Harbor warehouses
Kapolei, Sand Island and Kahului
Clear-span sheds and warehouses with coatings for salt air.
M&D warehouse, Thailand: 2,000 t of World Steel structural steel
Six island hubs
From the towers of Honolulu and the industrial parks of West Oahu to the resort coasts of Maui and the volcano country of the Big Island, Hawaii’s large projects gather in six places. Each has its own buildings and its own weather.
Multi-story buildings, harbor and public work.
Warehouses, energy and industrial plants.
Public buildings, shops and salt spray.
Hotels, rebuilding and harbor sheds.
Higher seismic hazard and long trucking.
Resorts, utilities and public work.
Tall buildings and the harbor.
Industrial parks and warehouses.
Constant salt spray and trade winds.
Hotels and rebuilding.
Seismic and volcanic hazard.
Resorts and utilities.
Hawaii guides
One guide per Hawaii condition: county codes, hurricane wind, Big Island seismic, salt air, direct ocean freight, and the warehouse, hotel and energy projects that drive the market.
Ready for Hawaii
2,500 metric tons of structural steel a month from our own plant, released area by area.
Large-project program →Calculations that state the state code edition your county enforces, its amendments and the loads.
County building codes guide →A continuous load path and opening framing for high island wind and topographic speed-up.
Island hurricane wind guide →AWS D1.8-qualified welding procedures and welders, with protected zones marked on request.
Demand-critical welds →The first and only fabricator in Vietnam accredited under IAS AC472, with mill certificates traced by heat.
IAS AC472 accreditation →Tekla shop and erection drawings for every Hawaii project at no extra cost, ready for approval.
Shop drawings, included →Every member followed through cutting, welding, coating and loading in PEB Studio, from your office.
PEB Studio tracking →Steel packed in erection order and shipped by ocean freight to Honolulu Harbor.
Direct ocean freight guide →Solution advisor
Structural steel for the project types Hawaii builds most, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.
Kapolei, Sand Island and Kahului
Clear-span sheds and warehouses with coatings for salt air.
M&D warehouse, Thailand: 2,000 t of World Steel structural steel
Honolulu, Waikiki and Maui
Composite floor framing and lateral frames for wind and seismic.
College of Medicine, Philippines: multi-story steel frame by World Steel
Campbell Industrial Park and every island
Plant buildings and equipment steel to owner specifications.
GPPD Energy factory, Vietnam: plant steel by World Steel
Honolulu Harbor and Nawiliwili
Port sheds and maintenance halls in salt air.
Interlink factory, Thailand: plant steel by World Steel
Oahu and Maui
Cold rooms for imported food, with thermal breaks.
New Era cold storage, Vietnam: 1,000 t of World Steel structural steel
Honolulu, Kahului and Kona
Long-span hangars with coatings for island air.
Hangar, Thailand: long-span World Steel frames
Oahu and the Big Island
Processing halls with washdown and salt-air coatings.
CPV Food processing plant, Vietnam: 2,500 t of World Steel structural steel
West Oahu
Production halls and crane bays.
Sunpro Steel factory, Vietnam: 5,000 t of World Steel structural steel
The Hawaii ecosystem
Structural steel by project type, building packages, products, engineering, supply and delivery: each one a page you can check.
Large Hawaii structures, beyond metal buildings.
Complete buildings engineered for Hawaii sites.
Members and parts made in our Vietnam plant.
The design basis your building official checks.
How you buy and follow your steel.
From the plant in Vietnam to your Hawaii site.
Open call · Hawaii contractors
Harbor warehouses and plants at Kapolei and Campbell Industrial Park, hotels and multi-story buildings on Oahu and Maui, energy and utility plants and public buildings on every island are large steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, coat it for salt air, ship it by ocean freight to Honolulu in erection order and back your bids with drawings and live tracking.
Where Hawaii partners win with us
Buying steel from outside the US
The questions Hawaii owners, contractors and engineers ask before they order steel made in Vietnam. Each one has a written answer and a page you can check.
Real World Steel photos
Real photos from World Steel: the plant front, plate store, saw station, girders, weld checks, blasting, primed columns and packed stacks. None is shown as a Hawaii site.
Worry-free shipping
Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.
We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.
West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.
The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.
The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.
A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.
Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.
Questions from Hawaii buyers
The Hawaii State Building Code, based on the IBC, as adopted by your county with local amendments. Honolulu, Maui, Hawaii and Kauai counties each adopt it and run their own permits. We confirm the edition and amendments your county enforces with your Engineer of Record.
We take ASCE 7 wind for each island and site, which is high across the state and higher where topography speeds up the wind, and the Seismic Design Category your Engineer of Record sets, which is highest on the Big Island. Frames, bracing and anchorage are designed for both.
Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t. Large packages are released area by area to match the erection sequence.
By sea, either way. We ship from our plant in Vietnam by ocean freight to Honolulu Harbor, with interisland barge service to Maui, Kauai and the Big Island. Members are packed in erection order and protected for the voyage.
No. World Steel supplies the steel structure only, to US contractors who are our customers. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.
Yes. Shop drawings come with every project at no extra charge, and you follow your members through cutting, welding, coating, QC release and loading in PEB Studio.
Talk to an engineer
Our engineers and project managers work in English and reply with the code, wind, seismic, coating and shipping questions for your site.
Honest status. World Steel designs and fabricates to the Hawaii State Building Code as your county adopts it and ASCE 7. We hold no state or local approval and no Hawaii engineering license, and we do not submit plans for approval or apply for permits; the seal, the permit and inspections are the US contractor’s scope with their Engineer of Record. We supply the steel structure only; erection and site work are the contractor’s.
Send the drawings or the site address, size and use. We set the Hawaii design basis with your Engineer of Record, design or detail the steel to your county’s code, hurricane wind and island seismic, coat it for salt air, prepare it for plan review, and quote it made in our plant in Vietnam, packed in erection order and shipped by ocean freight to Honolulu.