Nebraska · Ag energy
Structural steel for Nebraska ethanol and ag processing plants
Nebraska is one of the largest ethanol producers in the country, with plants, grain terminals and soybean and corn processors spread across the corn belt. Their process buildings, platforms and equipment structures follow the owner’s specifications. We fabricate and galvanize that steel in our plant.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail to Omaha for your Nebraska site.
- Market
- Top ethanol state
- Typical steel
- Process buildings
- Coatings
- Galvanized outdoors
- Spec
- Owner specifications
Why it matters
Process steel beside the corn
An ethanol or soybean plant mixes process buildings, grain receiving, platforms and pipe and equipment supports, much of it outdoors in hard wind and winter cold.
We fabricate to the owner’s specifications and inspection plan, galvanize exposed steel and pack it by system so the site can erect one area at a time.
What we design and fabricate
Steel for energy sites
Equipment structures
Platforms and supports for process and electrical equipment.
Plant buildings
Process, compressor and maintenance buildings.
Galvanized steel
Hot-dip galvanizing for exposed outdoor steel.
Owner specifications
Fabrication to the owner’s project specifications.
Who does what
Energy steel, split clearly
World Steel supplies
- Plant buildings, platforms and equipment steel
- Fabrication to owner specifications
- Galvanizing or coating systems for the exposure
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Process design and equipment data from the owner
- Engineer of Record approval and PE seal
- Foundations and equipment setting
- Piping, electrical and controls
- Erection and site work
Nebraska
What we do not claim
World Steel names no Nebraska energy or utility company as a customer and claims no completed Nebraska energy project. Process design and equipment are the owner’s scope.
Nebraska ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Nebraska contractors
Nebraska contractors: let’s win the next project together
If your next bid involves ethanol and ag processing, World Steel wants to be your long-term, win-win steel partner in Nebraska. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Nebraska project is cut, welded, inspected and packed.
Q&A
What Nebraska buyers ask
Do you work to owner specifications?
Yes. We fabricate to the owner’s project specifications and inspection plan.
Can you galvanize outdoor steel?
Yes. Hot-dip galvanizing is available for exposed members.
Do you supply process equipment?
No. Process design and equipment are the owner’s scope.
Official sources: Nebraska Ethanol Board
Nebraska solutions
Every Nebraska guide
Related pages
Code facts on this page summarize Nebraska practice, the Nebraska State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Nebraska?
Send the drawings or the site address, size and use. We set the Nebraska design basis with your Engineer of Record, design or detail the steel to the Nebraska State Building Code and to blizzard snow and plains wind, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail to Omaha for the truck to your site.