Clear-span rigid frame
Usually the lightest answer for moderate spans; tapered members from plate.
See the product →The game sets the span
Each sport brings its own surface, its own air and its own things to hang from the roof. Choose one to see the playing surface inside the hall and what it asks of the steel.
A basketball court is 28.65 × 15.24 m (94 × 50 ft).
A tennis court is 23.77 × 10.97 m (78 × 36 ft).
An NHL rink is 61 × 26 m (200 × 85 ft).
A 50 m pool is 25 m (82 ft) wide for ten lanes.
A large dressage arena is 20 × 60 m (66 × 197 ft).
Surface sizes are the published sizes of each sport, drawn to proportion inside an illustrative hall. Run-offs, clear heights and seating come from the owner, the architect and the governing body.
Four ways to span the game
We do not start from a catalogue frame. We compare the roof systems that fit your span and send the lightest one that keeps the floor clear, with the steel weight of each in the proposal.
Usually the lightest answer for moderate spans; tapered members from plate.
See the product →Deeper and lighter as spans grow, with room for ducts and catwalks between chords.
See the product →A curved profile that sheds wind and reads as architecture, like our Goldfields roof.
See the product →Two-way load paths over a large square plan, supported around the edge.
See the product →Hang it from the roof
Scoreboards, curtains, goals, lights, ducts and catwalks all hang from the roof. Send their weights and positions and we design each hanging point into the steel, so nothing ends up on a member that was not checked for it.
ScoreboardWeight, size and hanging points
Divider curtainsCurtain maker’s loads and track lines
Basketball goalsFolding goal maker’s reactions
LightingFixture weights and the lighting grid
HVAC ductsDuct routes and weights from the mechanical engineer
CatwalksAccess routes for lights and speakers
A long-span public building by World Steel
The Goldfields Arts Centre in Kalgoorlie-Boulder, Western Australia: a curved long-span roof over an open floor, with its curved rafters welded from plate in our Vietnam plant and exported. It is the kind of roof an arena or field house needs.
Photo
A curved long-span roof
Photo
Trusses at dusk
Photo
No columns on the floor
Photo
Roof steel going in
Photo
Where the arch meets the wall
Photo
Down the length
Photo
A curved rafter
Photo
Curved from plate
Photo
Rafters lined up
Photo
Connection plates A project outside the US, shown for its long-span roof; it is an arts centre, not a sports arena, and not a US site.
Fabrication capacity
2,500 metric tons a month
About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.
Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.
Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →Real World Steel frames
Long-span roofs start as trusses built in jigs and space frames checked before they ship. Tap a photo to open it full size.
Photo
A space truss roof
Photo
Trusses in a jig
Photo
A heavy truss Photos from our plant and projects outside the US, shown for the structure type.
Projects by World Steel
Buying steel from outside the US
US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.
The worry: “Will steel designed overseas pass US plan check?”
We design to the code your jurisdiction enforces: IBC 2024 and ASCE 7-22 by default, AISC 360 and AISC 341 for steel, plus state codes such as the California Building Code. Our calculations and drawings go to your Engineer of Record for review and approval, and the PE seal and permit stay with the US contractor, our customer.
The worry: “I can’t see the quality from across the Pacific.”
Our plant is the first and only fabricator in Vietnam accredited under IAS AC472, with written inspection procedures audited by IAS. Your special inspector or owner’s representative can visit, or inspect remotely over live video, and every QC release is logged with photos.
The worry: “Will the materials be traceable to the grade on the drawings?”
Steel is ordered to the ASTM grades you specify, mainly from mills in Vietnam. Plate and sections are stored by grade and heat number, and you receive EN 10204 type 3.1 mill certificates traced to the members they went into, with Charpy V-notch results when your project asks for them.
The worry: “What if pieces don’t fit when they reach the site?”
Every member is modeled in Tekla Structures and cut only after you approve the shop drawings, which are included at no extra charge. QC checks dimensions, holes and end plates against the drawing before a piece is released.
The worry: “How will I know where my order really is?”
