Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Alaska · Oil and gas

Structural steel for Alaska oil and gas facilities

Alaska’s oil and gas comes from the North Slope around Prudhoe Bay and from Cook Inlet, with new fields under development. Facilities there need process buildings, module steel, pipe supports and platforms built to detailed owner specifications for Arctic cold. We fabricate that steel.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped by sea through Tacoma to Anchorage for your Alaska site.

Long hot-dip galvanized ladder cages lying in a yard
Hot-dip galvanized ladder cages for a 50 m (164 ft) tower job, Vietnam.
Fields
North Slope, Cook Inlet
Typical steel
Modules, pipe supports
Cold
Arctic toughness
Spec
Owner specifications

Why it matters

Arctic steel to owner specs

North Slope work uses modules and steel that must be tough at very low temperatures, sealed into a short sealift or ice road window. Owners specify materials, toughness, coatings and inspection in detail.

We fabricate to the owner’s specifications and inspection plan, supply plate with Charpy results on request and pack steel by system for the sealift or truck.

What we design and fabricate

Steel for energy sites

Equipment structures

Platforms and supports for process and electrical equipment.

Plant buildings

Process, compressor and maintenance buildings.

Galvanized steel

Hot-dip galvanizing for exposed outdoor steel.

Owner specifications

Fabrication to the owner’s project specifications.

Who does what

Energy steel, split clearly

World Steel supplies

  • Plant buildings, platforms and equipment steel
  • Fabrication to owner specifications
  • Galvanizing or coating systems for the exposure
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Process design and equipment data from the owner
  • Engineer of Record approval and PE seal
  • Foundations and equipment setting
  • Piping, electrical and controls
  • Erection and site work

Alaska

What we do not claim

World Steel names no Alaska energy or utility company as a customer and claims no completed Alaska energy project. Process design and equipment are the owner’s scope.

Alaska ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Alaska contractors

Alaska contractors: let’s win the next project together

If your next bid involves oil and gas facilities, World Steel wants to be your long-term, win-win steel partner in Alaska. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Alaska project is cut, welded, inspected and packed.

Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Crew loading steel parts onto the shot-blasting conveyor
Parts going into the blaster ahead of primer, World Steel, Vietnam.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.

Q&A

What Alaska buyers ask

Do you work to operator specifications?

Yes. We fabricate to the owner’s project specifications and inspection plan.

Can you meet Arctic toughness?

Yes. We specify steel with Charpy testing for the design temperature on request.

Do you name operators as customers?

No. World Steel names no company as a customer on this site.

Official sources: Alaska Oil and Gas Conservation Commission

Alaska solutions

Every Alaska guide

Related pages

Code facts on this page summarize Alaska practice, the IBC as adopted for your Alaska site, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Alaska?

Send the drawings or the site address, size and use. We set the Alaska design basis with your Engineer of Record, design or detail the steel for great-earthquake seismic, heavy snow and deep cold, and quote it made in our plant in Vietnam, packed by bay in erection order and shipped by sea through Tacoma to Anchorage.