Dear US Contractors, Partners and Friends,
On behalf of World Steel Group, thank you for visiting World Steel USA. I extend my warmest greetings and best wishes to the contractors, owners and engineers who build America’s industrial, commercial and infrastructure projects.
Since 2012 we have grown from a Vietnamese steel structure company into a fabricator that ships around the world. Every building we supply to the United States is designed in our engineering office and fabricated in our own 20,000 m² (215,000 sq ft) plant in Tay Ninh Province, Vietnam, which turns out 2,500 metric tons of structural steel a month. In 2019 we shipped our first project to the United States and became the first and only steel building fabricator in Vietnam accredited under IAS AC472. Independent IAS experts audit our design office and our shop floor twice a year.
Our promise to US contractors is simple: we supply the structural steel, and we supply it right. We design to the codes your permit uses, such as IBC 2024, ASCE 7-22 and AISC 360, prepare calculations and shop drawings for your Engineer of Record to review and approve, and fabricate every member in our own plant. Steel is bundled to your erection sequence and shipped to the US port nearest your job. Your team erects it, and our project managers support you from the first drawing to the last container.
We also want you to see your steel while it is being made. In PEB Studio you can follow your own members through cutting, welding, coating and QC release in real time, and you can witness inspections live online or visit our plant in person. Our US office in Westminster, California, and our sales team are here to answer your questions.
Our core values guide how we work with every customer:
- Integrity: Ensuring adherence to strong ethical principles and reliability.
- Ownership: Demonstrating creativity, expanding responsibilities and nurturing projects and relationships.
- Professionalism: Adapting competently and flexibly to work challenges.
- Respect: Fostering positivity, cooperation and enthusiasm.
- Listening: Encouraging understanding, trust and cooperation through attentive listening.
With the motto “Building Trust, Assuring Success,” we aim to be the steel partner US contractors can count on, project after project, as they win and deliver larger work across the country.
Thank you for considering World Steel. We look forward to building with you.
Warm regards,