You follow your own members through cutting, welding, coating, QC release, packing and loading in PEB Studio, online, at any hour. No waiting for a weekly email to find out what happened.
The worry: “Ocean freight scares me: damage, missing pieces, a port I don’t know.”
Steel is bundled and tagged in your erection sequence, with a packing list and photos for every container or breakbulk load. The quote names the US port of discharge, and the shipment is planned backward from your site date.
The worry: “Who handles customs and duties?”
Every quote states the Incoterm and who acts as importer of record, so nobody is surprised at the port. Our Section 232 page explains how US import rules apply to fabricated steel, from official sources only.
The worry: “Time zones and language will slow everything down.”
Our engineers and project managers work in English and in US units on request. One project manager owns your job from approval drawings to the last container, and our US office is in Westminster, California.
The worry: “Who erects it, and who stands behind the field work?”
World Steel supplies the steel structure only; we never erect. Our customers are US contractors: erection and field work are their scope, done from our erection drawings and piece marks, with our engineers on call for questions from the field.
The worry: “Who is responsible for the design?”
We put the split in writing: full design by World Steel, or a delegated design such as connections under your Engineer of Record, who keeps overall responsibility. You see exactly what we design and what stays with your team.
What the package contains
Players and spectators need one thing from the structure: no columns in the way. We span the court, turf or riding ring with rigid frames or trusses, plan bleacher and mezzanine framing alongside, and hang scoreboards, nets and lights from steel designed for them. Rinks and pools get coatings and condensation control chosen for the humidity inside.
standard = in the base scope · optional = add if you want it · confirm = depends on your design
Talk to an engineer
Our engineers work in English. Tell us what is played, how many people watch and what hangs from the roof, and we send a written scope for the steel.
Covered in our state guides
Asked by schools, clubs and contractors
11 answers on spans, rinks and pools, large projects and scope.
That depends on the sport, the loads and the roof shape. We compare rigid frames, trusses and curved trusses by steel weight in the proposal and send the option that keeps every column off the playing surface and its run-off.
For a single court a clear-span rigid frame is usually the lightest answer. As spans grow, trusses or a curved truss roof carry the load with less steel and leave room for ducts and catwalks between the chords. We price the options side by side.
The sport and its governing body set the clear height over the playing surface; the owner and architect confirm it. We design the frame to keep that height clear, below hung equipment and lights as well.
Yes. Ice rinks need condensation control over cold ice in warm, humid air. Pool halls have warm, chlorinated, very humid air. In both, the coating and the envelope details are chosen for that air, and we coordinate with the mechanical engineer who designs the dehumidification.
Yes. Scoreboards, divider curtains, basketball goals, speakers, lighting and catwalks are designed into the roof once their weights and positions are known, so nothing is hung from a member that was not checked for it.
We frame mezzanines, press boxes, stairs and the support steel around them. Telescopic and fixed seating systems come from their own makers; we design for their loads and fixing points.
Yes. Our plant in Vietnam fabricates 2,500 t (5.5 million lb) of structural steel a month, and our largest single job is about 5,000 t. Field houses, practice gyms and support buildings share one set of details and ship building by building, with production slots confirmed in the quote.
Yes. The Goldfields Arts Centre in Western Australia has about 400 t of World Steel steel in a curved long-span roof. Its curved built-up rafters were made in our Vietnam plant and exported.
IBC 2024, ASCE 7-22 and AISC 360 by default, or your jurisdiction’s edition. Arenas with large crowds often fall in a higher Risk Category under ASCE 7; your Engineer of Record confirms it. The PE seal and the permit belong to the US contractor, our customer, and their engineer. World Steel designs and fabricates; it does not seal drawings.
No. World Steel designs, fabricates and supplies the steel. Foundations, erection, the floor, seating and site work are the scope of the US contractor, our customer, and the trades they hire.
No. Send the sport, the seating, the size and the site address and we return a written scope and quotation.
Keep reading
Send the sport, the seating, the size and the site address. We compare roof systems for your span and send a written scope for the steel, made in our plant in Vietnam.