Plan the split early
Piece sizes are a design decision
Shipping limits shape a remote-site package from the start. Container and flat-rack dimensions, road limits on the inland route and the cranes the erector will have on site decide how big each piece can be. We agree those limits with you and your erector before detailing, then place bolted splices so that galleries, towers and frames break into pieces that ship and lift easily.
Bolted field connections replace field welding wherever the design allows. That cuts the number of certified welders needed in camp, the weather risk and the inspection work on site.
From our plant to your site
How a remote-site package travels
-
Packed by area
Members bundled by area and erection sequence, with packing lists per container and per bundle.
-
Shipped to your US port
Ocean freight from Vietnam to the West, Gulf or East Coast port that suits the inland route.
-
Inland by agreement
Rail or truck to the site, arranged by you or as agreed in the Incoterm.
-
Found on site
Piece marks match the erection drawings, and PEB Studio shows what is in each container.
Less risk on a remote site
What makes a package easy to erect far from town
Complete by area
Each area ships with its bolts, plates and small parts, so crews are not waiting for a missing box.
Clear piece marks
Marks on every member and bundle, matching the erection drawings.
Bolted, not welded
Field splices bolted wherever the design allows.
Visible in PEB Studio
Fabrication, QC release and loading visible online for your team.