames can be in the same package.
Official sources: Indiana Economic Development Corporation
Indiana solutions
Every Indiana guide
Related pages
Code facts on this page summarize Indiana practice, the Indiana Building Code, the state Construction Design Release, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the reviewing authority confirm the code and edition in force for your project.
Building in Indiana?
Send the drawings or the site address, size and use. We set the Indiana design basis with your Engineer of Record, design or detail the steel ready for the state design release and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.